Reviews for High Bandwidth Transverse Feedback LARP: 10.06.2013 LIU: 2x.07.2013 W. Hofle
Post on 24-Feb-2016
50 Views
Preview:
DESCRIPTION
Transcript
1
Reviews for High Bandwidth Transverse Feedback
LARP: 10.06.2013LIU: 2x.07.2013
W. Hofle
CERN BE-RF-FB
W. Hofle @LIU Meetings 12 June 2013
12.06.2013
June 10, 2013
2W. Hofle @LIU Meetings 12 June 2013
12.06.2013
June 10, 2013
https://indico.fnal.gov/conferenceOtherViews.py?view=standard&confId=6836
Plenary session, CERN view presented by L. Rossi (remotely)
Three parallel sessions
• Magnets• Crab Cavities• Feedback project
Closeout, conclusions by external reviewers (no slides, there will be a report)
Details of external review (Fermilab, one day review) in Indico
LARP external Review 10.06.2013 (1)
3W. Hofle @LIU Meetings 12 June 2013
12.06.2013
June 10, 2013
LARP external Review 10.06.2013 (2)
External reviewers for Feedback: D. Teytelman (Dimtel), M. Brennan (BNL)
4W. Hofle @LIU Meetings 12 June 2013June 10, 2013
LARP external Review 10.06.2013 (2)
16.7 MUS$ without CERN contribution, 12.3 MUS$ with CERN contribution
5W. Hofle @LIU Meetings 12 June 2013June 10, 2013
CERN contributions as presented on LARP Budget Proposal
16.7 MUS$ without CERN contribution, 12.3 MUS$ with CERN contribution
• Minimum CERN contribution (4.47 M US$ in US accounting)
• Kicker prototype• Pick-up• Infrastructure and Integration (cabling, interfaces LLRF/software,
vacuum etc.)
• Optional CERN contributions (negotiable)
• Power amplifier, high power components• Spares• Diagnostics, monitoring
• LARP core contribution: Signal processing
June 10, 2013 W. Hofle @LIU Meetings 12 June 2013 6
CERN contributions as presented by W.H.
Accelerator Physics Support: Simulations, integration studies for implementation in SPS (optics, aperture, impedance)
Coordination, interface for potential contributions in Europe (for example kicker hardware from INF – Frascati)
Project fully integrated within LHC Injector Upgrade Project (LIU)
Engineering (FPGA and electronics development)
Pick-up design and construction
Fabrication of final system, vacuum structures, electronics
Integration of components, vacuum testing, tunnel infra-structure, cabling
Integration with Control System
Machine Developments, Commissioning
W. Hofle @LIU Meetings 12 June 2013
Intra-bunch Damping at Work: CERN PS Transverse Feedback
7
A. Blas et al. IPAC’13, WEPME011D. Perrelet (CERN BE-RF)
10 ns/div
PS TFB ON
10 ns/div
PS TFB OFF
1.4 GeV 26 GeVChallenge:Time of Flight CompensationFully digital implementation
June 10, 2013
Kicker Location News – Tunnel Space in LSS3
W. Hofle @LIU Meetings 12 June 2013
Short (array of) striplines, slotted wave guides, cavities ?Location: dispersion supressor, flat vacuum chamberFrequency reach < 1.5 GHzCabling / Infra-structure being prepared in LS1 (2013/2014)
June 10, 2013 8
Low attenuation, low dispersion “smooth-wall” coax-cables 7/8”installed in May 2013
W. Hofle @LIU Meetings 12 June 2013 9
Time-Line: SPS Implementation of vertical High Bandwidth Feedback
Year 4Year 3Year 2Year 1 Year 5
Phase 1:
20172014201320122011 2015 2016 2018Year 6 Year 7
demonstrator
power amplifiers for phase 2
tendering (s)
phase 2 beam testsPhase 2:
review forphase 2:
Phase 3: Final implementation
go / no-gophase 3:
June 10, 2013
2019
new pick-up design and construction
kickers design and construction
June 10, 2013 W. Hofle @LIU Meetings 12 June 2013 10
Summary
SPS can profit from High Bandwidth Transverse Feedback in a number of ways: 25 ns and 50 ns upgrade variants (TMCI, ECI), and during scrubbing (scrubbing beam !)
Interest and potential applications in PS and LHC SPS is also a test-bed
CERN committed to upgrade transverse feedbacks and high bandwidth transverse feedback in injectors within LIU Project frame
2012 / 2013 Beam Tests with SLAC developed demonstrator hardware successful: Feedback loop closed with 3.2 GS/s digitization using a single bunch confidence in digital technology
Full exploration of demonstrator with beam requires new hardware be put in place to overcome bandwidth limitations of present kicker down selection of kicker options ongoing, infrastructure put in place for installation of new kickers as early as at end of LS1, power amplifiers
New pick-up design launched at CERN
Full bandwidth tests in SPS between LS1 and LS2 mandatory to propose such a system for LHC as well as the final implementation for the SPS
June 10, 2013 W. Hofle @LIU Meetings 12 June 2013 11
Comments and recommendations from Reviewers
Management structure, put something written in place
Schedule for LS1 critical for kicker installation
Explore synergy with BNL
Kicker impedance and beam induced power study where it goes
Would developed kicker be compatible with PS, LHC ?
Integration with CERN LLRF (synchronisation) and CERN software needs more attention
Manpower adequate or excessive ?
Recommend to switch from evaluation boards in electronics to hardware produced by project team
June 10, 2013 W. Hofle @LIU Meetings 12 June 2013 12
Discussion on 11T Dipole emerged, clarification will be asked from CERN
Time Line shows that decisions points ahead (HL to become fully funded project only in the future under new CERN directions, needs 6.5-7 TeV running results to make decision
In absence of full CERN commitment to HL, need for some interim agreement
Budget in US only clear for 2014, 2015, but 2015 is very difficult
Additional support on top of flat-flat funding can only come from within labs by re-directing resources (man power) to LARP activities, DOE instructed labs to do so
Will accumulate schedule shift if funds are not available in US as asked
Observations by W.H.
June 10, 2013 W. Hofle @LIU Meetings 12 June 2013 13
Overview, charge of review (Wolfgang + Brennan)
Beam Parameters overview (Giovanni ? Incl. LHC ?)
Simulations (Kevin)
Optics and Aperture constraints for pick-up and Kicker (Hannes)
PU design and receiver (Gerd Kotzian)
Kicker Design (John Cesaratto)
Kicker and Pickup Fabrication (Eric)
Synchronisations and time of flight compensation (Daniel Valuch)
Technology choices for ADCs/DACs/FPGAs (Tom Levens)
CERN Controls (Andy ?)
SLAC / LARP contributions
INFN – LFN contributions
Close-out, recommendations
CERN Review for Feedback Project: Status of Planning
top related