ITDA Review
Post on 08-Jul-2015
665 Views
Preview:
DESCRIPTION
Transcript
Srikakulam – ITDA Seethampeta
Vizianagaram – ITDA Parvathipuram
Vishakhapatnam – ITDA Paderu
Objectives for the day
ICE-BREAKING?
Let us start…
Development is not a slow process!
17th October, 2011
14th October, 2011 Asst AMO (Srikakulam) – KGBV, Ranastalam
11Field Visit - Srikakulam, Vizianagaram and Vishakhapatnam (12th to 20th October)
• Specific – Who: Who is involved?
– What: What do I want to accomplish?
– Where: Identify a location.
– When: Establish a time frame.
– Which: Identify requirements and constraints.
– Why: Specific reasons, purpose or benefits of accomplishing the goal.
• Measurable - How much? How
many?
• Attainable
• Realistic
• Timely
– Breaking it into parts
S.M.A.R.T
• SMS
• Call
• Share with everyone
• Missed Call!
• Always Reply
Excuse Management
Follow up
Issue Issue Level
PriorityIssue Type
(General/Specific)Suggestion /
SolutionAction to be
taken byDeadli
ne
Issue observe
d in
ITDA name
Remarks
Subject teachers posts are vacant in
6th/7th/8th class of Ashram
schools and KGBVs visited
SPD 2 GeneralPri Sec / SPD to decide on the
issueSPD / Pri Sec
15th Nov
GTWAH School, Chinnab
agga
Seethampeta, issue
present even
in other ITDAs
Teachers lack in
conceptual clarity, the
present method of training is
not adequate to
improve their skills. Training is
only for the namesake
SPD 1 General
Training has to be given
continuously and outside of
the parent ITDA
SPD / Pri Sec10th Nov
In all 3 ITDAs
All ITDAs
• Customised Teacher training in tribal areas– TOT training (10th – 14th Nov)– 26-27 Resource Persons (RP) / ITDA ….deadline!– RP will remain same throughout 2012– Send your BEST RPs– Training in tribal areas
• Date for training in tribal areas• In batches of 20-30• There should not be any wastage of time!
• Socio Linguistic Survey• Administrative issues - fixing up with deadlines• Quality Improvement with deadlines
Thank you
top related