Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 1 of 14
Reference/Inspection No.:
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Application of the Manufacturer
Applicant Name:
Address:
Plant / Department / Production Place:
- Telephone No.:
- Fax No.:
- Internet:
- E-mail:
initial / renewed / supplementary manufacturer qualification according to
AD 2000-Merkblatt HP 0 / HP 100 R / TRD 201 / EN ISO 3834-2 / EN ISO 3834-3
Statements in the forms of this questionnaire are certified to be correct.
Date:
Stamp, Signature of Corporate Management:
Note: This questionnaire is valid for the qualification of pressure equipment manufacturers in accordance with Pressure Equipment Directive (PED) in connection with AD 2000-Rules. In case that other technical regulations or standards (e.g. EN 13445) instead of AD 2000 are used, you should refer to their respective paragraphs.
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 2 of 14
Reference/Inspection No.:
1 General firm’s data Description Evaluation / Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
1.1 Responsible contact person for TÜV
1.2 Responsible person of Qualiy Assurance (QA)
Staff of QA
-
-
1.3 General manager
Production manager
1.4 Organization
- please add an actual organization chart
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 3 of 14
Reference/Inspection No.:
1 General firm’s data Description Evaluation / Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
1.5 Are there still certifications or recognitions as manufacturerer ?
Directive 97/23/EC: Module___
EN ISO 900__
EN ISO 3834–__
AD 2000-Merkblatt HP 0
DIN 6700/ EN 15085
others
- please enclose current certificates
1.6 Number of employees - Administration
- Production
1.7 Working area (approx.) roofed / roofless - for Manufacturing
- for Storage
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 4 of 14
Reference/Inspection No.:
1 General firm’s data Description Evaluation / Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
1.8 Total production scope (including non-PED items) - - - - -
1.9 Production scope which shall be examined - - - -
1.10 Manufactured products in the scope of Pressure Equipment Directive 97/237EC (PED),
Manufacturing acc. to module
Product Category Module
1.11 Parent metals (Groups according to CR ISO 15608)
1.13 Welding processes used (EN 24063)
1.14 Max. dimensions of the products
Wall thickness (welded): Diameter: Length: Weight:
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 5 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Contract review
Are procedures for contract review realized?
What items / requirements are considered at contract review?
5.2
E.g. to be clearly defined:
• application standard / technical regulation
• suplimentary specified requirements (structure, corrosion resistance, specification for the welding process, non-destructive testing, heat treatment, type of recognized welding process and personnel, involving of an independent inspection body)
• measures against climate influences
How are the proce-dures for contract re-view documented?
Are all necessary tech. regulations/standards available and known? Are procedures for handling changes and updates defined?
Design review
Are procedures for design review realized?
What aspects are considered at design review?
5.3
e.g: specifications for parent metals and welding consumables, welding sequence, accessibility of welds, quality and acceptance criteria for welds (HP 5/1, EN ISO 5817)
How are the procedures for design review documented?
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 6 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Sub-contracting
What measures are taken to ensure, that the sub-contractors comply with the quality requirements of this standard?
6
The sub-contractor has - to be informed by the manufacturer about all requirements - to be supplied with all relevant specifications / standards/ codes - to be audited and controlled by the manufacturer - to document all activities and procedures
Welders and welding operators
How is it ensured, that only approved welders are assigned for welding production?
7.2 EN.ISO 9606 (EN 287-1) EN ISO 14732 (EN 1418)
EN ISO 15618
AD 2000-HP 3 TRD 201, Anl. 1 VdTÜV-Mbl. 1164
Please add a list of qualified welders and welding operators. Usable form see enclosure 1.
e.g. approval certificates available on site, list of welders
Welding coordination personnel
for planning and supervising the welding production
7.3 EN ISO 14731
AD 2000-HP3
Please add a list of the nominated welding coordination personnel. Usable form see enclosure 2.
Please add qualification certificates.
The qualification (education in welding technology) of the welding coordination personnel has to be suitable for the intended production scope.
Non-destructive testing personnel
8.2 EN ISO 9712 (EN 473)
AD 2000-HP 4
Please add a list of the nominated supervisory and testing personnel for non-destructive testing (NDT) Usable form see enclosure 3.
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 7 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Personnel for quality control and other inspections
Which personnel are responsible for the other inspections (e.g. destructive and visual inspections, monitoring and controlling of heat treatment)?
8.1
Description of manufacturing and testing facilities
9.1 9.2
Please add a list of the major production and testing facilities including items of capacity and capability. Usabel form see enclosure 4.
Suitability of equipment
What is taken to ensure, that the equipment is adequate for the application concerned?
