On-Demand Architecture for Network-Critical Physical Infrastructure

Large Data Centers

Small & Medium Data Centers

Computer Rooms & Closets

David BlumanisAPC, Data Centre Consultant, Asia Pacific

© 2003 APC corporation.

Network-Critical Physical Infrastructure (NCPI)

Essential foundation of

reliability

© 2003 APC corporation.

You have a large NCPI investment

Cooling Equipment: 6%

Power Equipment: 17%

Racks: 3%

Engineering &Installation: 19%

Space: 17%

Electricity: 27%Service: 13%

Typical 10 yr lifecycle TCO from $80K to $140K per rackSource: APC White Paper #6

© 2003 APC corporation.

Network-Critical Physical Infrastructure Challenges

Rapid changes in IT technology

High density

High operating/service costs

Increasing availability expectations

Server consolidation

Regulatory requirements

In response, APC is changing the way the world designs, installs, operates, manages and maintains Network-Critical Physical Infrastructure (NCPI)

© 2003 APC corporation.

The Business Value Equation for Network-Critical Physical Infrastructure

Availability Agility

TCOValue

x=

What are the barriers to improving value by 10x?

© 2003 APC corporation.

10 XAvailability Agility

TCOValue

x=

Equipment Reliability

Mean-Time-To-Recover

Human Error

Your entitlement: Reduce downtime by 90%

80% less

50% less

© 2003 APC corporation.

Case Study of Downtime Failures

Root Causes

0%

5%

10%

15%

20%

25%

30%

35%

EquipmentFailure

Human Error ConstructionRelated

DesignRelated

ExternalCauses

Consistent with Surveys which attribute 60% or more of failures to Human Error

© 2003 APC corporation.

Standardisation enables improved availability

Modularise

Pre-test systems in the factory

Hot swappable

Pre-Integrate Power-Cooling-Rack Management & diagnostics

One-Time Engineering

Unique training requirements

On-site assembly

On-site testing

Custom programming

Standardise To Eliminate

Standardisation accelerates learning at all levels, reducing human error and increasing availability

© 2003 APC corporation.

Availability

TCOValue

x=

Speed of Deployment

Ability to Scale

Ability to Reconfigure

Your entitlement: As much as 10 x the agility

100% easier

80% less time

100% easier

10 XAgility

© 2003 APC corporation.

Traditional Approach (200 days)

Design Concept

Construction Design

Construction

Commissioning

Operation

Custom Parts, Applications and Services

“I need more capacity.”

“I have more capacity.”

Needs Assessment

© 2003 APC corporation.

Data Centre traditional design

© 2003 APC corporation.

The Design Concept is built on standardised parts that can be scaled to meet the need?

Construction Design incorporates a “Lego Block” approach of pre-engineered components?

Construction is mainly done in a factory instead of on-site?

Commissioning tests pre-integrated infrastructure systems.

What if……

© 2003 APC corporation.

20% lessAvailability Agility

TCOValue

x=

Capital Cost

Electricity Costs

Service Costs

Your entitlement: As much 20% overall NCPI TCO

10% less

30% less

30% less

© 2003 APC corporation.

Waste due to oversizing

Reference: APC White paper #37

© 2003 APC corporation.

The Business Value Equation for Network-Critical Physical Infrastructure

Availability Agility

TCOValue

x=