· of sugar unit from 2500 TCD to 7500 TCD and 20.5 MW to co-generation plant. The fresh water requirement was 117 KLD Malaprbha river, 2250 TPD Bagasse to be used as fuel. It is
Post on 16-Feb-2020
15 Views
Preview:
Transcript
top related
Post on 16-Feb-2020
15 Views
Preview:
Transcript
top related