February 11, 2014
Mr. Mark Dimondstein President American Postal Workers
Union, AFL-CIO 1300 L Street, NW Washington, DC 20005-4128
Dear Mark:
Certified Mail Tracking Number: 7013 1090 0002 4435 7215
As information, enclosed is a copy of the first Post Implementation Review for the Chillicothe, Ohio Customer Service Mail Processing Center (CSMPC) Area Mail Processing (AMP).
In accordance with the Non-Disclosure Agreement dated February 11, 2013, the Postal Service is providing both redacted and unredacted copies of the PIR.
If you have any questions, please contact Rickey Dean at extension 7412.
Sincerely,
Patrick M. Devine Manager Contract Administration (APWU)
Enclosures
(CA2014-119)
Type of Distribution Consolidated: Destinating Facility Name & Type: Chillicothe CSMPC
Street Address: 40 S Walnut St City: Chillicothe
State: OH 50 Facility ZIP Code: 45601
District: Cincinnati Area: Eastern
Finance Number: 381575 Current 30 ZIP Code(s): 456
Miles to Gaining Facility: 54.9 EXFC office: Yes
Plant Manager: David Huelsbeck Senior Plant Manager: Chris H Smith
District Manager: Charles P McCreadie
Facility Name & Type: Columbus OH P&DC Street Address: 2323 Citygate Dr
City: Columbus State: OH
50 Facility ZIP Code: 43218 District: Cincinnati
Area: Eastern Finance Number: 381793
Current 30 ZIP Code(s): 430-433, 437, 438 EXFC office: Yes
Plant Manager: Chris H Smith Senior Plant Manager: Chris H Smith
District Manager: Charles P McCreadie
Approval Date: February 23, 2013 Implementation Date: Apr-01-2013
PIR Type: 1st PIR
REDACTED
Date Range of Data: Apr-01-2013: Sep-30-2013 Processing Days per Year: 310
Bargaining Unit Hours per Year: 1,745 EAS Hours per Year: 1,822
Date of DAR Factors/Cost of Borrowing/
New Facility Start-up Costs Update June 16, 2011
Date & Time this workbook was last saved: I 01-16-2014 12:03
Area Vice President: Vice President, Network Operations:
Area AMP Coordinator: NAI Contact:
Joshua D. Colin David E. Williams Bob Roseberry Gary T. Curran I Todd Katkow
PIR Data Entry Page
2
Executive Summary Last Saved January 16, 2014 Date Range of Data:
Losing Facility Name and Type: Street Address:
City: State:
Current SCF ZIP Code(s):
Type of Distribution Consolidated:
Gaining Facility Name and Type: Street Address:
City:
Savings/Costs
Function 1 Workhour Savings
Non-Processing Craft Workhour Savings (less Maint!Trans)
PCES/EAS Workhour Savings
Transportation Savings
Maintenance Savings
Space Savings
Total Annual Savings
Total One-Time Costs
Total First Year Savings
Staffing Craft Position Loss
PCES/EAS Position Loss
Service FCM Service Performance (EXFC & PFCM 0/N)
FCM Service Performance (EXFC & PFCM 2 Day)
FCM Service Performance (EXFC & PFCM 3 Day)
Customer Experience Measurement Overall Satisfaction Residential at PFC level
Customer Experience Measurement Overall Satisfaction Small Business at PFC level
Chillicothe CSMPC 40 S Walnut St
1st PIR vs Pre AMP 1st PIR vs Approved
4
$0
4
Losing Current Qtr Gaining Current Qtr
9422% 95.98%
96.19% 97.10%
96.06% 96.59%
90.82%
84.26%
PIR Type: 1st PIR Apr-01-2013 - Sep-30-2013
from Workhour Costs - Combined
from Other Curr vs Prop
from Other Curr vs Prop
from Transportation HCR and Transportation PVS
from Maintenance
from Space Evaluation and Other Costs
from Space Evaluation and Other Costs
from Staffing-Craft
from Service Performance & CSM
