Top Banner
George Russell IV Stormwater Program Manager Environmental Complaints and Local Services
14

George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Jun 30, 2018

Download

Documents

NguyễnÁnh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

George Russell IV Stormwater Program Manager

Environmental Complaints and Local Services

Page 2: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Stormwater Permitting

Page 3: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

What do we do? Divide tasks between ECLS and WQD

Paperwork! ~2700 facilities All paperwork goes through our group

NOIs and NOTs

Invoicing Annual fees and application fees

Inspections 53 Environmental Specialists throughout the state

21 Field offices

Complaints and NOTs

Page 4: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Permitting Process Enter NOI into database/Invoice

Technical Review

Supervisor Review

Finalization-Issue Permit/Check for past due fees

Inspections/Enforcement/Invoicing

NOT processing

Inspection

Termination

Page 5: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Renewal Same process

We mailed packets to all current permit holders

Submit NOI by January 16, 2018

Best way is through email at

[email protected]

SWP3 required to be submitted for review for

Sites over 40 acres, or

Over 5 acres in the Lake Thunderbird watershed, or

In a sensitive watershed

All fees must be paid before a new permit will be issued

Page 6: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Notice of Intent Different and longer

Where can I find it?

How do I fill it out?

Make sure it is complete and accurate.

http://www.deq.state.ok.us/

Page 7: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Notice of Termination No more Inspection Request forms

The NOT now acts as a IR form

Only 1 NOT form per 90 days per site

2012 General Permit

Permit was terminated at midnight the day it was signed

2017 General Permit

Your permit is not terminated until we send a termination letter

Page 8: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Notice of Termination When we get the NOT

Assign an inspection to the local ES

15 days to complete the inspection

Send pass/fail letter

2 reasons to terminate

Site is stabilized

You are no longer the owner/operator

Page 9: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Notice of Termination Stabilization

Uniform perennial vegetative cover (70%)

No large bare areas (10 square feet)

Pavement, gravel, rip-rap

Coverage

Covered

NotCovered

Page 10: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Notice of Termination No longer in charge of the site

Send in NOT along with NOI of new operator

If you are in a subdivision

For each lot you sell fill out an NCO

Keep with your SWP3 until you are ready to terminate

The new operator must obtain permit coverage

Page 11: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Current Status 1600 Industrial Permits (Renewals due October 3rd)

400 No Exposure

2700 Construction Permits (Renewals due January 16th)

Priority to new permits

Please be patient

Page 12: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Personal Musings Stormwater is important

A Permit is only a piece of paper, you are responsible for what leaves your site

Education is the best BMP

Page 13: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do

Contact Information George Russell IV

[email protected]

405-702-6100

Page 14: George Russell IV Stormwater Program Manager …€¦ · George Russell IV Stormwater Program Manager Environmental Complaints and Local Services . Stormwater Permitting . What do