www.parvmetal.com

PARV METAL PROCESSING CO.

WELCOMES YOU

COMPANY JOURNEY

TIMELINE

www.parvmetal.com

PMPC Journey TimelineOur Journey from 2004 till 2015

2004We Born

Started foundry business with 1000 sq.mtr area, with 01 No cupola (Cap 4 MTPH) & with sodium silicate -CO2 sand

process.

2005

Switched over to 100% moulding & core making in No-Bake sand process, installed heat treatment furnace & continuous mixture (Cap 6 MTPH).

2007

Got ISO certification fromTUV Rheinland

2008

www.parvmetal.com

Added third continuous mixture with 6 MTPH capacity and sand reclamation plant with the capacity of 6 MTPH.

2010

Set up new unit with installed capacity of 200 MTPM. Total Capacity 415 MTPM.

(And started using casting Simulation software (2nd unit in the entire region having such facility) to upgrade the quality requirement. Installed Induction furnace with two crucible of size 3 MT each. First Charge was taken on 8th Dec 2011.)

2011

Set up Laboratory with Spectrometer, Micro scope and UTM, also started use of Magnet for raw material handling.

Also in 2012, we started Exports business in USA ,Russia and Europe (Germany & Italy).

2012

We started the trails of S G Iron (GGG) for domestic as well as for International customer’s.

2014

www.parvmetal.com

We want to be No.1 foundry in India

Our Vision

Our mission is to be global leader in integrated foundry business through sustainable growth, knowledge, Excellency and innovation.

Our Mission

www.parvmetal.com

OUR ORGANIZATIONAL

STRUCTURE

www.parvmetal.com

www.parvmetal.com

Organizational StructurePA R V M E TA L P R O C E S S I N G C O .

SANJAY. I. SONIMARKETING

NEW DEVELOPMENTQUALITY ASSURANCE

M.R.S.A.P & ISO

S. D. JHALAPURCHASEFINANACE

ENVIRONMENT

K. J. JADEJAPRODUCTION

,MAINTAINANCEPATTERN DEVELOPING

B. B. JADEJAMANPOWER

TRANSPORTATIONNEW CONSTRUCTION

www.parvmetal.com

Department wise- Manpower allocation.PA R V M E TA L P R O C E S S I N G C O .

1

2

3

4

5

PRODUCTION DEPARTMENT -85 NOS

QUALITY DEPARTMENT – 7 NOS

Grinding, Fettling & Cleaning department- 18 NOS

ADMINISTRATION & HR DEPARTMENT-10 NOS

DESIGN & DEVELOPMENT + PATTERN SHOP-15 NOS

COMPANY’S

FACILITY

www.parvmetal.com

www.parvmetal.com

Facility – DesignPA R V M E TA L P R O C E S S I N G C O .

DESIGN : Pro-E (Creo) 3.0LICENSE VERSION

www.parvmetal.com

Facility – SimulationPA R V M E TA L P R O C E S S I N G C O .

SIMULATION : SOFTCAST 4.0LICENSE VERSION

www.parvmetal.com

ROUTERMACHINE

3X2 METER

PATTERNTYPES

PATTERNSTORAGE

VMC 1260X2 nos

O

ALUMINIUM

WOODEN

THERMCOL

Facility – Design & SimulationPA R V M E TA L P R O C E S S I N G C O .

www.parvmetal.com

Facility - ProductionPA R V M E T A L P R O D U C T I O N C O .

CUPOLA33”inch Dia - 6 MTPH (TERI design) 27”inch Dia - 4.5 MTPH (TERI design)

INDUCTION FURNACE3 MTx2 Crucible

CONTINUOUS MIXTURE6.6MTPH - 3Nos13.2MTPH

www.parvmetal.com

Facility - ProductionPA R V M E T A L P R O D U C T I O N C O .

COMPACTION TABLERAW MATERIAL HANDELINGElectrical Magnet : capacity 3 MTSize : DIA 133cm

MOULD MANIPULATOR

www.parvmetal.com

Facility - ProductionPA R V M E TA L P R O D U C T I O N C O .

SAND RECLAMATION EOT CRANENAME CAPACITY NOSWire Rope Electric Hoist 3 MT 8Wire Rope Electric Hoist 5 MT 17Wire Rope Electric Hoist 7.5 MT 3

HEAT TREATMENTStress reliving ProcessAnnealing Process

PRODUCT

RANGE

www.parvmetal.com

www.parvmetal.com

CNC MACHINE TOOLS

CONVENTIONAL MACHINE TOOLS

GEAR BOX PRESS PARTS

SPECIAL APPLICATION PARTS

PUMPS ANDVALVES CNC SURFACE PLATES AND TABLES

WHEELS AND PULLEYS

Product RangePA R V M E TA L P R O C E S S I N G C O .

DEPARTMENT OF

QUALITY

www.parvmetal.com

www.parvmetal.com

Quality Department - ManpowerPA R V M E TA L P R O C E S S I N G C O .

1

2

3

4

5

QUALITY ASSURANCE

QUALITY CONTROL

HIGH LEVEL SUPERVISOR

MIDDLE LEVEL SUPERVISOR

LOW LEVEL SUPERVISOR

www.parvmetal.com

Quality Department – Measuring instrumentsPA R V M E TA L P R O C E S S I N G C O .

