Transcript

INDUSTRIAL TRAINING INDUSTRIAL TRAINING PRESENTATIONPRESENTATION

IEK YAN YEEIEK YAN YEE

2107721077

COMPANY BACKGROUNDCOMPANY BACKGROUND

Gamuda Sdn BhdGamuda Sdn Bhd– Turnkey and B.O.TTurnkey and B.O.T– Projects and Investments - South East and Projects and Investments - South East and

Far East Asia, Indochina, South Asia and Far East Asia, Indochina, South Asia and Middle EastMiddle East

– Scope of Expertise – highways and Scope of Expertise – highways and expressways, bridges, tunnels, dams and expressways, bridges, tunnels, dams and hydropower, hydraulic engineering and hydropower, hydraulic engineering and water treatment, railways and mass-rapid water treatment, railways and mass-rapid transit, marine works and ports, and transit, marine works and ports, and buildingsbuildings

MMC-Gamuda Joint MMC-Gamuda Joint VentureVenture

Project Delivery Partner (PDP)Project Delivery Partner (PDP)– Serve as a single point of accountabilityServe as a single point of accountability– Deliver the project within agreed time and Deliver the project within agreed time and

costcost– Packaging the worksPackaging the works– Calling tenderCalling tender– Evaluating bidsEvaluating bids– Selecting work packages contractsSelecting work packages contracts– Making the awards to work contractorsMaking the awards to work contractors

KLANG VALLEY MASS KLANG VALLEY MASS RAPID TRANSIT (KVMRT) RAPID TRANSIT (KVMRT) PROJECTPROJECT

SBK LINESBK LINE– First lineFirst line– From Sungai Buloh to KajangFrom Sungai Buloh to Kajang– Cut through Kuala Lumpur City Cut through Kuala Lumpur City

CenterCenter– Plan to serve 1.2 million passengersPlan to serve 1.2 million passengers

List of StationsList of Stations

SBK LINESBK LINE

LENGTHLENGTH 51km51km

LENGTH OF UNDERGROUNDLENGTH OF UNDERGROUND 9.5km9.5km

NUMBER OF STATIONSNUMBER OF STATIONS 3535

NUMBER OF INTERCHANGE NUMBER OF INTERCHANGE STATIONSSTATIONS

44

NUMBER OF PARK AND RIDENUMBER OF PARK AND RIDE 1313

CONSTRUCTION PERIODCONSTRUCTION PERIOD 2011 TO 2011 TO 20162016

SUMMARY OF ACTIVITIESSUMMARY OF ACTIVITIES

AutoCAD and MX RoadAutoCAD and MX Road GeotechnicalGeotechnical

AutoCAD and MX RoadAutoCAD and MX Road

AutoCADAutoCAD– User-friendly, User-friendly, – easy to learn and useeasy to learn and use

MX RoadMX Road– Has a lot of function to design Has a lot of function to design

alignmentalignment– Complicated, not easy to familiarizeComplicated, not easy to familiarize– Only useful if one is familiar with itOnly useful if one is familiar with it

GeotechnicalGeotechnical

Analyzing the soil characteristics Analyzing the soil characteristics – Deep Bore LogDeep Bore Log

Soil improvementSoil improvement– Compensation GroutingCompensation Grouting– Compaction GroutingCompaction Grouting

Compensation Compensation GroutingGrouting

Compaction GroutingCompaction Grouting

THANK YOUTHANK YOU

top related