George Russell IV Stormwater Program Manager

Environmental Complaints and Local Services

Stormwater Permitting

What do we do? Divide tasks between ECLS and WQD

Paperwork! ~2700 facilities All paperwork goes through our group

NOIs and NOTs

Invoicing Annual fees and application fees

Inspections 53 Environmental Specialists throughout the state

21 Field offices

Complaints and NOTs

Permitting Process Enter NOI into database/Invoice

Technical Review

Supervisor Review

Finalization-Issue Permit/Check for past due fees

Inspections/Enforcement/Invoicing

NOT processing

Inspection

Termination

Renewal Same process

We mailed packets to all current permit holders

Submit NOI by January 16, 2018

Best way is through email at

ecls-stormwaterpermitting@deq.ok.gov

SWP3 required to be submitted for review for

Sites over 40 acres, or

Over 5 acres in the Lake Thunderbird watershed, or

In a sensitive watershed

All fees must be paid before a new permit will be issued

Notice of Intent Different and longer

Where can I find it?

How do I fill it out?

Make sure it is complete and accurate.

http://www.deq.state.ok.us/

Notice of Termination No more Inspection Request forms

The NOT now acts as a IR form

Only 1 NOT form per 90 days per site

2012 General Permit

Permit was terminated at midnight the day it was signed

2017 General Permit

Your permit is not terminated until we send a termination letter

Notice of Termination When we get the NOT

Assign an inspection to the local ES

15 days to complete the inspection

Send pass/fail letter

2 reasons to terminate

Site is stabilized

You are no longer the owner/operator

Notice of Termination Stabilization

Uniform perennial vegetative cover (70%)

No large bare areas (10 square feet)

Pavement, gravel, rip-rap

Coverage

Covered

NotCovered

Notice of Termination No longer in charge of the site

Send in NOT along with NOI of new operator

If you are in a subdivision

For each lot you sell fill out an NCO

Keep with your SWP3 until you are ready to terminate

The new operator must obtain permit coverage

Current Status 1600 Industrial Permits (Renewals due October 3rd)

400 No Exposure

2700 Construction Permits (Renewals due January 16th)

Priority to new permits

Please be patient

Personal Musings Stormwater is important

A Permit is only a piece of paper, you are responsible for what leaves your site

Education is the best BMP

Contact Information George Russell IV

george.g.russell@deq.ok.gov

405-702-6100

Thank you!

Any Questions?