Transcript
YEO TEEN INNA Multi-Discipline PPROCUREMENT Manager with PRODUCTION and QUALITY
Background which provide the ABILITY to MANAGE and IMPROVE the Supplier within SHORT Time to PUSH AHEAD the COST Improvement Activities
WORK EXPERIENCE
SourcingPurchasing
Part Quality Assurance
ProductionOperation
Sub-Con Management
EquipmentMaintenance
1991 1993
MAGNETIC Head ASSEMBLY
Production(SINGAPORE)
8mm CAMCORDER
MAGNETIC Head ASSEMBLY
Production(SINGAPORE)
MAGNETIC Head ASSEMBLY
Production(THAILAND)
1996
MAGNETIC Head ASSEMBLY
Production(SINGAPORE)
MAGNETIC Head ASSEMBLY
Production(THAILAND)
OPERATION EXPENSE
Control and COST DOWN
1999
MAGNETIC Head ASSEMBLY
(BATAM) OPERATION CONTROL
2001
VHS CAMCORDER
2003
MAGNETIC Head ASSEMBLY
(BATAM) OPERATION CONTROL
DVC CAMCORDER
MAGNETIC Head ASSEMBLY
(BATAM) OPERATION CONTROL
MAGNETIC Tip PROCESSING
Production(SINGAPORE)
2005
Blu-Ray PLAYER
MAGNETIC Tip PROCESSING
Production(SINGAPORE)
Blu-Ray PRISM PROCESSING
Production(SINGAPORE)
2008
ASST Engineer
Senior ASST Engineer
Engineer Senior Engineer ASST ManagerProductionManager
8mm PLAYER
SourcingPurchasing
Part Quality Assurance
ProductionOperation
Sub-Con Management
EquipmentMaintenance
PLP ASEAN Supplier SOURCINGMATERIAL VA and Process CD
(PROCUREMENT)
NEW Model PartFA Certification
(PROCUREMENT)
YEO TEEN INNA Multi-Discipline PPROCUREMENT Manager with PRODUCTION and QUALITY
Background which provide the ABILITY to MANAGE and IMPROVE the Supplier within SHORT Time to PUSH AHEAD the COST Improvement Activities
WORK EXPERIENCE
2003 2005 2008 2011 2012 2013 2015
MAGNETIC Head ASSEMBLY
(BATAM) OPERATION CONTROL
MAGNETIC Tip PROCESSING
Production(SINGAPORE)
MAGNETIC Tip PROCESSING
Production(SINGAPORE)
Blu-Ray PRISM PROCESSING
Production(SINGAPORE)
DVC CAMCORDER
Blu-Ray PLAYER
CISCO SERVER
Power Supply Unit
NEW Model Part SOURCING
(PROCUREMENT)
ProductEOL
Supplier QUALITY IMPROVEMENT
(PROCUREMENT)
PART QUALITY CONTROL REVAMP IQC
(PROCUREMENT)
SONY BRAVIA TV
Power Supply Board
2009
PART Purchasing SETUP NAIJI System
(PROCUREMENT)
PART PurchasingSETUP ORACLE MRP
(PROCUREMENT)
2010
BusinessTERMINATE
ACHIEVEMENT ▲MAGNETIC HEAD REVIVAL ���� UP MARKET SHARE
8mm VIDEO HEAD
Production TRANSFER
from JAPAN to Sub-
Contractor in
Indonesia-BATAM
Market SHARE UP � SALES “ONE Coin” PROJECT � SELL-Price
DVC VIDEO HEAD
Production TRANSFER
from JAPAN to Sub-
Contractor in
Indonesia-BATAM
ACHIEVEMENT ▲TURN-AROUND TIP OPERATION ���� BREAKEVEN P/L
Use CE Diagram to determine IMPACT Material Cost REDUCTION – YIELD-UP REDUCE Labour Cost – LINE Balancing✚
ACHIEVEMENT ▲BLU-RAY PRISM SMOOTH SETUP ���� EXPAND CAPACITY [ UTILIZE Tip-Processing Experience to SPEED-UP Performance ]
➀Capacity UP 30% within 3 Months ➁Cost Down Target to improve P/L Production INNOVATION Activities✚
ACHIEVEMENT ▲RE-VITALIZE PROCUREMENT – VALUE ADDED
SOURCE ASEAN Supplier[Show ASEAN Price BETTER CHINA]
VA/CD Activities by Supplier COLLOBRATION
FIRST Article Certification FUNCTION Transfer
“NAIJI” for DEMAND UP with MIN INVENTORY
ⒶⒶⒶⒶ PURCHASING ⒷⒷⒷⒷ SOURCING ⒸⒸⒸⒸ PART QA
ACHIEVEMENT ▲SMOOTH TERMINATION of BUSINESS ���� CONTINUITY
➀Hand-Over SOURCING Function to HQ
➁SETUP NEW Purchasing ROUTE for SONY IPO
➂SETUP MRP Software for BATAM Production
Making MASTER Plan with ALL Related Party
SKILL
Production Procurement“COST DOWN”
ProjectEngineering
/ Quality
Implement
/ ENFORCE
5S
ShopFloor
Management
Implement /
ENFORCE TPM
Environment
Committee
Safety
Committee
Implement /
ENFORCE ISO
Usage of SPC
Tool
LEAN
Production
4M Change
Management
Improvement
PDCA Cycle
6-SIGMA
Implement
Use 5-Why
Approach
Determine
OQC Sampling
SETUP /
RUN MRP
Supplier
AUDIT
INTERPRETE
Drawing
SUMMARIZE
Data CRUNCH
top related