Future Nordic Grid Investments Ulf Moberg February, 2007

Post on 08-Feb-2016

37 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Future Nordic Grid Investments Ulf Moberg February, 2007. What we are and what we do What we are doing What we will do. Nordel. Nordel is a body for co-operation between the transmission system operators (TSOs) in the Nordic countries (Denmark, Finland, Iceland, Norway and Sweden), - PowerPoint PPT Presentation

Transcript

Future Nordic Grid Investments

Ulf Moberg

February, 2007

2 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel

1. What we are and what we do

2. What we are doing

3. What we will do

3 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel

Nordel is a body for co-operation between the transmission system operators (TSOs) in the Nordic countries (Denmark, Finland, Iceland, Norway and Sweden),

whose primary objective is to create the conditions for, and to develop further, an efficient and harmonised Nordic electricity market.

4 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel

• Acts as one Nordic TSO• Etablished Nordic Grid Code

– Operational code– Planning code– Connection code

• The Nordic electricity market functions well …

… but further development is first priority

5 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel

Our vision for further development:

A more efficient market and improved security of supply

6 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Examples of activities and projects today

• Harmonisation of connection code for wind farms• Common Nordic principles for power system

adequacy and tendering process for peak power• Common software for balance management (in

operation)• Harmonisation of balance management rules and

pricing• Common training sessions for operational staff

(efficient handling of disturbances)• Congestions management principles• Common planning of new investments

7 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Investments: What we do today

• On-going investment projects of 1 billion Euro• A package of five large transmission projects

– To improve the Nordic marked and– To improve system security

• A common Nordic planning process and• a common Nordic investment plan

8 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel´s strategicprojects

• Overall investments of 1 bill. Euro

• Improved electricity tradeand better reliability

9 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel´s strategicprojects

Fenno-Skan 2200 km cable + 100 km overhead lineDecided Commissioning 2010260 mill Euro800 MW

Fenno-Skan 2200 km cable + 100 km overhead lineDecided Commissioning 2010260 mill Euro800 MW

Overall investments of 1 bill. Euro

10 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Fenno-Skan 2 HVDC

Existing cable

New cable

11 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel´s strategicprojects

Järpströmmen – Nea400 kV line, 100 kmDecidedCommissioning 200966 mill Euro+ 300 MW i stage 1,+ 750 MW later

Järpströmmen – Nea400 kV line, 100 kmDecidedCommissioning 200966 mill Euro+ 300 MW i stage 1,+ 750 MW later

Overall investments of 1 bill. Euro

12 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nea – Järpströmmen 400 kV line

13 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nea – Järpströmmen 400 kV lineDesign competition

14 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nea – Järpströmmen 400 kV line

Asymmetrisk tvåsamhet - i relation följs vi åt

”Ihålig stolpkonstruktion som skall mjuka upp den starka strömmens hårdhet och förena den med moder jords mjuka former. En fröjd för fru älg och alla vi andra som njuter av naturen. Slingrande som en fjällbäck, fast rätt upp i himlen! Två vänners sköna skär på en snöig fjällsluttning…

I relation människa – natur”Artist Anna Cronheden

15 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nea – Järpströmmen 400 kV line

16 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nea – Järpströmmen 400 kV line

17 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel´s strategicprojects

the South Link Sydlänken400 km, HVDC optionDecidedCommissioning 2011 150 mill Euro+ 400-500 MW

the South Link Sydlänken400 km, HVDC optionDecidedCommissioning 2011 150 mill Euro+ 400-500 MW

Overall investments of 1 bill. Euro

18 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s The South Link

19 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel´s strategicprojects

the Great BeltStorebaelt56 km HVDCDecidedCommissioning 2010 160 mill Euro+ 600 MW

the Great BeltStorebaelt56 km HVDCDecidedCommissioning 2010 160 mill Euro+ 600 MW

20 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s The Great Belt Connection

21 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel´s strategicprojects

Skagerrak IV245 kmDecision during 2007Commissioning 2012 (earliest) 260 mill Euro+ 600 MW

Skagerrak IV245 kmDecision during 2007Commissioning 2012 (earliest) 260 mill Euro+ 600 MW

22 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s The Big Five

• Overall investments of 1 bill Euro

• Improved electricity tradeand better reliability

Nordel report: Prioritized cross sections www.nordel.orgNordel report: Prioritized cross sections www.nordel.org

23 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s What´s next?

• The Big Five are not the final stage• Nordel will not rest• The next Nordic System Development Plan has

started– Scenarios for year 2020-2025– Simulations– Socio economic conciderations– Seminars with market actors and authorities– Finished in December 2007

24 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Next System Development Plan

Aspects to be evaluated• Market functioning

– Bottlenecks and price differences– Market power (abuse of)

• Adequacy– Risk of energy shortage– Risk of power shortage

• Network losses• Investment alternatives

– Transmission– Generation

25 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Next System Development PlanResults

• System status 2015 - 2025• Weaknesses in the system• Interesting (profitable) new transmission

projects• Advantageous areas for new generation

26 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s Nordel Summing Up• We have a well functioning Nordic market • Nordic TSO´s have gone from coordinated to common

planning • The Big Five are a result of this• Financing: Agreement that

– the distribution of costs between the countries was acceptable

– the congestion rent in the Nordel system should be divided in pro rata relation to investment costs

• This has been achieved by the TSO’s alone. No pressure or interference from regulators or other authorities

• Next System Development Planwill give a basis for the next step to future investments

27 (28)

O r

g a

n i s

a t

i o n

f o

r N

o r

d i c

T r

a n

s m

i s

s i o

n S

y s

t e

m O

p e

r a

t o r

s

Thank You!

www.nordel.org