Gram tarang ppt by D.N Sahu

Post on 22-May-2015

538 Views

Category:

Education

4 Downloads

Preview:

Click to see full reader

DESCRIPTION

It is a summer internship project ppt on Gram Tarang (BC Project) in srikakulam A.P

Transcript

SUMMER INTERNSHIP PROGRAM AT GRAM TARANG , SRIKAKULAM

Presented By Dharma NarayanaReg no- 110202MBR008

INTRODUCTION BREDS started in the year 1983 B.C Project started in the year 2009 It is working in 35 Mandal in Srikakulam

District Mr. Venket Sibananda Managing Director Mr. Ram Prasad Dash District Project

Manager Each Mandal Having one Mandal

Coordinator(MC)

FUNCTIONS

Enrolment of Beneficiaries and distribution of Smart Card.

Appointment of CSP and MC. Cash Management Customer Transactions through CSPs CSP Operations/ Services

ATYATI TECHNOLOGY We have a technical support like

Atyati. Atyati is a software company and it supports all the technical issues for us. We made a MOU with Atyati on 8TH September 2009.

Atyati has developed a software applications i.e GANSEVA which can be used by B.C project.

GANASEVA

PROCESS OF BC PROJECT  

  

  

  

 

 

GOVERNMENT

ANDHRABANK

ATYATI TECNOLOGY

BC & BREDS

MANDALA CORDINATER

COMMUNITY SERVICE

PROVIDOR (CSP)

NREGA WORKER &SSP PAINSION

PAYMENT OF NERGA AND SSP The CSP will distribute the payment among the

beneficiary. NREGA and SSP payment is distributing in the

public place like school, panchaiyat office etc. SSP payment once a month. NERGA payment 3-4 times per month Payment are paid to the systematically The CSP will give the money to the authorize

beneficiary by doing authentication process. Each member are 6 figure print save in the system

NERGA beneficiary are getting the money after 2 weeks of the field work.

TECHNICAL SYSTEMS

Laptops

Finger print Scanner (FPS)

Smart Card Reader (SCR)

SLIPS

Acutance

Pay Slip

PACKAGE DATA

It will save automatically while the distribution of payment.

After the payment distribution the MC will generate a file.

The file will uploaded in server for minimize the server amount.

WORK DONE I have covered 3 mandal i.e Pathapatnam,

Meliyaputti and Heramandalam for 1st month and Pathapatnam, Meliyaputti and Mandasa for 2nd month

My objective is to minimize the server amount so I collected package data and uploaded in the server.

Daily I visited 2-3 GPs and collected package data

I collected Acutance slip from the beginning and submitted to the corresponding MC.

CONT.

I gave training to some CSP for using the data card.

Reconciliation at CSREM campus

BENEFITS OF BC PROJECT

Timely payment No corruptions Payment in the village Hand to hand payment

PROBLEMS OF B.C PROJECT

System Errors Virus problem Figure print don’t match Smartcard reader problem Shortage inventory Data upload problem

THANK

YO U

top related