On-Demand Architecture for Network-Critical Physical Infrastructure Large Data Centers Small & Medium Data Centers Computer Rooms & Closets David Blumanis APC, Data Centre Consultant, Asia Pacific
Dec 25, 2015
On-Demand Architecture for Network-Critical Physical Infrastructure
Large Data Centers
Small & Medium Data Centers
Computer Rooms & Closets
David BlumanisAPC, Data Centre Consultant, Asia Pacific
© 2003 APC corporation.
Network-Critical Physical Infrastructure (NCPI)
Essential foundation of
reliability
© 2003 APC corporation.
You have a large NCPI investment
Cooling Equipment: 6%
Power Equipment: 17%
Racks: 3%
Engineering &Installation: 19%
Space: 17%
Electricity: 27%Service: 13%
Typical 10 yr lifecycle TCO from $80K to $140K per rackSource: APC White Paper #6
© 2003 APC corporation.
Network-Critical Physical Infrastructure Challenges
Rapid changes in IT technology
High density
High operating/service costs
Increasing availability expectations
Server consolidation
Regulatory requirements
In response, APC is changing the way the world designs, installs, operates, manages and maintains Network-Critical Physical Infrastructure (NCPI)
© 2003 APC corporation.
The Business Value Equation for Network-Critical Physical Infrastructure
Availability Agility
TCOValue
x=
What are the barriers to improving value by 10x?
© 2003 APC corporation.
10 XAvailability Agility
TCOValue
x=
Equipment Reliability
Mean-Time-To-Recover
Human Error
Your entitlement: Reduce downtime by 90%
80% less
50% less
© 2003 APC corporation.
Case Study of Downtime Failures
Root Causes
0%
5%
10%
15%
20%
25%
30%
35%
EquipmentFailure
Human Error ConstructionRelated
DesignRelated
ExternalCauses
Consistent with Surveys which attribute 60% or more of failures to Human Error
© 2003 APC corporation.
Standardisation enables improved availability
Modularise
Pre-test systems in the factory
Hot swappable
Pre-Integrate Power-Cooling-Rack Management & diagnostics
One-Time Engineering
Unique training requirements
On-site assembly
On-site testing
Custom programming
Standardise To Eliminate
Standardisation accelerates learning at all levels, reducing human error and increasing availability
© 2003 APC corporation.
Availability
TCOValue
x=
Speed of Deployment
Ability to Scale
Ability to Reconfigure
Your entitlement: As much as 10 x the agility
100% easier
80% less time
100% easier
10 XAgility
© 2003 APC corporation.
Traditional Approach (200 days)
Design Concept
Construction Design
Construction
Commissioning
Operation
Custom Parts, Applications and Services
“I need more capacity.”
“I have more capacity.”
Needs Assessment
© 2003 APC corporation.
The Design Concept is built on standardised parts that can be scaled to meet the need?
Construction Design incorporates a “Lego Block” approach of pre-engineered components?
Construction is mainly done in a factory instead of on-site?
Commissioning tests pre-integrated infrastructure systems.
What if……
© 2003 APC corporation.
20% lessAvailability Agility
TCOValue
x=
Capital Cost
Electricity Costs
Service Costs
Your entitlement: As much 20% overall NCPI TCO
10% less
30% less
30% less