Combee Road (State Road 659) PD&E Study From US 98 to North Crystal Lake Drive Financial Project ID No.: 440274-1-22-01 CONTACT INFORMATION HOW TO PARTICIPATE PROJECT OVERVIEW Study website: www.swflroads.com/sr659/us98toncrystallakedr Alternatives Public Workshop - March 7, 2019 PROJECT LOCATION MAP N.T.S. POTENTIAL IMPROVEMENTS 6’ wide sidewalks Two-way center turn lane 7’ wide buffered bicycle lanes COMBEE ROAD PROJECT SCHEDULE We welcome your comments on how to improve Combee Road. Share your thoughts and ideas and help identify areas of the roadway that need our attention. Please complete the comment form and leave it with us this evening, or you can take it home, complete it, and mail it to us by March 18, 2019. You can send your comments to the contact provided below. The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) study to determine how to improve Combee Road from US 98 to North Crystal Lake Drive. The recommendations from this study will be used to guide future design and construction activities. Potential improvements to Combee Road include a two-way center turn lane, designated bicycle lanes, and sidewalks on both sides. Other improvements are proposed at the intersections to help the flow of traffic and reduce crashes. Throughout the study, a no-build or “do-nothing” alternative is also considered and will remain an option until the end of the process. Patrick Bateman, EI FDOT District One Project Manager P.O. Box 1249, Bartow, FL 33831 Ph: (863) 519-2792 Email: [email protected] August 2018 Kickoff Meeting March 7, 2019 Late Summer 2019 Early 2020 Alternatives Workshop Public Hearing Study Complete