Transcript

alex

ande

r sam

uel d

avis

alex

ande

r sam

uel d

avis

cambridge fire station - fourth yearsäynätsalo town hall - fourth yearcopley square analysis - third yearblock sixteen analysis - third yearnew bedford ymca - third yearmackenzie architects - second year

first floor plan - apparatus baycam

brid

ge fi

re s

tatio

n

urban typologies studio - fourth yearcambridge massachusetts

third floor plan - public level

sliced axonometric - separation of user groups

10 feet

10 feet

10 feet

10 feet

10 feet

context diagram - landscape alterationsäyn

ätsa

lo t

own

hall

urban typologies studio - fourth yearsäynätsalo finlandalvar aalto precedent

landscape

excavation

back fill

view

parti diagram - building as doughnut

building courtyardintroduction

natural circulation

building diagrams - organizational relationships

solidstructure

axis

courtyard

exterior circulation

interior circulation

site plan - building situation

north

0 feet

120 feet

60 feet

0 miles

.70 miles

.35 miles

0 feet

900 feet

450 feet

0 miles

1000 miles

500 miles

245 feet

250 feet

255 feet

240 feet

260 feet

235 feet

230 feet

shadow study - occupancy versus shadecopl

ey s

quar

e an

alys

is

advanced representation - third yearboston massachusetts

79

0 feet

50

feet

boylston street

blagden street

huntington avenue

boylston street

saint james avenue

trinity p

lace

dartm

outh

streetdartm

outh

street

clarendon street

clarendon street

public alley 440 public alley 439

dartm

outh

clarendon

boylsto

n

saint jam

es

clarendon

copley sq

uare

shad

ow

study

050

feet

dartm

outh

trinity

huntin

gto

n

blag

den

boylsto

n

average shade

average occupancy

sum

mer

win

ter

hours o

f shad

e at solstice

10

0 feet

60

feet

70

feet

30

0 feet

experiential section - three minutes fifteen seconds

the B

osto

n P

ublic Lib

rary a

n e

xperie

ntia

l sectio

n a

lexander d

avis

0 min. 2 min.1 min. 3 min.

0 30 feet

0 30 feet

street edges - creation of the public realm

accumulation - history of the built environment

copley square: history of the built environment

old south church charles cummings

mueseum of fine arts john sturgis

trinity churchhenry richardson

boston public library charles mckim

fairmount copley hotel henry hardenberge

john hancock ieoh ming pei

bostix kioskgraham gund

00

00

90

80

70

60

50

40

30

20

10

90

80

when first designed, copley square was to be highly developed, with little to no green space

with the addition of the museum and the high numbers of pedestrians, green space was added

as trinity church was introduced to the square, it began to be shaped as a public space and destination

the library increased the public space of the square, and was coupled with the introduction of trinity island

when the museum moved to the back bay fens, the lot come home to the fairmount copley hotel

years after the square was allowed to become a continuous green space the iconic tower was built

the square today is home to some of bostons greatest architecture, and attracts numerous visitors

copley square

site perspective - building situationbloc

k si

xtee

n an

alys

is

architecture seminar - third yearstadshart almere the netherlandsrené van zuuk precedent

building section - programmatic distribution

storagefitnesshousing housinghousing housinghousing housinghousing housing

housing housinghousing housinghousing housinghousing housing

housing housinghousing housing

housing housinghousing housing

housinghousinghousinghousinghousinghousing

housing housinghousing housinghousing housinghousing housing

housing housinghousing housinghousing housinghousing housing

housing housinghousing housing

housing housinghousing housing

housinghousinghousinghousinghousinghousing

housinghousinghousinghousinghousinghousing

parkingcommercialentry

skip stop plans - directional views

3568

47

perspective vignettes - public to private

a

a

cd

e

b

f

b

c d e f

first floor plan - stationary levelnew

bed

ford

ym

ca

nineteen sixties urbanism studio - third yearnew bedford massachusetts

secondary floor plan - active level

longitudinal sections - floor plate manipulation

3

2

1

b

performance hall

perspective - view from above pleasant street

site plan - modular development “whiteface overlook”mac

kenz

ie a

rchi

tect

s

first cooperative employment - second yearburlington vermont

masterplan - “park place at malta”

construction assemblies - “captins lookout”

2x6 WOODSTUDS

WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS

EXTERIOR SIDINGBY "NICHIHA"

1" RIGID INSULATION(W/ TAPED JOINTS)

58" GWB

EXTERIORSHEATHING

SEE SCHEDULE(A950) FORADDITIONAL FINISHES

8"

WEATHERBARRIER

±1'-4 3/4"

1014"218" 43 4"

±1'-4 3/4"

1014" 43 4"

8" CMU (OR CONCRETE)FOUNDATION WALL , SEESTRUCTURAL DRAWINGS

758"

SEE PLANS FORADDITIONAL FINISHES

358" METALSTUDS

BRICKVENEER

58" GWB

58" EXTERIORSHEATHING

10"

WEATHERBARRIER

5"1'-3"

BRICK TIE

WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS

SEE SCHEDULE(A950) FORADDITIONAL FINISHES

EXTERIOR SIDINGBY "NICHIHA"

2" RIGID INSULATION(W/ TAPED JOINTS)

SEE SCHEDULE(A950) FORADDITIONAL FINISHES

978"±1'-8 3/4"

1014"4" 43 4"

±1'-4 3/4"

1'-0" 3"

358" METALSTUDS

BRICKVENEER

58" EXTERIORSHEATHING

WEATHERBARRIER

BRICK TIE

WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS

SEE SCHEDULE(A952) FORADDITIONAL FINISHES

ROLLER APPLIEDWATER PROOFING

8" CMU BEARING WALL,SEE STRUCTURE

1'-7"

