Quick Installation Guide630 series
3Quick Installation Guide | 630 series
Protective earthing
4 630 series | Quick Installation Guide
Flush mounting 4U
5Quick Installation Guide | 630 series
Semi-flush mounting 4U
6 630 series | Quick Installation Guide
Wall mounting 4U
7Quick Installation Guide | 630 series
Rack mounting a single IED 4U
8 630 series | Quick Installation Guide
Rack mounting two IEDs 4U
9Quick Installation Guide | 630 series
Rack mounting kit for single IED and test switch RTXP
10 630 series | Quick Installation Guide
Ceiling mounting with external display module
33128
Ø 20
M3
38
7,5
LHMI outline
Surface coating onrear side of panelmust be removedØ 15 mm
Hole for GNDconnection
Hole for cable fromIED to LHMI
78
M3
Ø 6,5
M3M3
177 162
18,5
220
Panel drill plan 1:1External LHMI display
630 series | Quick Installation Guide
Wall mounting with external display module
15
Quick Installation Guide | 630 series
Mounting the external display module
16
630 series | Quick Installation Guide17
Quick Installation Guide | 630 series
Mounting the optional cable shield rail
18
630 series | Quick Installation Guide
Rack mounting two IEDs with the optional cable shield rail
19
Quick Installation Guide | 630 series
Notes
20
630 series | Quick Installation Guide
Notes
21
Quick Installation Guide | 630 series
Notes
22
Contact us
1MR
S75
7518
ABB Oy Distribution Automation P.O. Box 699 FI-65101 VAASA, Finland Phone +358 10 22 11 Fax +358 10 22 41094
www.abb.com/substationautomation
© C
opyr
ight
201
1 A
BB
. A
ll rig
hts
rese
rved
.