9.3
New equipment
What measures are taken after installation of new or refurbished equipment?
(only applicable to EN ISO 3834-2)
9.4
Maintenance
Are there documented plans for maintenance of equipment for production and testing?
(only applicable to EN ISO 3834-2)
9.5
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 8 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Calibration and validation of measuring, surveillance and testing equipment
Which methods are performed for cali-bration of equipment?
(kind of equipment, calibration authority, calibration intervals, marking, documentation)
16 EN ISO 17662
DVS-Mbl. 0714 und 3009
Production plan
Which criteria are defined for production planning?
10.1
Welding procedure specification (WPS)
Are there WPS for the welding production?
(applicable only for EN ISO 3834-2; or EN ISO 3834-3 in conjunction with AD 2000-HP2/1 /TRD)
10.2 EN ISO 15609
AD 2000-HP 2/1
TRD201, An. 1
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 9 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Welding procedure approval
Acc. to which part of EN ISO 15610 to 15614 are the welding procedures approved?
- for the manufacture acc. to AD 2000-HP0 / TRD 201:
- for the manufacture acc. to other rules:
Are other manufacturing procedures also approved (e.g. forming)?
If applicable, acc. to which rules/standards?
10.3 EN ISO 15607
EN ISO 15610
EN ISO 15611
EN ISO 15612
EN ISO 15613
EN ISO 15614
AD 2000-HP 2/1
TRD 201, An. 1
Please add a list of the approved procedures. Usable form see enclosure 5.
Work instructions
Are there also additional work instructions beside WPS?
How is it ensured, that these instructions include all necessary welding parameters and are in accordance with the WPS?
10.4
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 10 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Documentation of the welding procedures
Which procedures do exist for quality relevant documents?
Who is responsible for establishment and maintenance of documents (e.g. WPS, welding procedure, approval records, welders approval certificates)?
10.5
Storage and handling of filler metals
Which documented instructions exist for storage, if applicable for rebaking and handling of filler metals to avoid damage?
Are the supplier’s recommendations for processing available?
Is batch testing of filler metals performed? (only applicable for EN ISO 3834-2 and, if stated, in the contract/ specification)
11
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 11 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Storage of parent metals
What measures are taken to prevent adversely effects (e.g. damage, oxidation, soiling, loss of marking)?
12
Post-weld heat treatment
Which specifications for performance of any post weld heat treatment exist? Which influential variables are considered?
13 ISO/TR 17663 (DIN V 8540)
The compatibility with parent metals, welded joints and construction as well as the accordance with the application standard / code have to be considered.
How frequently / by whom is the heat treatment process checked?
How is the process of heat treatment documented?
Re-traceability of the heat treatment process is necessary.
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 12 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Welding related inspection and testing, General
14.1 Necessary range and frequency depend on the contract, application standard, the welding process, the type of construction. - an involvement of an independent inspection body may be necessary - planning of location and timing of the inspection
Welding related inspection and testing, before welding
What kind of inspections are performed?
14.2 EN 287, EN ISO 9606, EN 1418
EN ISO 15609
e.g.: suitability and validity of:
- welders and welding operators approval test certificates - welding procedure approvals, if required - welding procedure qualifications (WPS)
joint preparation
suitability of working conditions including evironment (air draught, temperature, special measures for manufacturing of ferritic/austenitic steels etc.)
Welding related inspection and testing, during welding
What kind of inspections are performed?
14.3
e.g.: control and, if necessary, documentation of
- welding parameters and preheating / interpass temperature
- cleaning, shape or runs and lyers, back gouging
- correct use and handling of filler metals
- any intermediate inspection (check of distortion, dimensions)
Welding related inspection and testing, after welding
What kind of inspections are performed?
14.4
e.g.: - visual inspection
- destructive and non-destructive tests,
- inspection of surface treatment (grinding, pickling etc.)
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 13 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Inspection and test status
How is the manufac-turing and inspection status of the product indicated?
14.5
e.g.: by use of routing card, production and inspection sequence plan with production related items
Non-conformities and corrective action
Which measures for control of non-con-forming products are defined? (e.g. procedures for separate storage, repair and/or rectification including reinspection)
What measures are assigned in order to identify and eliminate causes of non-conformities
(EN ISO 3834-2)
15
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Page 14 of 14
Reference/Inspection No.:
2 Quality requirements acc. to EN ISO 3834-2/-3
Element Par. of Stand-ards
see also Description Evaluation/ Remarks
- please cross out not applicable parts
- please add supplementary description on a separate page, if the place in the question list is not sufficient
Identification and traceability throughout the manu-facturing process
Which procedures are defined for identifi-cation and traceability of semifinished products, welding consumables, weld seams (incl. repairs) and products?
