Benefits-
Savings-Preventing evaporation of product, which willpay for itself in less than a year
Prevents Pollution - Prevents evaporation andharmful vapors from entering the atmosphere
8/13/2019 Ipi Floating Roof
3/13
Savings-
For example, in a typical 120' (36.6 meter) diameter tank
the losses from a fixed roof tank would be more than
5,550 barrels. With a floating roof installed you would
save more than 5,480 barrels for a savings of over
$200,000 each year.
By reducing evaporation losses in excess of 95%, the
floating roof pays for itself in as little as 6 months.
8/13/2019 Ipi Floating Roof
4/13
A Typical Uncovered Tank 1.7 Million pounds of pollutionand $300,000 is lost annually on a typical uncovered 120
ft diameter gasoline tank
Savings-
8/13/2019 Ipi Floating Roof
5/13
Technology-
Design Strength:The floating roof is designed for apoint load of 750 pounds which exceeds API Appendix H
requirements by a full 50%. In fact, our roof has been
field tested with a concentrated load exceeding 2,000pounds without failure.
Pontoons: Our 10 inch diameter x 0.064 inch thickpontoons, utilizing aluminum alloy 3004-H36 are more
than twice (225%) as strong as the competitor's 8 inch(0.050, alloy 5050 H38) pontoons. In addition, all
automatic welding eliminates hand welding errors.
8/13/2019 Ipi Floating Roof
6/13
Technology-
Pivot Joints:All floating roofs come equipped withunique pivot joint to allow flexural movement between
adjacent main pontoons.
Clamp Beam:Perfected the vapor tight, metal-to-metaljoint that recent API testing has shown to be critical for a
good floating roof design.
8/13/2019 Ipi Floating Roof
7/13
Technology-
Computer Technology: Each roof is custom designedfor the planned service utilizing complex computer
programming and the latest evaporation loss data
available. Computerization of the design and productionprocess allows very rapid response times, even for
relatively non-standard application
8/13/2019 Ipi Floating Roof
8/13
Jobs Completed (Nigeria)
1.Integrated Oil and Gas- Total of three tanks
1.) 2 tanks : 35m diameter, 20m height
2.) 1 tank: 28.6m diameter, 17.5m height
2. Mobil Nigeria Plc-Total of one tanks1.) 1 tanks: 30m diameter, 13.5m height
3. Total Nigeria Plc- Total of three tanks1.) 1 tank: 22m diameter, 12m height
2.) 1 tank: 26m diameter, 14m height
3.) 1 tank: 22m diameter, 12m height
8/13/2019 Ipi Floating Roof
9/13
Pictures of ongoing works:
8/13/2019 Ipi Floating Roof
10/13
Ongoing Works:
8/13/2019 Ipi Floating Roof
11/13
Ongoing Works:
8/13/2019 Ipi Floating Roof
12/13
Video Floating Roof
http://ultraflote.com/images/Ultraflote_Video_56k.WMV
http://ultraflote.com/images/Ultraflote_Video_56.WMVhttp://ultraflote.com/images/Ultraflote_Video_56.WMVhttp://ultraflote.com/images/Ultraflote_Video_56.WMVhttp://ultraflote.com/images/Ultraflote_Video_56.WMV8/13/2019 Ipi Floating Roof
13/13
Thank You
Iron Products Industries provides complete turnkey
services from budget preparation to installation.
Engineering
Construction
Inspections and Repairs
Technical Partners
(Houston, USA)
top related