Insert Product Photograph Here. People Mgmt Skills Mgmt Skills The Highwall Puzzle Pieces Communication Equipment Reserves.

Post on 31-Mar-2015

213 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

Transcript

Insert Product Photograph Here

PeoplePeopleMgmt SkillsMgmt Skills

The Highwall Puzzle Pieces The Highwall Puzzle Pieces

Com

mun

icat

ion

Com

mun

icat

ion

EquipmentEquipment

ReservesReserves

People

Miner Operator 1

Endloader Operator 1

Mechanic 1

Electrician 1

General Laborer 3

Foreman 1

Total 8

People• Labor shortage

• Two – twelve hours shifts / day

• Operate 4 – 6 days per week

• Maintenance 1 day per week

• Geographic locations change often

• Exposed to nature’s elements

• Perceived as a short term job

Reserves

• Seam heights 2.5 – 28 ft

• Sustain a 1-3 year project

• 40,000 – 200,000 tpm

• Best if not previously auger mined

• Competent roof or ability to leave head coal

• Mine bottom up

Equipment Spread

• Modified Continuous Miner

• Cascading Conveyor Cars

• Launch Vehicle

• Stacker - 54 inch belt

• Bulldozer - pushing coal

• 2 Endloaders – loading & unloading cars & loading trucks

• Water Storage Tank

Communication

• Real time info in the cab

• Web based storage

• Real time communication with

home office (under development)

Communication

• Real time info in the cab

• Web based storage

• Real time communication with

home office (under development)

Communication

• Real time info in the cab

• Web based storage

• Real time communication with home office (under development)

Management Skills

• Long term mine planning

• Synchronization of equipment

• Synchronization of qualities/ markets

• Keeping available wall

Longwall/Highwall Similarities

• Sole purpose is to cut coal

• Initial reluctance to rely on the technology

• Typically the lowest cost coal from a mining complex

• Keeping gate roads ahead is as challenging as keeping wall available

Safety

Mining Method NFDL Rate

ADDCAR 0.00

Surface Mining 1.59

Underground Mining 5.72

( 3rd Qt 2005 - YTD)

Productivity

Mining Method TPEH

Western Surface Mines 22.1

ADDCAR 18.3

Longwall Mines 5.0

Eastern Surface Mines 4.2

Non-Longwall Underground Mines 3.4

( 3rd Qt 2005 - YTD)

Narrow Pit System

• Footprint reduced from 90 – 45 ft

• Continuous coal flow

• Fewer fines

• Horizontal & vertical guidance

• 1,200 ft penetration

• Purchase – lease – contract mine

ADDCAR Advantages

• Cascading cars

• Navigational System

• Volume

Conclusion

If you keep wall …. you experience this

top related