GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.
Post on 30-Dec-2015
213 Views
Preview:
Transcript
GOODWIN CREEK @ MCBRIDE PROPERTY,
NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007
The final design was based on the landowner’s required stream and riparian
corridor functions (the Cadillac Plan)
Goodwin Creek @ McBride Property Design Layout for
Bends 1 & 2
Tieback/key- 1.0 ton/ft
LPSTP- 0.5 ton/ft
LPSTP- 1.0 ton/ft
KEY
Traffic Control Stones
Bendway Weirs 1.0 ton/ft
Boil-Up Pool 2.0 tons/ft
Bend 1
Bend 2
FLOW
DESIGN CHOSEN BY THE LANDOWNER FOR BEND #1:
LPSTP WITH BENDWAY WEIRS & MAXIMUM
VEGETATION. BANK ALMOST COMPLETELY
BUILT OUT INTO STREAM (UPPER BANK SLIGHTLY
LAID BACK AT EDGE)
Goodwin Creek-Cross Section-Soil Cut/Fill Area (Bend 1)
NOTE: All cut/fill activity will be in balance
KEY
LPSTP
Fill area
ELE +0.0
+12+15
Varies 7 to 14 ft
Cut areas
This left bank cut area will also provide a floodplain bench for the stream
6 ft
LPSTP
Top bank, right descending bank
Project designers Dr. Andrew Simon ARS-NSL & Dave Derrick, ERDC-CHL
GOODWIN CREEK–CONSTRUCTION-FEB 2007–DIRK SPENCER
Or slap a Sycamore with the trackhoe & release a thousand seeds
GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK
Redman’s trees seeds spread on ground - BEND #1
GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN
We talked the Pennington sales rep out of 4 bags of
“Pennington SLOPEMASTER Mix”
grass seed. This seed worked well in our
application. Extreme upper bank was not as lush or robust as other
areas. Possibly a lack of moisture issue?
GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ
Seeding “Pennington Slope Master Mix” grass seed - BEND #1
GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ
This PowerPoint presentation was developed & built by Dave Derrick.
Any questions or comments, call my personal cell @ 601-218-7717, or email @ d_derrick@r2d-eng.com