4"1'-3"

8" CMU BEARING WALL,SEE STRUCTURE

4"

SEE SCHEDULE(A950) FORADDITIONAL FINISHES

8" CMU BEARING WALL,SEE STRUCTURE

12" CONCFOUNDATIONWALL, SEESTRUCTURE

2" BY 8"WOODSTUD

BRICKVENEER

58" GWB

58" EXTERIORSHEATHING

10"

WEATHERBARRIER

5"1'-3"

BRICK TIE

WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS

SEE SCHEDULE(A950) FORADDITIONAL FINISHES

WELDED WIREMASONRYREINFORCEMENT

BRICKVENEER

BRICK TIE

2x8 WOODSTUDS

SHEATHING

BRICKVENEER

12" CONCFOUNDATIONWALL, SEESTRUCTURE

MOISTURERESISTANTGWB

858"

2" 818" 2"

1'-714"

1112"58"

WALLCONSTRUCTIONASSEMBLIES

MTH. DD/YYYY AD

3" = 1'-0" EK A-003

Notes & Legends

Architect

Client

Consultant

Seal Project North

Sheet Title

Project Name

Consultant Project Number

Scale

Date Sheet Number

Checked By

Drawn By

MAPC Project Number

Key Plan - N.T.S.

DateRev Issue

Owne

rshipof

Instrumen

tsof

Service:

Allreports,drawings,specifications,com

puterfiles,fielddata,notes

andotherd

ocum

entsandinstrumentsprepared

bytheconsultantas

instrumentsofserviceshallrem

ainthepropertyoftheconsultant.T

heconsultantshallretainallcom

mon

law,statutoryandotherreservedrights,includingthecopyrightthereto.Th

eClientshallnotusetheInstrumentsofSe

rviceforfutureadditions

oralterations

tothisprojectofforotherprojects,unless

theclientobtainsthepriorw

rittenagreem

entofthe

Architect.

FGR Associates, LLC1698 Central AvenueALBANY, NY 12205

CAPTAIN'S LOOKOUT

COHOES NEW YORK

7082.00

95%CONSTRUCTIONDOCUMENTS30th DECEMBER 2008

SEE CODE SUMMERY AN ANALYSIS DRAWINGSFOR REQUIRED FIRE RATINGS OF ASSEMBLIES.

1.

construction details - “captins lookout”

SHINGLE RIDGE CAP TO MATCH ROOF

"RAPID RIDGE 7" RIDGE VENT,BY BENJAMIN OBDYKE INC.

UTILITY PIPESEE MEP DRAWINGS

PIPE BOOT

MEMBRANE ROOF - ADHERED

DRIP EDGE

NICHITRIM 1 X 5 1/2

CLABOARD SIDING

EXTERIOR SHEATHING

CDX PLYWOOD SHEATHING

2 X 6 STUD

2 X 6

METAL FLASHING

ARCHITECTURAL SHINGLES

ROOF TRUSSSEE STRUCTURE

ROOF SHEATHING

WEATHER BARRIER

MEMBRANE ROOF - ADHERED

DRIP CAP

DRIP CAP

1'-61 2"

512"

1'-478"

512"

3'-103

8"

3'-114"

NICHISHAKE

WRAP MEMBRANE OVER EDGE

STEEL CHANNELSEE STRUCTURE

1 1/4" SCHEDULE40 PIPE

1/2" SEALANTJOINT

METALSPINDLE

NOFASTNERS

SCREENPANEL

SCREENPANEL

1 1/4" SCHEDULE40 PIPE

STEEL CHANNELSEE STRUCTURE

METALSPINDLE

1 1/4" SCHEDULE40 PIPESTEEL CHANNELSEE STRUCTUREMETALSPINDLE

COLUMN SEE STRUCTURECOLUMN SEE STRUCTURE

1 1/4" SCHEDULE40 PIPEMETALSPINDLE

STEEL CHANNELSEE STRUCTURE

11 2"

112"

STRUCTURE BELOW

1 1/4" SCHEDULE40 PIPESTEEL CHANNELSEE STRUCTURE

METALSPINDLE

COLUMN SEE STRUCTURE

1 1/4" SCHEDULE40 PIPESTEEL CHANNELSEE STRUCTURE

METALSPINDLE

1 1/4" SCHEDULE40 PIPE

STEEL CHANNELSEE STRUCTURE

METALSPINDLE

Notes & Legends

Architect

Client

Consultant

Seal Project North

Sheet Title

Project Name

Consultant Project Number

Scale

Date Sheet Number

Checked By

Drawn By

MAPC Project Number

Key Plan - N.T.S.

DateRev Issue

Owne

rshipof

Instrumen

tsof

Service:

Allreports,drawings,specifications,com

puterfiles,fielddata,notes

andotherd

ocum

entsandinstrumentsprepared

bytheconsultantas

instrumentsofserviceshallrem

ainthepropertyoftheconsultant.T

heconsultantshallretainallcom

mon

law,statutoryandotherreservedrights,includingthecopyrightthereto.Th

eClientshallnotusetheInstrumentsofSe

rviceforfutureadditions

oralterations

tothisprojectofforotherprojects,unless

theclientobtainsthepriorw

rittenagreem

entofthe

Architect.

FGR Associates, LLC1698 Central AvenueALBANY, NY 12205

CAPTAIN'S LOOKOUT

COHOES NEW YORK

7082.00

95%CONSTRUCTIONDOCUMENTS30th DECEMBER 2008

PLAN AND SECTIONDETAILS

AD

1 1/2"= 1'-0" EK A-814

top related