Flood Avoidance and MitigationMichael PowellDelaware Department of Natural Resourcesand Environmental ControlShoreline and Waterways Management

Shoreline and Waterways Management

What we do:

•Manage public beaches (i.e. erosion control, beach nourishment•Regulate construction along the Atlantic and Delaware Bay shore•Maintain inland navigational channels•Assist in floodplain mapping•Assist in regulating development in flood prone areas•Provide technical and financial assistance for flood projects

What constitutes a flood disaster?

Types of flood mitigation projects•non structural - floodplain management (loss avoidance)•non structural – flood mitigation projects (acquisition / relocation)•non structural – elevation and floodproofing•structural projects

Evaluating and designing flood mitigation projects•Determining flood risk

•floodplain maps and studies•flood damage history

•How to select a project - alternatives analysis•project goals and constraints•environmental constraints•avoiding impacts

•Benefit cost analysis

Success stories•Glenville floodplain buyout•Cape Henlopen State Park groin rehabilitation•New Castle County dry floodproofing projects

Is this a disaster?

Is this a disaster?

Floodplain in flood stage – no disaster here!

Disasters result when we occupy high risk areasNew Castle County Delaware September 2003

Disasters result when we occupy high risk areasGulfport, Mississippi - Hurricane Katrina

Hurricane Katrina was a major disaster affecting•Several states•Millions of people•Over $80 billion damage

The majority of flood disasters aresmall and localizedFlooding in Sussex County Delaware, June 2006Less than 100 properties affected

>$30,000 structural damage to basement wallSeaford Delaware, June, 2006

II. Types of Flood Mitigation Projects

Determining the flood risk at a given location

Floodplain management – Don’t occupy high risk areas

BestLocal land use regulations which define flood-prone areas

and prohibit new development in those high risk areas.

More CommonRegulations which discourage development in high risk

areas but allow development as long as buildings are designed to minimized flood risk

Types of projects to protect vulnerable development

FEMA issued floodplain MapWidely Available nationwideShows 100-year floodplain

88

89

90

91

Base Flood Elevations(100-year) storm(1% annual chance exceedence)

Best: Local land use regulations define flood-prone areas and prohibit new development in those high risk areas.

stream

BaseFlood Elevation

Base Flood Elevation = 89

Ground Elevation = 84

More Common: Regulations discourage development in flood prone areas, allow it with buildings designed tom minimize flood risk

100-year flood elevation = 89

Ground Elevation = 84

25-year flood elevation = 87

10-year flood elevation = 85

Flood Level

Simple elevation of a flood prone house

Elevation and relocation of a flood prone home on the Delaware Bay

Flood Level

Flood Level

Dry floodproofing of commercial structure in New Castle County

Flood Level

100 year floodplain

100 year floodplain

New wetlands/flood storage

Evaluating and designing flood protection projects

•Project goals•Site limitations•Avoiding environmental impacts•Benefit cost analysis

Project goals

•Public safety – reducing risk to people•Property protection – public infrastructure and private property•Reduction in emergency response during storms•Avoid loss of critical services – fire, police, medical etc.•Environmental enhancement and restoration•Recreational opportunities

Site limitationsProperty factors frequently will dictate project options

•Size of property – availability of land for structural flood control•Historic properties – historic preservation issues•Environmental Protections

•Wetlands•Endangered species•Hazardous materials

•Local zoning and codes

Site limitations•Sufficient room on property•Wide open floodplain – berm does not increase flooding on adjacent properties

Riverwalk Townhouses – Flood protection berm

Site limitations•Insufficient room on property•narrow floodplain – berm would flood adjacent vulnerable properties

Dry floodproofing within existing building footprint

Safety Issues•Property protection vs. safety•Flood response

Safety Issues•Property protection vs. safety•Flood response•High risk areas

Benefit Cost Analysis

Generally a project should provide greater benefits than the cost to construct the project

Benefit Cost Analysis

Generally a project should provide greater benefits than the cost to construct the project

Project costs•Planning Design•Property acquisition•Construction•Management•Maintenance

Project Benefits(define project lifetime)•Damage prevented•Life/safety benefits•Recreational •Environmental•Reduction in response

100-year flood elevation = 89

Ground Elevation = 84

25-year flood elevation = 87

10-year flood elevation = 85

100-year flood elevation = 89 = $20,000

Ground Elevation = 84

25-year flood elevation = 87 = $10,000

10-year flood elevation = 85 = $5,000

100-year flood elevation = 89 = $20,000

Ground Elevation = 84

25-year flood elevation = 87 = $10,000

10-year flood elevation = 85 = $5,000

Project costs•Planning Design $2,000•Property acquisition $0•Construction $25,000•Management $2,000•Maintenance $0

Project Benefits – Elevate houseproject lifetime 25 years•Damage prevented $25,000•Life/safety benefits ???•Recreational No•Environmental No•Reduction in response ??? (No)

Success Stories

Examples OfSuccess

Glenville floodplain Buyout and deed restriction

•Community supported•Multi purpose project•Solves the problem “completely”•Permanent (relatively)•Environmental benefit•Roads will be removed soon

100 year floodplain

100 year floodplain

New wetlands/flood storage

Herring Point, Cape Henlopen State Park

•Failure of old rock and timber groins•Narrow beach – exposed tree stumps pose swimming risk•Deterioration of surfing•Threat to WWII Bunkers

Sand transport is south to north. Groins which trapped sand flow have failed leading to rapid erosion

Sand transport is south to north. Groins which trapped sand flow have failed leading to rapid erosion

Define problem

•Swimming hazard•Loss of beach•Bluff erosion•Surf break deteriorated

Sand transport is south to north. Groins which trapped sand flow have failed leading to rapid erosion

Define Project Goals•Protect Historic Structures•Reduce swimming hazards•Restore beach width•Stop bluff erosion•Avoid furthing impacts to surf break

Herring Point, Cape Henlopen State Park

Sand transport is south to north.Bunkers and parking area built in vulnerable location

•Swimming hazard•Loss of beach

•Damage to park facilities•Recreational impacts

•Bluff erosion•Threat to bunkers•Safety hazard

•Bluff erosion•WWII listening cable damaged

Herring Point, Cape Henlopen State Park

Alternatives Evaluated

Do nothing – continued erosionBreakwaters – stops erosion but swimming

and surfing hazardRebuild Groins - stops erosion while enhancing surfing

and swimming quality

Bluff locationBluff location JAN 9 2007

Consequences of failure to act:•Continued bluff erosion leading to hazardous conditions and incremental loss of the overlook parking lot.

Photo credit:Rod Rodgers

Photo credit:Kyle Howard

April 17, 2007Pre-construction photo

May 14, 2007Mid-construction

July 10, 2007post-construction

January 2008midwinter

Flow of sand

Concern about negative effects on “downdrift” beach?