• Vernier Caliper (Digital)• Vernier Caliper (450 MM)• Depth Vernier (Caliper)• Varnier Caliper (1000 MM)• Dial Vernier Caliper (300 MM)• Vernier Caliper (600 MM)• Digital Hardness Tester• Scratch Hardness Tester• Ferro lab• Pyrometer

• Spectro Meter• Universal Testing Machine• Microscope• Height gauge (300 MM)• Height gauge (600 MM)• Height gauge (1000 MM• Straight Edge (1500 MM)• Straight Edge (3000 MM)• Poldi Hardness Tester• Paint thickness gauge.

www.parvmetal.com

Quality DepartmentPA R V M E TA L P R O D U C T I O N C O .

MICROSCOPESPECTRO METERCOMPANY : Spectro Max (Germany)ELEMENT : 30

UNIVERSAL TESTING MACHINE

www.parvmetal.com

Quality DepartmentPA R V M E TA L P R O D U C T I O N C O .

PYROMETERHARDNESS TESTERDigital Hardness TesterPoldi Hardness Tester

CASTING FIRST SAMPLE INSPECTIONPattern Inspection100% Dimensional InspectionVisual InspectionLeakage InspectionPaint Thickness Inspection

www.parvmetal.com

Quality Department - Records(Traceability)PA R V M E TA L P R O C E S S I N G C O .

In House Rejection Report

Dispatch Report

Chemical Composition Report

Hardness & Visual Inspection Report

Tensile Strength Report

Drawing Control Sheet

GRINDING &

FETTLING

www.parvmetal.com

Grinding & Fettling – Shot BlastingPA R V M E TA L P R O C E S S I N G C O .

96 inch table size(NESCO Indabrator)

72 inch table size(NESCO Indabrator)

www.parvmetal.com

Grinding & FettlingPA R V M E TA L P R O D U C T I O N C O .

Electric Shaft Grinder

Electric Shaft Grinder

Pneumatic Grinder

Pneumatic Grinder

Pneumatic pencil Grinder

Pneumatic Rammer Grinder

Electric pencil Grinder

Electric shaft Grinder

PACKAGING

www.parvmetal.com

www.parvmetal.com

PackagingPA R V M E TA L P R O D U C T I O N C O .

DISPATCHING

www.parvmetal.com

www.parvmetal.com

DispatchingPA R V M E TA L P R O D U C T I O N C O .

TURNOVER

www.parvmetal.com

www.parvmetal.com

TurnoverPA R V M E TA L P R O C E S S I N G C O .

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16

0

5

10

15

20

25

30

35

40

Crore

Million Euro

2010-11 18.25 2.57

2011-12 21.55 3.04

2012-13 27.5 3.87

2013-14 32.7 4.6

2014-15 37.5 4.28

2015-16 47.4 6.6

(BUDGET FOR YEAR)

FINANCIAL YEAR SALES IN SALES IN(APRIL – MARCH) CRORE MILLION EURO

In 2016 with new expansion project, we will have spare capacity of 1500 to 2000 M Tonnes.

www.parvmetal.com

TurnoverPA R V M E TA L P R O C E S S I N G C O .

DOMESTIC EXPORT

FINANCIAL YEAR

(APRIL – MARCH) DOMESTIC

EXPORT

2012-13 88.24 %

11.76 %

2013-14 72.45 %

17.55 %

2014-15 76.39 %

23.61 %

2015-16 (Oct-15) 62 %

38 %

NEXT YEAR PROJECTED ANNUAL PRODUCTION

WILL BE (8000-9000) M TONNES

2012-13

2013-14

2014-15

2015-16

0102030405060708090

2012-13

2013-14

2014-15

2015-16

0

10

20

30

40

50

60

70

NEW

DEVELOPMENT

www.parvmetal.com

www.parvmetal.com

New DevelopmentPA R V M E TA L P R O C E S S I N G C O .

S.A.P (ERP) Software

Induction furnace 5 MTx2 (crucible) (dual track means 10 MT melting per CHARGE)

Crane : Capacity 20 MT ( 3 Nos.)

Continuous Mixture :Capacity 20 MTPH (2 Nos.)

5000 Sq. Meters land under construction

MISSION

2020

www.parvmetal.com

www.parvmetal.com

Mission 2020PA R V M E TA L P R O C E S S I N G C O .

Our Respected Customer list must have more than one among top five from different engineering sector as our Customer

Turnover – 20 Million Euro

Our AIM to ACHIEVE by 2020

Start Supplying Castings in fully machined condition

CUSTOMER

VISIT & EXHIBITION

www.parvmetal.com

www.parvmetal.com

Customer’s VisitPA R V M E TA L P R O C E S S I N G C O .

CUSTOMEREND VISIT

41www.parvmetal.com

www.parvmetal.com

ExhibitionPA R V M E TA L P R O C E S S I N G C O .

Exhibitor in IESS (2013),We are Exhibitor in IMTS (USA) & JIMTOF (Japan) in 2016.

www.parvmetal.com

OUR STRENGTH

TEAM MEMBERS

THANKS FOR WATCHING

HAVE A GREAT DAY!

www.parvmetal.com

top related