Transcript
alex
ande
r sam
uel d
avis
cambridge fire station - fourth yearsäynätsalo town hall - fourth yearcopley square analysis - third yearblock sixteen analysis - third yearnew bedford ymca - third yearmackenzie architects - second year
first floor plan - apparatus baycam
brid
ge fi
re s
tatio
n
urban typologies studio - fourth yearcambridge massachusetts
context diagram - landscape alterationsäyn
ätsa
lo t
own
hall
urban typologies studio - fourth yearsäynätsalo finlandalvar aalto precedent
north
0 feet
120 feet
60 feet
0 miles
.70 miles
.35 miles
0 feet
900 feet
450 feet
0 miles
1000 miles
500 miles
245 feet
250 feet
255 feet
240 feet
260 feet
235 feet
230 feet
shadow study - occupancy versus shadecopl
ey s
quar
e an
alys
is
advanced representation - third yearboston massachusetts
79
0 feet
50
feet
boylston street
blagden street
huntington avenue
boylston street
saint james avenue
trinity p
lace
dartm
outh
streetdartm
outh
street
clarendon street
clarendon street
public alley 440 public alley 439
dartm
outh
clarendon
boylsto
n
saint jam
es
clarendon
copley sq
uare
shad
ow
study
050
feet
dartm
outh
trinity
huntin
gto
n
blag
den
boylsto
n
average shade
average occupancy
sum
mer
win
ter
hours o
f shad
e at solstice
10
0 feet
60
feet
70
feet
30
0 feet
the B
osto
n P
ublic Lib
rary a
n e
xperie
ntia
l sectio
n a
lexander d
avis
0 min. 2 min.1 min. 3 min.
0 30 feet
0 30 feet
copley square: history of the built environment
old south church charles cummings
mueseum of fine arts john sturgis
trinity churchhenry richardson
boston public library charles mckim
fairmount copley hotel henry hardenberge
john hancock ieoh ming pei
bostix kioskgraham gund
00
00
90
80
70
60
50
40
30
20
10
90
80
when first designed, copley square was to be highly developed, with little to no green space
with the addition of the museum and the high numbers of pedestrians, green space was added
as trinity church was introduced to the square, it began to be shaped as a public space and destination
the library increased the public space of the square, and was coupled with the introduction of trinity island
when the museum moved to the back bay fens, the lot come home to the fairmount copley hotel
years after the square was allowed to become a continuous green space the iconic tower was built
the square today is home to some of bostons greatest architecture, and attracts numerous visitors
copley square
site perspective - building situationbloc
k si
xtee
n an
alys
is
architecture seminar - third yearstadshart almere the netherlandsrené van zuuk precedent
storagefitnesshousing housinghousing housinghousing housinghousing housing
housing housinghousing housinghousing housinghousing housing
housing housinghousing housing
housing housinghousing housing
housinghousinghousinghousinghousinghousing
housing housinghousing housinghousing housinghousing housing
housing housinghousing housinghousing housinghousing housing
housing housinghousing housing
housing housinghousing housing
housinghousinghousinghousinghousinghousing
housinghousinghousinghousinghousinghousing
parkingcommercialentry
first floor plan - stationary levelnew
bed
ford
ym
ca
nineteen sixties urbanism studio - third yearnew bedford massachusetts
site plan - modular development “whiteface overlook”mac
kenz
ie a
rchi
tect
s
first cooperative employment - second yearburlington vermont
2x6 WOODSTUDS
WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS
EXTERIOR SIDINGBY "NICHIHA"
1" RIGID INSULATION(W/ TAPED JOINTS)
58" GWB
EXTERIORSHEATHING
SEE SCHEDULE(A950) FORADDITIONAL FINISHES
8"
WEATHERBARRIER
±1'-4 3/4"
1014"218" 43 4"
±1'-4 3/4"
1014" 43 4"
8" CMU (OR CONCRETE)FOUNDATION WALL , SEESTRUCTURAL DRAWINGS
758"
SEE PLANS FORADDITIONAL FINISHES
358" METALSTUDS
BRICKVENEER
58" GWB
58" EXTERIORSHEATHING
10"
WEATHERBARRIER
5"1'-3"
BRICK TIE
WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS
SEE SCHEDULE(A950) FORADDITIONAL FINISHES
EXTERIOR SIDINGBY "NICHIHA"
2" RIGID INSULATION(W/ TAPED JOINTS)
SEE SCHEDULE(A950) FORADDITIONAL FINISHES
978"±1'-8 3/4"
1014"4" 43 4"
±1'-4 3/4"
1'-0" 3"
358" METALSTUDS
BRICKVENEER
58" EXTERIORSHEATHING
WEATHERBARRIER
BRICK TIE
WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS
SEE SCHEDULE(A952) FORADDITIONAL FINISHES
ROLLER APPLIEDWATER PROOFING
8" CMU BEARING WALL,SEE STRUCTURE
1'-7"
4"1'-3"
8" CMU BEARING WALL,SEE STRUCTURE
4"
SEE SCHEDULE(A950) FORADDITIONAL FINISHES
8" CMU BEARING WALL,SEE STRUCTURE
12" CONCFOUNDATIONWALL, SEESTRUCTURE
2" BY 8"WOODSTUD
BRICKVENEER
58" GWB
58" EXTERIORSHEATHING
10"
WEATHERBARRIER
5"1'-3"
BRICK TIE
WET SPRAYEDCELLULOSE INSUL.,OR FIBERGLASSTHERMAL BATTS
SEE SCHEDULE(A950) FORADDITIONAL FINISHES
WELDED WIREMASONRYREINFORCEMENT
BRICKVENEER
BRICK TIE
2x8 WOODSTUDS
SHEATHING
BRICKVENEER
12" CONCFOUNDATIONWALL, SEESTRUCTURE
MOISTURERESISTANTGWB
858"
2" 818" 2"
1'-714"
1112"58"
WALLCONSTRUCTIONASSEMBLIES
MTH. DD/YYYY AD
3" = 1'-0" EK A-003
Notes & Legends
Architect
Client
Consultant
Seal Project North
Sheet Title
Project Name
Consultant Project Number
Scale
Date Sheet Number
Checked By
Drawn By
MAPC Project Number
Key Plan - N.T.S.
