  • Morayfield Road Upgrade Newsletter 4, September 2010 The Department of Transport and Main Roads is undertaking detailed design for the upgrade of Burpengary to Caboolture Road (known locally as Morayfield Road). Morayfield Road is a major arterial road that connects the Bruce Highway at Uhlmann Road with Caboolture, through the commercial centre of Morayfield. The preferred upgrade option is now being finalised and the department will call for tenders for construction in early 2011. The project will be completed in two stages:

    • Stage 1 - Gympie Creek to Gaffield Street

    • Stage 2 - Bruce Highway to Gympie Creek.

    Project timeline

    April 2006 After consultation, the project team compiled community feedback. Environmental, traffic and engineering studies commenced.

    November

    2006

    Road upgrade proposals were developed and presented to the community for feedback.

    Stage 1:

    Planning

    Early to

    mid 2007

    Proposals are assessed using the results of community feedback, and engineering, traffic and environmental studies.

    Stage 2:

    Detailed

    design

    2007 to late

    2010

    The preferred upgrade option is being designed in greater detail ready for construction.

    Stage 3:

    Construction

    Mid 2011 to

    2015

    Construction Stage 1 – mid 2011 Stage 2 – to continue after completion of Stage 1.

    Proposed project features Stage 1

    • Duplication of the existing two lanes to four lanes

    • Upgrades to Graham Road and Lindsay Road intersections

    • Construction of a new bridge over the North Coast Railway line

    Stage 2

    • Duplication of the existing two lanes to four lanes

    • Upgrades to Paradise Road and Gleeson Road intersections to include signals

    • Construct a service road between Gleeson Road and Paradise Road for local access

    Pedestrian and bicycle provisions presented in the proposed upgrade for both stages include:

    • wider road shoulders to allow for on-road cyclists

    • pedestrian activated crossings at the new Paradise Road and Gleeson Road traffic signals

    • upgrade of the existing traffic signals at the Graham Road and Lindsay Road intersections to facilitate pedestrian and cycle movements

    • a new walkway on the bridge over the North Coast Railway line.

    Benefits

    • Widened road shoulders of 2.5 metres will enable local residents and businesses fronting Morayfield Road to access their properties safely

    • Minimal impacts on the surrounding state reserve, as the majority of works will be undertaken within the allocated road reserve

    • New signals will be coordinated with the existing signals reducing through-traffic delays

    • Improved safety and efficiency for motorists, pedestrians and cyclists.

    To contact the project team

    Email: moreton.office@tmr.qld.gov.au Phone: +61 7 5313 8700 Post: Transport and Main Roads Morayfield Road Upgrade Project

    PO Box 1600, Maroochydore, Qld 4558

  • Morayfield Road Upgrade Stage 2

    Morayfield Road Upgrade Stage 1LEGEND MORAYFIELDROAD– 2TO4LANEUPGRADE NEWROAD NEWMEDIAN/ISLANDSNote:Layoutsshownareconceptualandaretobefurtherrefinedduringdetailedplanningpriortoconstruction

    FactSheet4_ProjectUpdate_Final.pdfMorayfield Rd map_no crops_HIRES

top related