17
HP 0, Para. 4
Responsible personnel for markshift of materials
Please add a list of personnel, which shall be authorized for markshift. Usable form see enclosure 6. (only applicable for qualification acc. to AD 2000-HP 0 / TRD 201)
Which documentation for traceability of the welding operations is defined?
Quality records
Which records, certificates, approvals are defined?
Who is responsible for the establishment of quality records?
Which procedures are defined for cases of non-conformities?
What is the minimum period of retaining the quality records?
18
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 1 Page 1 of 1
Reference/Inspection No.
1 Welder
Only for PED: Is the personell approved in accordance to EN 287,EN ISO 9606 and EN 1418 in addition approved in accordance to PED by either a notified body or a recognized third party organization?.(Only for pressure equipment in categories II,III and IV. (Ifapplicable, please enclose certificates)
1.1 Manual welders (incl. welders for semimechanized welding processes, e.g. 131, 135, 136) Total number:
Examination group acc. EN 287-1 (steel) Number of qualified / approved welders
Examination group acc. EN ISO 9606-2 (Aluminium)
Number of qualified / approved welders
acc. to other standards:
Number of qualified / approved welders
1.2
Personnel for mechanized welding (with travelling carriage (e.g. 121), Orbit, Robot) qualified in accordance with AD 2000-HP 2/1 - HP 5/2 - TRD 201 - EN 1418
Welding process Parent metal Number of operators
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 2 Page 1 of 1
Reference/Inspection No.:
1
Are welding and testing supervision performed by the same person? yes / no (please indicate)
2 Welding supervisor
Name:
Education in welding technology as (title):
at:
finished on (date):
Experience in welding:
employed at: as: from: till:
Position:
Range of responsability:
Substitute for the welding supervisor
Name:
Education in welding technology (title):
at:
finished on (date):
Experience in welding:
employed at: as: from: till:
Position:
Range of responsability:
please enclose certificates about welding technology education
(Remark: The education should have been in accordance with applicalbe IIW or EWF guidelines.)
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 3 Page 1 of 2
Reference/Inspection No.:
3 Supervisor for NonDestructive Testing (NDT)
Name: Stamp and
Signature:
Education in NDT as (title/level): Certificate EN 473 issued by:
at:
finished on (date): Level:
Experience NDT:
employed at: as: from: till:
Position:
Range of responsibility:
Substitute of the supervisor for NDT
Name: Stamp and
Signature:
Education in NDT as (title): Certificate EN 473 issued by:
at:
finsihed on (date): Level:
Experience in NDT:
employed at: as: from: till:
Position:
Range of responsability:
please enclose EN 473 certificates Only for PED: Is the personell for NDT (without VT) approved in accordance to EN 473 and in addition approved by a recognized third party organization? (Only for pressure equipment in categories III and IV,if applicalbe please enclose certificates)
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 3 Page 2 of 2
Reference/Inspection No.:
4 List of personnel for NDT
Testing process Name Level acc. EN 473
Visual test (VT)
Dye penetrant test (PT)
Magnetic particle test (MT)
Radiographic test (RT)
Ultrasonic test (UT)
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 4 Page 1 of 7
Reference/Inspection No.:
1 Processing machines
1.1 Bending mills
Quantity Bending length Kind of related heating equipment
Wall thickness range for rolling (depending on diameter)
cold: mm; hot: mm
1.2 Bending presses
Quantity Force max. Kind of related heating equipment
Wall thickness range for pressing
cold: mm; hot: mm
1.3 Other equipment for forming
Kind Quantity Remarks
1.4 Equipment for surface treatment and finishing
Kind of treatment Quantity (e.g. pickling, sand blasting, grinding, polishing)
1.5 Plate shears Quantity:
Thickness range for cutting for ferritic steel: mm; austenitic steel: mm
1.6 Equipment for thermal cutting Kind and quantity:
for ferritic steel: for austenitic steel:
1.7 Devices for handling
Rollers Quantity max. load capacity Kind of drive
Positioners Quantity max. load capacity Kind of drive
Other equipment:
Kind Quantity max. load capacity Kind of drive
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 4 Page 2 of 7
Reference/Inspection No.:
2 Welding equipment
Kind Quantity max. Current Generators
DC converters
Transformers
TIG welding machines
TIG pulse welding machines
Quantity max. Current MAG/MIG welding machines
MAG/MIG pulse welding machines
SAW welding machines
Oxy-fuel welding equipment
Further equipment (e.g. for plasma arc welding*)
Manipulators for welding machines*)