DateRev Issue
Owne
rshipof
Instrumen
tsof
Service:
Allreports,drawings,specifications,com
puterfiles,fielddata,notes
andotherd
ocum
entsandinstrumentsprepared
bytheconsultantas
instrumentsofserviceshallrem
ainthepropertyoftheconsultant.T
heconsultantshallretainallcom
mon
law,statutoryandotherreservedrights,includingthecopyrightthereto.Th
eClientshallnotusetheInstrumentsofSe
rviceforfutureadditions
oralterations
tothisprojectofforotherprojects,unless
theclientobtainsthepriorw
rittenagreem
entofthe
Architect.
FGR Associates, LLC1698 Central AvenueALBANY, NY 12205
CAPTAIN'S LOOKOUT
COHOES NEW YORK
7082.00
95%CONSTRUCTIONDOCUMENTS30th DECEMBER 2008
SEE CODE SUMMERY AN ANALYSIS DRAWINGSFOR REQUIRED FIRE RATINGS OF ASSEMBLIES.
1.
SHINGLE RIDGE CAP TO MATCH ROOF
"RAPID RIDGE 7" RIDGE VENT,BY BENJAMIN OBDYKE INC.
UTILITY PIPESEE MEP DRAWINGS
PIPE BOOT
MEMBRANE ROOF - ADHERED
DRIP EDGE
NICHITRIM 1 X 5 1/2
CLABOARD SIDING
EXTERIOR SHEATHING
CDX PLYWOOD SHEATHING
2 X 6 STUD
2 X 6
METAL FLASHING
ARCHITECTURAL SHINGLES
ROOF TRUSSSEE STRUCTURE
ROOF SHEATHING
WEATHER BARRIER
MEMBRANE ROOF - ADHERED
DRIP CAP
DRIP CAP
1'-61 2"
512"
1'-478"
512"
3'-103
8"
3'-114"
NICHISHAKE
WRAP MEMBRANE OVER EDGE
STEEL CHANNELSEE STRUCTURE
1 1/4" SCHEDULE40 PIPE
1/2" SEALANTJOINT
METALSPINDLE
NOFASTNERS
SCREENPANEL
SCREENPANEL
1 1/4" SCHEDULE40 PIPE
STEEL CHANNELSEE STRUCTURE
METALSPINDLE
1 1/4" SCHEDULE40 PIPESTEEL CHANNELSEE STRUCTUREMETALSPINDLE
COLUMN SEE STRUCTURECOLUMN SEE STRUCTURE
1 1/4" SCHEDULE40 PIPEMETALSPINDLE
STEEL CHANNELSEE STRUCTURE
11 2"
112"
STRUCTURE BELOW
1 1/4" SCHEDULE40 PIPESTEEL CHANNELSEE STRUCTURE
METALSPINDLE
COLUMN SEE STRUCTURE
1 1/4" SCHEDULE40 PIPESTEEL CHANNELSEE STRUCTURE
METALSPINDLE
1 1/4" SCHEDULE40 PIPE
STEEL CHANNELSEE STRUCTURE
METALSPINDLE
Notes & Legends
Architect
Client
Consultant
Seal Project North
Sheet Title
Project Name
Consultant Project Number
Scale
Date Sheet Number
Checked By
Drawn By
MAPC Project Number
Key Plan - N.T.S.
DateRev Issue
Owne
rshipof
Instrumen
tsof
Service:
Allreports,drawings,specifications,com
puterfiles,fielddata,notes
andotherd
ocum
entsandinstrumentsprepared
bytheconsultantas
instrumentsofserviceshallrem
ainthepropertyoftheconsultant.T
heconsultantshallretainallcom
mon
law,statutoryandotherreservedrights,includingthecopyrightthereto.Th
eClientshallnotusetheInstrumentsofSe
rviceforfutureadditions
oralterations
tothisprojectofforotherprojects,unless
theclientobtainsthepriorw
rittenagreem
entofthe
Architect.
FGR Associates, LLC1698 Central AvenueALBANY, NY 12205
CAPTAIN'S LOOKOUT
COHOES NEW YORK
7082.00
95%CONSTRUCTIONDOCUMENTS30th DECEMBER 2008
PLAN AND SECTIONDETAILS
AD
1 1/2"= 1'-0" EK A-814
top related