IBM Maximo Scheduler 7.5.1

Including Graphical Assignment

Maximo Scheduler Overview

Functions:Creating SchedulesScheduling work in a Gantt Chart View Resource Planning Resource Assignments

Graphical Assignments

Preliminary Steps

Create a Calendar

Associate the Calendar to a Labor record

Setup the Work Order

Creating a Schedule

Managing Work in Gantt View

Activity Table

Activity Chart

Schedule Compliance

Dragging Work in Gantt View

Dragging Groups of Tasks

Constraints and Alerts

Resource Table

When specific craft

is highlighted,

Maximo can indicate

which work orders

utilize that craft

Resource Chart

If the top row for Crafts is selected, all craft requirements will display. Shift availability does not display for multiple crafts.

If one specific craft is selected, the resource requirement and availability is displayed.

Multiple crafts can be selected by holding the Ctrl key and selecting the crafts.

Schedule Costs - High Level Costs

Schedule Costs – Itemized Breakdown

Schedule Costs – Cost Comparison

Other Resource Availability

Group Work by Work Property

Work Cost

Schedule compliance

PM Forecast Gantt View

PM Reforecast from Gantt View

Precedent Constraints

Graphical Assignment Manager

Graphical Assignment Manager

Check Assignments in Work Order Tracking