Top Banner
project for Double Storey Terrace House Copyright © Oompa Loompa SDN.BHD. All rights reserved. Darren Wilson Enoch Hasif Cromwell Pui Sun Chloe
46

Measurement 4 Presentation (QS)

Feb 13, 2017

Download

Education

Hasif Alias
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Measurement 4 Presentation (QS)

project forDouble Storey Terrace House

Copyright © Oompa Loompa SDN.BHD. All rights reserved.

DarrenWilson

EnochHasif

Cromwell

Pui SunChloe

Page 2: Measurement 4 Presentation (QS)

PROPOSED PROJECTThe Construction and Completion of a single unit Double Storey Terrace House A (Corner Lot) On Lot 509 (KOT 9541), Block 5, Sentah Segu Land District at 17th Mile of Kuching - Serian Road, Kuching, Sarawak

Architect :Design Network ArchitectsNo. 58, Iris Garden Square, Jalan Tong Wei Tah, 93200 Kuching Sarawak.Tel : 082-255082 Fax : 082-255081E-mail : [email protected]

Civil & Structural Engineer :ESWEL ENGINEERS SDN BHD2nd Floor, Lot 10148, Section 64, KTLD, Jalan Kwong Lee Bank, Pending, 93450 Kuching, SarawakTel : 082-342608 Fax : 082-334875E-mail : [email protected]

Quantity Surveyor :Oompa Loompa SDN BHDJalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, MalaysiaTel : 03-56295000E-mail : [email protected]

Page 3: Measurement 4 Presentation (QS)

Scope of workSCOPE OF WORKS

Page 4: Measurement 4 Presentation (QS)

Serian Road, Kuching, Sarawak

LOCATION OF SITE

Page 5: Measurement 4 Presentation (QS)

PLANS AND ELEVATIONS

Page 6: Measurement 4 Presentation (QS)

DOUBLE STOREY TERRACE HOUSE

Page 7: Measurement 4 Presentation (QS)
Page 8: Measurement 4 Presentation (QS)
Page 9: Measurement 4 Presentation (QS)
Page 10: Measurement 4 Presentation (QS)

TENDER DOCUMENTATION

Page 11: Measurement 4 Presentation (QS)

TENDER FORM

PAM FORM-Form of agreement and condition, PAM Contract 2006

Page 12: Measurement 4 Presentation (QS)

Formally known as the PAM Contracts 2006

Contains clauses and conditions that both the client and contractors must abide to.

TENDER FORM

Page 13: Measurement 4 Presentation (QS)

For this project, all clauses are used but we suggest that Clauses that involve the client are to be nullified.

Clauses deemed to be nullified shall suggestively be Clauses:

-Clause 20.B and Clause 20.C

TENDER FORM

Page 14: Measurement 4 Presentation (QS)

TENDERING METHOD

SELECTIVE-A pre-selected list of tenderers are prepared.

Page 15: Measurement 4 Presentation (QS)

RM 5,000.00-Shall become payable by contractor immediately on receipt of notice in writing given to contractor by the client or its authorized representative

-The bank guarantee is effective from the date of submission of tender document by the tenderer and is to remain in force until a notice in writing to discontinue the same is given by the client or its authorized representative or until the tenderer is notified writing that his tender is unsuccessful.

EARNEST MONEY

Page 16: Measurement 4 Presentation (QS)

PERFORMANCE BOND

5% of contract sum-If the Contractor shall in any respect fail to execute the contract or commit any breach of its obligations thereunder then the guarantor shall indemnify and pay the to the client.

-The bank guarantee shall be irrevocable and shall remain in force until the date of Certificate of Making Good Defects plus 3 months and 14 days in the said contract or any authorized extension, and in the case of the contract being determined, one year after the date of the determination claims, if any, must be received by the guarantor within the period of guarantee.

