Top Banner
YEO TEEN INN A Multi-Discipline PPROCUREMENT Manager with PRODUCTION and QUALITY Background which provide the ABILITY to MANAGE and IMPROVE the Supplier within SHORT Time to PUSH AHEAD the COST Improvement Activities WORK EXPERIENCE Sourcing Purchasing Part Quality Assurance Production Operation Sub-Con Management Equipment Maintenance 1991 1993 MAGNETIC Head ASSEMBLY Production (SINGAPORE) 8mm CAMCORDER MAGNETIC Head ASSEMBLY Production (SINGAPORE) MAGNETIC Head ASSEMBLY Production (THAILAND) 1996 MAGNETIC Head ASSEMBLY Production (SINGAPORE) MAGNETIC Head ASSEMBLY Production (THAILAND) OPERATION EXPENSE Control and COST DOWN 1999 MAGNETIC Head ASSEMBLY (BATAM) OPERATION CONTROL 2001 VHS CAMCORDER 2003 MAGNETIC Head ASSEMBLY (BATAM) OPERATION CONTROL DVC CAMCORDER MAGNETIC Head ASSEMBLY (BATAM) OPERATION CONTROL MAGNETIC Tip PROCESSING Production (SINGAPORE) 2005 Blu-Ray PLAYER MAGNETIC Tip PROCESSING Production (SINGAPORE) Blu-Ray PRISM PROCESSING Production (SINGAPORE) 2008 ASST Engineer Senior ASST Engineer Engineer Senior Engineer ASST Manager Production Manager 8mm PLAYER
8
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RESUME

YEO TEEN INNA Multi-Discipline PPROCUREMENT Manager with PRODUCTION and QUALITY

Background which provide the ABILITY to MANAGE and IMPROVE the Supplier within SHORT Time to PUSH AHEAD the COST Improvement Activities

WORK EXPERIENCE

SourcingPurchasing

Part Quality Assurance

ProductionOperation

Sub-Con Management

EquipmentMaintenance

1991 1993

MAGNETIC Head ASSEMBLY

Production(SINGAPORE)

8mm CAMCORDER

MAGNETIC Head ASSEMBLY

Production(SINGAPORE)

MAGNETIC Head ASSEMBLY

Production(THAILAND)

1996

MAGNETIC Head ASSEMBLY

Production(SINGAPORE)

MAGNETIC Head ASSEMBLY

Production(THAILAND)

OPERATION EXPENSE

Control and COST DOWN

1999

MAGNETIC Head ASSEMBLY

(BATAM) OPERATION CONTROL

2001

VHS CAMCORDER

2003

MAGNETIC Head ASSEMBLY

(BATAM) OPERATION CONTROL

DVC CAMCORDER

MAGNETIC Head ASSEMBLY

(BATAM) OPERATION CONTROL

MAGNETIC Tip PROCESSING

Production(SINGAPORE)

2005

Blu-Ray PLAYER

MAGNETIC Tip PROCESSING

Production(SINGAPORE)

Blu-Ray PRISM PROCESSING

Production(SINGAPORE)

2008

ASST Engineer

Senior ASST Engineer

Engineer Senior Engineer ASST ManagerProductionManager

8mm PLAYER

Page 2: RESUME

SourcingPurchasing

Part Quality Assurance

ProductionOperation

Sub-Con Management

EquipmentMaintenance

PLP ASEAN Supplier SOURCINGMATERIAL VA and Process CD

(PROCUREMENT)

NEW Model PartFA Certification

(PROCUREMENT)

YEO TEEN INNA Multi-Discipline PPROCUREMENT Manager with PRODUCTION and QUALITY

Background which provide the ABILITY to MANAGE and IMPROVE the Supplier within SHORT Time to PUSH AHEAD the COST Improvement Activities

WORK EXPERIENCE

2003 2005 2008 2011 2012 2013 2015

MAGNETIC Head ASSEMBLY

(BATAM) OPERATION CONTROL

MAGNETIC Tip PROCESSING

Production(SINGAPORE)

MAGNETIC Tip PROCESSING

Production(SINGAPORE)

Blu-Ray PRISM PROCESSING

Production(SINGAPORE)

DVC CAMCORDER

Blu-Ray PLAYER

CISCO SERVER

Power Supply Unit

NEW Model Part SOURCING

(PROCUREMENT)

ProductEOL

Supplier QUALITY IMPROVEMENT

(PROCUREMENT)

PART QUALITY CONTROL REVAMP IQC

(PROCUREMENT)

SONY BRAVIA TV

Power Supply Board

2009

PART Purchasing SETUP NAIJI System

(PROCUREMENT)

PART PurchasingSETUP ORACLE MRP

(PROCUREMENT)

2010

BusinessTERMINATE

Page 3: RESUME

ACHIEVEMENT ▲MAGNETIC HEAD REVIVAL ���� UP MARKET SHARE

8mm VIDEO HEAD

Production TRANSFER

from JAPAN to Sub-

Contractor in

Indonesia-BATAM

Market SHARE UP � SALES “ONE Coin” PROJECT � SELL-Price

DVC VIDEO HEAD

Production TRANSFER

from JAPAN to Sub-

Contractor in

Indonesia-BATAM

Page 4: RESUME

ACHIEVEMENT ▲TURN-AROUND TIP OPERATION ���� BREAKEVEN P/L

Use CE Diagram to determine IMPACT Material Cost REDUCTION – YIELD-UP REDUCE Labour Cost – LINE Balancing✚

Page 5: RESUME

ACHIEVEMENT ▲BLU-RAY PRISM SMOOTH SETUP ���� EXPAND CAPACITY [ UTILIZE Tip-Processing Experience to SPEED-UP Performance ]

➀Capacity UP 30% within 3 Months ➁Cost Down Target to improve P/L Production INNOVATION Activities✚

Page 6: RESUME

ACHIEVEMENT ▲RE-VITALIZE PROCUREMENT – VALUE ADDED

SOURCE ASEAN Supplier[Show ASEAN Price BETTER CHINA]

VA/CD Activities by Supplier COLLOBRATION

FIRST Article Certification FUNCTION Transfer

“NAIJI” for DEMAND UP with MIN INVENTORY

ⒶⒶⒶⒶ PURCHASING ⒷⒷⒷⒷ SOURCING ⒸⒸⒸⒸ PART QA

Page 7: RESUME

ACHIEVEMENT ▲SMOOTH TERMINATION of BUSINESS ���� CONTINUITY

➀Hand-Over SOURCING Function to HQ

➁SETUP NEW Purchasing ROUTE for SONY IPO

➂SETUP MRP Software for BATAM Production

Making MASTER Plan with ALL Related Party

Page 8: RESUME

SKILL

Production Procurement“COST DOWN”

ProjectEngineering

/ Quality

Implement

/ ENFORCE

5S

ShopFloor

Management

Implement /

ENFORCE TPM

Environment

Committee

Safety

Committee

Implement /

ENFORCE ISO

Usage of SPC

Tool

LEAN

Production

4M Change

Management

Improvement

PDCA Cycle

6-SIGMA

Implement

Use 5-Why

Approach

Determine

OQC Sampling

SETUP /

RUN MRP

Supplier

AUDIT

INTERPRETE

Drawing

SUMMARIZE

Data CRUNCH