Combee Road (State Road 659) PD&E StudyFrom US 98 to North Crystal Lake DriveFinancial Project ID No.: 440274-1-22-01

CONTACT INFORMATION

HOW TO PARTICIPATE

PROJECT OVERVIEW

Study website: www.swflroads.com/sr659/us98toncrystallakedr

Alternatives Public Workshop - March 7, 2019

PROJECT LOCATION MAP

N.T.S.

POTENTIAL IMPROVEMENTS

6’ wide sidewalks

Two-way center turn lane

7’ wide buffered bicycle lanes

COMBEE ROAD

PROJECT SCHEDULE

We welcome your comments on how to improveCombee Road. Share your thoughts and ideas andhelp identify areas of the roadway that need ourattention. Please complete the comment form andleave it with us this evening, or you can take it home,complete it, and mail it to us by March 18, 2019. Youcan send your comments to the contact provided below.

The Florida Department of Transportation (FDOT) isconducting a Project Development and Environment(PD&E) study to determine how to improve Combee Roadfrom US 98 to North Crystal Lake Drive. Therecommendations from this study will be used to guidefuture design and construction activities. Potentialimprovements to Combee Road include a two-way centerturn lane, designated bicycle lanes, and sidewalks on bothsides. Other improvements are proposed at theintersections to help the flow of traffic and reduce crashes.Throughout the study, a no-build or “do-nothing” alternativeis also considered and will remain an option until the end ofthe process.

Patrick Bateman, EIFDOT District One Project Manager

P.O. Box 1249, Bartow, FL 33831

Ph: (863) 519-2792

Email: Patrick.Bateman@dot.state.fl.us

August 2018 Kickoff Meeting

March 7, 2019

Late Summer 2019

Early 2020

Alternatives Workshop

Public Hearing

Study Complete

Public participation is solicited without regard to race, color, nationalorigin, age, sex, religion, disability or family status. Persons wishing toexpress their concerns relative to FDOT compliance with Title VI may doso by contacting Cynthia Sykes, Title VI Coordinator, at (863) 519-2287or by email at Cynthia.Sykes@dot.state.fl.us.

Combee Road (State Road 659) PD&E Study from US 98 to North Crystal Lake Drive

The environmental review, consultation, and other actions required byapplicable federal environmental laws for this project are being, or havebeen, carried-out by FDOT pursuant to 23 U.S.C. § 327 and aMemorandum of Understanding dated December 14, 2016, and executedby FHWA and FDOT.

ALTERNATIVES EVALUATION MATRIX

PD&E Ongoing

Design Funded

Right-of-Way (Land) Acquisition Not Funded

Construction Not Funded

PROJECT FUNDING

FDOT Adopted 5-Year Work Program (July 1, 2018 to June 30, 2023)