Page 17: Measurement 4 Presentation (QS)

COMMENCEMENT DATE

4th of JULY 2016

Page 18: Measurement 4 Presentation (QS)
Page 19: Measurement 4 Presentation (QS)

COMPLETION DATE

30th of JUNE 2017

Page 20: Measurement 4 Presentation (QS)

PRIME COST SUM

Electrical InstallationRM 20,000.00

Cold Water and Sanitary PlumbingRM 8,500.00

Page 21: Measurement 4 Presentation (QS)

PROVISIONAL SUM

Builder's work in connection w/ M&E servicesRM 400.00

ContingenciesRM 10,000.00

Page 22: Measurement 4 Presentation (QS)

Liquidated and Ascertained Damages

0.0181% per Day

Page 23: Measurement 4 Presentation (QS)

damages whose amount the parties designate during the formation of a contract for the injured party to collect as compensation upon a specific breach

Liquidated and Ascertained Damages

Page 24: Measurement 4 Presentation (QS)

Liquidated damages is set at 0.0181To ensure that contractors do not strictly delay the construction period.The percentile is set per day.

Liquidated and Ascertained Damages

Page 25: Measurement 4 Presentation (QS)

Contractors are to get a Registered Surveyor to scout out discrepancies in the site.

Within the three weeks of handing the site over, Contractors are to inform Architects in charge to solve those discrepancies if found on site.

SITE SURVEY

Page 26: Measurement 4 Presentation (QS)

Analysis of a proposed project to determine if it is profitable.

Summary of how profitable this project will be, we have taken two weeks into a feasibility study session.

FEASIBILITY STUDY

Page 27: Measurement 4 Presentation (QS)

Located at the 17th Mile of Kuching.

Location is where commercial activities are carried out, which are shopping centers and what not.

FEASIBILITY STUDY

Page 28: Measurement 4 Presentation (QS)

FINISHES

Page 29: Measurement 4 Presentation (QS)
Page 30: Measurement 4 Presentation (QS)
Page 31: Measurement 4 Presentation (QS)

External Wall Cement Plaster with ICI Weathershield Paint

WALL FINISHES

Page 32: Measurement 4 Presentation (QS)

Internal wall Cement Plaster with 'ICI' Weathershield paint (

all rooms)

WALL FINISHES

Page 33: Measurement 4 Presentation (QS)

Internal wall (cont’d) 105mm x 105mm x 7mm 'Guocera' glazed

ceramic tiles (bathrooms)

WALL FINISHES

Page 34: Measurement 4 Presentation (QS)

External floor Homogenous non-slip tiles

FLOOR FINISHES

Page 35: Measurement 4 Presentation (QS)

Internal floor 50mm x 300mm x 10mm thick Kempas

hardwood parquet flooring (entry, living & dining, study room, store, staircase)

300mm x 600mm thick 'Kimgres' homogenous non-slip floor tiles (dry & wet kitchen, bathrooms)

FLOOR FINISHES

Page 36: Measurement 4 Presentation (QS)

External ceiling Skim Coating, Cement Plaster with 'ICI'

emulsion paint (balcony) 9mm thick sloping moisture resistance fibrous

gypsum plaster ceiling

CEILING FINISHES

Page 37: Measurement 4 Presentation (QS)

Internal ceiling 9mm thick fibrous gypsum plaster ceiling 9mm thick moisture resistance fibrous gypsum

plaster ceiling (bathrooms)

CEILING FINISHES

Page 38: Measurement 4 Presentation (QS)

50mm x 300mm x 10mm thick Kempas hardwood parquet flooring

38mm x 50mm hardwood timber (handrailing)

STAIRCASE FINISHES

Page 39: Measurement 4 Presentation (QS)

Washdown water closet Wall hang basin Single bow kitchen bow Bib tap

SANITARY FITTINGS

Page 40: Measurement 4 Presentation (QS)

Brass head shower Toilet paper holder Floor trap

SANITARY FITTINGS

Page 41: Measurement 4 Presentation (QS)

EXTERNAL WORKS

Page 42: Measurement 4 Presentation (QS)

1200mm WidePL - 10.00IL - 9.60IL - 9.25IL - 9.27

600mm WidePL - 10.00IL - 9.27IL - 9.37

300mm WideBPL - 10.30IL - 9.68IL - 9.90

SURFACE WATER DRAINAGE

Page 43: Measurement 4 Presentation (QS)

SEWER DRAINAGE

M.H 1 IL - 9.70

M.H 2 IL - 9.60

M.H 3 IL - 9.44

M.H 4 IL - 9.39

GL - 10.00

Page 44: Measurement 4 Presentation (QS)

ROAD AND PAVEMENT

Page 45: Measurement 4 Presentation (QS)

WATER RETICULATION

Page 46: Measurement 4 Presentation (QS)