*) please describe on separate page
3 3.1
Drying equipment for welding consumables Drying / hot storing equipment for covered electrodes
Kind max. Temperature (oC) Quantity
3.2
Drying / hot storing equipment for flux-cored wires
Kind max. Temperature (oC) Quantity
3.3
Drying / hot storing equipment for flux
Kind max. Temperature (oC) Quantity
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 4 Page 3 of 7
Reference/Inspection No.:
4
Heat treatment equipment (stationary and/or transportable)
examined acc. to AD 2000-Merkblatt HP 7 or equivalent code:
Kind and quantity of equipment *) Examination No. Date
*) please add a description of the equipment concerning: size / capacity / kind of heating / furnace atmosphere / temperature range / kind of heat treatment / quantity of thermocouples for furnace temperature and component temperature / subcontractor for heat treatment (name and address)
5 Transportation devices for the assembly and transport of individual parts and components as well as for hot forming and heat treatment
Kind and quantity of transport. devices Load capacity
6 Particular other manufacturing devices
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 4 Page 4 of 7
Reference/Inspection No.:
Material testing equipment (e.g. tensile, bending, impact, hardness, pellini testing machines)
Quantity and type Measuring range Class acc. to EN ISO 7500-1, EN 10002-4
By whom and how often are the machines checked/ calibrated (external, incompany) (ref. DIN 51220)
Special equipment (e.g. straingage, elevated temp. and low temp. tensile test facilities)
Re-marks
Measurement equipment (for simple devices only total number may be listed)
Quantity and type Applicable range (in general)
By whom and how often is this equipment checked/calibrated
Remarks
Devices for pressure test, leak test and burst test
Type and quantity Applicable range Test-medium
max. test pressure
By whom and how often is this equipment checked/calibrated (e.g. manometer) *)
Remarks
Additional remarks:
*) manometers for the testing of pressure equipment shall be calibrated
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 4 Page 5 of 7
Reference/Inspection No.:
Equipment for metallographic examination (summary)
Type and Quantity (e.g. microscope) Remarks
Equipment for chemical analysis
Type and Quantity
Manufacturer, year of
construction
Elements to be determined
Are the relevant requirements for the analysis accuracy ful-filled? *)
Remarks
*) e.g. in acc. to German manual „Handbuch für das Eisenhüttenlaboratorium“
Information about further testing equipment and testing procedures (e.g. devices for identification check, corrosion tests)
Remarks
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 4 Page 6 of 7
Reference/Inspection No.:
Ultrasonic test equipment (UT)
Manufacturer and type Quantity Remarks (e.g. for calibration)
Kind of test probes / calibration blocks (summary)
Manufacturer and type Remarks
Radiographic test equipment (RT) (z.B. X-ray tubes, isotope inspection equipment, linear accelerator)
Kind Quantity Energy limit (EG)
or max. activity
Manufacturer and type Remarks
Equipment for film examination (e.g. densitimeter)
Kind Quantity Manufacturer and type Remarks
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 4 Page 7 of 7
Reference/Inspection No.:
Apparatures and devices for surface crack examination
Magnetic particle test equipment (MT)
Manufacturer and type max. capacity Remarks (e.g. for calibration)
- Yoke magnetization
- Magnetic current
- Other methods
Devices and test probes for the control of tangential magnetic field intensity and indicator liquid (e.g. Berhold-test probe)
Remarks
Dye penetrant test (PT)
Type (e.g. wet) Manufacturer and type Remarks
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 5 Page 1 of 1
Reference/Inspection No.:
Welding procedure approval tests performed No.
Parent metals / form
(material type / tube, plate etc.)
Filler metals, auxillary materials
Welding process
Welding position
Dimensional range (thickness, Ø)
mm
Heat treatment
Operating temperature max./min. *)
°C
Code Re- marks
Additonal remarks:
*) of welded items
Questionnaire for manufacturer qualification according to - Pressure Equipment Directive 97/23/EC Annex I, Paragraph 4.3
in connection with AD 2000-Merkblatt HP 0 / TRD 201
- EN ISO 3834-2 - EN ISO 3834-3
Enclosure 6 Page 1 of 1
Refernce/Inspection No.:
Responsible personnel for markshift
Name: Stamp and
Signature:
Education as:
at:
finsihed on (date):
Function:
Responsible personnel for markshift
Name: Stamp and
Signature:
Education as:
at:
finsihed on (date):
Function:
Responsible personnel for markshift
Name: Stamp and
Signature:
Education as:
at:
finsihed on (date):
Function:
The consent for the transfer of marking was given by TÜV ………………… on (date) ……………..