MIDDLE SCHOOL RENOVATION

WEEKLY PROGRESSJUNE 28 – JULY 1

6/28/10

A-POD 1ST FLOOR NORTH SIDE

6/28/10

C-POD 1ST FLOOR SOUTH SIDE

6/28/10

D-POD 2ND FLOOR EAST SIDE

6/28/10

E-POD 2ND FLOOR NORTH SIDE

6/28/10

F-POD 2ND FLOOR SOUTH SIDE

6/28/10

GYM

6/28/10

RESTROOMS 1ST FLOOR

6/30/10GYM

6/30/10A-POD 1ST FLOOR NORTH SIDE

6/30/10A-POD 1ST FLOOR NORTH SIDE

6/30/10DOORS REMOVED NORTH SIDE AT GYM ENTRANCE

6/30/10E-POD 2ND FLOOR NORTH SIDE STEEL WALL

STUDS

6/30/10F-POD 2ND FLOOR SOUTH SIDE

7/1/10GYM

7/1/10C-POD 1ST FLOOR SOUTH SIDEPAINTING OF BLOCK WALLS

7/1/10C-POD 1ST FLOOR SOUTH SIDE

7/1/10A-POD 1ST FLOOR NORTH SIDEMORE BLOCK WALLS ERECTED

7/1/10NEW ENTRANCE TO LIBRARY

7/1/10F-POD 2ND FLOOR SOUTH SIDE

DRYWALLING OF ROOMS