project forDouble Storey Terrace House

Copyright © Oompa Loompa SDN.BHD. All rights reserved.

DarrenWilson

EnochHasif

Cromwell

Pui SunChloe

PROPOSED PROJECTThe Construction and Completion of a single unit Double Storey Terrace House A (Corner Lot) On Lot 509 (KOT 9541), Block 5, Sentah Segu Land District at 17th Mile of Kuching - Serian Road, Kuching, Sarawak

Architect :Design Network ArchitectsNo. 58, Iris Garden Square, Jalan Tong Wei Tah, 93200 Kuching Sarawak.Tel : 082-255082 Fax : 082-255081E-mail : dnaswk@gmail.com

Civil & Structural Engineer :ESWEL ENGINEERS SDN BHD2nd Floor, Lot 10148, Section 64, KTLD, Jalan Kwong Lee Bank, Pending, 93450 Kuching, SarawakTel : 082-342608 Fax : 082-334875E-mail : eswelengineer@gmail.com

Quantity Surveyor :Oompa Loompa SDN BHDJalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, MalaysiaTel : 03-56295000E-mail : OLQSQ@gmail.com

Scope of workSCOPE OF WORKS

Serian Road, Kuching, Sarawak

LOCATION OF SITE

PLANS AND ELEVATIONS

DOUBLE STOREY TERRACE HOUSE

TENDER DOCUMENTATION

TENDER FORM

PAM FORM-Form of agreement and condition, PAM Contract 2006

Formally known as the PAM Contracts 2006

Contains clauses and conditions that both the client and contractors must abide to.

TENDER FORM

For this project, all clauses are used but we suggest that Clauses that involve the client are to be nullified.

Clauses deemed to be nullified shall suggestively be Clauses:

-Clause 20.B and Clause 20.C

TENDER FORM

TENDERING METHOD

SELECTIVE-A pre-selected list of tenderers are prepared.

RM 5,000.00-Shall become payable by contractor immediately on receipt of notice in writing given to contractor by the client or its authorized representative

-The bank guarantee is effective from the date of submission of tender document by the tenderer and is to remain in force until a notice in writing to discontinue the same is given by the client or its authorized representative or until the tenderer is notified writing that his tender is unsuccessful.

EARNEST MONEY

PERFORMANCE BOND

5% of contract sum-If the Contractor shall in any respect fail to execute the contract or commit any breach of its obligations thereunder then the guarantor shall indemnify and pay the to the client.

-The bank guarantee shall be irrevocable and shall remain in force until the date of Certificate of Making Good Defects plus 3 months and 14 days in the said contract or any authorized extension, and in the case of the contract being determined, one year after the date of the determination claims, if any, must be received by the guarantor within the period of guarantee.

COMMENCEMENT DATE

4th of JULY 2016

COMPLETION DATE

30th of JUNE 2017

PRIME COST SUM

Electrical InstallationRM 20,000.00

Cold Water and Sanitary PlumbingRM 8,500.00

PROVISIONAL SUM

Builder's work in connection w/ M&E servicesRM 400.00

ContingenciesRM 10,000.00

Liquidated and Ascertained Damages

0.0181% per Day

damages whose amount the parties designate during the formation of a contract for the injured party to collect as compensation upon a specific breach

Liquidated and Ascertained Damages

Liquidated damages is set at 0.0181To ensure that contractors do not strictly delay the construction period.The percentile is set per day.

Liquidated and Ascertained Damages

Contractors are to get a Registered Surveyor to scout out discrepancies in the site.

Within the three weeks of handing the site over, Contractors are to inform Architects in charge to solve those discrepancies if found on site.

SITE SURVEY

Analysis of a proposed project to determine if it is profitable.

Summary of how profitable this project will be, we have taken two weeks into a feasibility study session.

FEASIBILITY STUDY

Located at the 17th Mile of Kuching.

Location is where commercial activities are carried out, which are shopping centers and what not.

FEASIBILITY STUDY

FINISHES

External Wall Cement Plaster with ICI Weathershield Paint

WALL FINISHES

Internal wall Cement Plaster with 'ICI' Weathershield paint (

all rooms)

WALL FINISHES

Internal wall (cont’d) 105mm x 105mm x 7mm 'Guocera' glazed

ceramic tiles (bathrooms)

WALL FINISHES

External floor Homogenous non-slip tiles

FLOOR FINISHES

Internal floor 50mm x 300mm x 10mm thick Kempas

hardwood parquet flooring (entry, living & dining, study room, store, staircase)

300mm x 600mm thick 'Kimgres' homogenous non-slip floor tiles (dry & wet kitchen, bathrooms)

FLOOR FINISHES

External ceiling Skim Coating, Cement Plaster with 'ICI'

emulsion paint (balcony) 9mm thick sloping moisture resistance fibrous

gypsum plaster ceiling

CEILING FINISHES

Internal ceiling 9mm thick fibrous gypsum plaster ceiling 9mm thick moisture resistance fibrous gypsum

plaster ceiling (bathrooms)

CEILING FINISHES

50mm x 300mm x 10mm thick Kempas hardwood parquet flooring

38mm x 50mm hardwood timber (handrailing)

STAIRCASE FINISHES

Washdown water closet Wall hang basin Single bow kitchen bow Bib tap

SANITARY FITTINGS

Brass head shower Toilet paper holder Floor trap

SANITARY FITTINGS

EXTERNAL WORKS

1200mm WidePL - 10.00IL - 9.60IL - 9.25IL - 9.27

600mm WidePL - 10.00IL - 9.27IL - 9.37

300mm WideBPL - 10.30IL - 9.68IL - 9.90

SURFACE WATER DRAINAGE

SEWER DRAINAGE

M.H 1 IL - 9.70

M.H 2 IL - 9.60

M.H 3 IL - 9.44

M.H 4 IL - 9.39

GL - 10.00

ROAD AND PAVEMENT

WATER RETICULATION