GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and riparian corridor functions (the Cadillac Plan)
27

GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Dec 30, 2015

Download

Documents

Marjorie Black
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

GOODWIN CREEK @ MCBRIDE PROPERTY,

NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007

The final design was based on the landowner’s required stream and riparian

corridor functions (the Cadillac Plan)

Page 2: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

THIS METHOD IS A RON REDMAN

DISCOVERY (RRD)

Page 3: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

1

23

4

5

6

7

8

9

10

11

12

Bend #1

Bend #2

Page 4: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Goodwin Creek @ McBride Property Design Layout for

Bends 1 & 2

Tieback/key- 1.0 ton/ft

LPSTP- 0.5 ton/ft

LPSTP- 1.0 ton/ft

KEY

Traffic Control Stones

Bendway Weirs 1.0 ton/ft

Boil-Up Pool 2.0 tons/ft

Bend 1

Bend 2

FLOW

Page 5: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

BEND #1 WAS USED FOR THE LAST 10

YEARS TO DEVELOP THE ARS BANK

STABILITY NUMERICAL MODEL

Page 6: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

DESIGN CHOSEN BY THE LANDOWNER FOR BEND #1:

LPSTP WITH BENDWAY WEIRS & MAXIMUM

VEGETATION. BANK ALMOST COMPLETELY

BUILT OUT INTO STREAM (UPPER BANK SLIGHTLY

LAID BACK AT EDGE)

Page 7: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Bend #1, Looking DS

Page 8: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Pix with outline of proposed work

FILLCUT

CUT

LPSTP

Typical post-project cross-section

Page 9: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Goodwin Creek-Cross Section-Soil Cut/Fill Area (Bend 1)

NOTE: All cut/fill activity will be in balance

KEY

LPSTP

Fill area

ELE +0.0

+12+15

Varies 7 to 14 ft

Cut areas

This left bank cut area will also provide a floodplain bench for the stream

6 ft

LPSTP

Top bank, right descending bank

Page 10: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Project designers Dr. Andrew Simon ARS-NSL & Dave Derrick, ERDC-CHL

GOODWIN CREEK–CONSTRUCTION-FEB 2007–DIRK SPENCER

Page 11: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

THE PLAN

Actually Derrick’s

cheat sheet

PIX BY DANNY KLIMETZ

Page 12: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

TREE & GRASS SEEDING & MULCHING

BEND #1

Page 13: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Ron Redman says break up the Sycamore tree seed balls & add them to the hydroseed mix

Page 14: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Or slap a Sycamore with the trackhoe & release a thousand seeds

GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

Page 15: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Sycamore seeds everywhere - BEND #1

GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

Page 16: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Redman’s trees seeds spread on ground - BEND #1

GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN

Page 17: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

We talked the Pennington sales rep out of 4 bags of

“Pennington SLOPEMASTER Mix”

grass seed. This seed worked well in our

application. Extreme upper bank was not as lush or robust as other

areas. Possibly a lack of moisture issue?

GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

Page 18: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Seeding “Pennington Slope Master Mix” grass seed - BEND #1

GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

Page 19: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Hay bales for mulch - BEND #1

GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN

Page 20: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Rolling and spreading hay - BEND #1

GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN

Page 21: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Mulch the bank, this section is done - BEND #1

GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

Page 22: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Looking DS at mid & lower end of BEND #1

GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN

Page 23: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Looking DS @ the crew - BEND #1 – 99% DONE

GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

Page 24: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Bend #1 DONE!

Looking US & panning clockwise

Page 25: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

Looking US BEND #1

GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

Page 26: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

This PowerPoint presentation was developed & built by Dave Derrick.

Any questions or comments, call my personal cell @ 601-218-7717, or email @ [email protected]

Enjoy the information!!

Page 27: GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.

The Bassett as a mountain lion