from Service Performance & CSM
from Service Performance & CSM
from Service Performance & CSM
from Service Performance & CSM
PIR Executive Summary
Cal~ulatioo Befenm~es Combined Losing and Gaining Facility Data: Pre AMP Proposed 1st PIR
Function 1 Workhour Costs $68,708,162 $68,611 ,978 $66,563,817 Non-Processing Craft Workhour Costs $6,710,504 $6,710,504 $6,756,882 (less Maintenance & Transportation)
PCES/EAS Workhour Costs $9,504,005 $9,504,005 $8,999,238 Transportation Costs $1,061,574 $1,099,586 $1,157,318
Maintenance Costs $27,120,177 $27,051,966 $27,991,954 Space Savings $0 $0 $0
Total Annual Cost $113,104,423 $112,978,040 $111,469,209
Total One-Time Costs $0 $16,120 $0
Total First Year Costs $113,104,423 $112,994,160 $111,469,209
Staffing
Craft Position Total On-Rolls 1,322 1,321 1,346 PCES/EAS Position Total On-Rolls 84 88 81
1st PIR vs Proposed 1st PIR vs Pre-AMP (A~~roved} AMP Approved AMP
Function 1 Workhour Savings $2,144,345 $2,048,161 $96,184 Non-Processing Craft Workhour Savings ($46,379) ($46,379) $0 (less MainUTrans)
PCES/EAS Workhour Savings $504,768 $504,768 $0 Transportation Savings ($95,743) ($57,732) ($38,012)
Maintenance Savings ($871 ,778) ($939,988) $68,210 Space Savings $0 $0 $0
Total Annual Savings $1,635,214 $1,508,831 $126,383
Total One-Time Costs $0 $16,120 ($16,120)
Total First Year Savings $1,635,214 $1,524,951 $110,263
Staffing Craft Position Loss (24) (25) 1
PCES/EAS Position Loss 3 7 (4)
PIR Executive Summary
Summary Narrative Last Saved: January 16, 2014
Losing Facility Name and Type: Chillicothe CSMPC Current SCF ZIP Code(s): 456
Type of Distribution Consolidated: Destinating
Gaining Facility Name and Type: Columbus OH P&DC Current SCF ZIP Code(s): 430- 433, 437, 438
The Eastern Area, with the assistance of the Cincinnati District, has completed the first Post Implementation Review (PIR) of the Area Mail Processing (AMP) that consolidated destinating mail from the Chillicothe Ohio CSMPC into the Columbus Ohio P&DC. The transfer of destinating mail from the Chillicothe Ohio CSMPC to the Columbus Ohio P&DC began on January 16, 2013 and the implementation was completed on January 23, 2013. The data for the pre-AMP period was July 2010 though June 2011 and included all operations for the Chillicothe Ohio CSMPC and the Columbus Ohio P&DC. The data for the 6-month PIR is April 01, 2013 thru September 30, 2013.
Athens OH CSPMC (Athens) and Dayton OH P&DC (Dayton) Operations were also transferred into Columbus OH P&DC operations. These concurrent activities added workload to Columbus and had a direct impact on the workhours and costs reported in this PIR. The implementation of the Athens AMP was completed by January 09, 2013. Columbus began cancelling Dayton's originating mail on February 02, 2013. The Dayton originating AMP was finalized on February 08, 2013.
Financial Summary:
Combined Losing and Gaining Facility Data:
Function 1 Workhour Costs
PCESJEAS Workhour Costs
Transportation Costs
Maintenance Costs
Space Savings
Total Annual Cost
Total One-nme Costs
Total First Year Costs
Pre AMP $68,708,162
$6,710,504 $9,504,005 $1,061,574
$27,120,177
$0
$113,104,423
First PIR Vs Pre-AMP
Total Annual Savings Total One-Time Cost Total First Year Savings
$1,635,214 $0 $1,635,214
Proposed 1st PIR $68,611,978 $66,563,817
$6,710,504 $6,756,882 $9,504,005 $8,999,238 $1,099,586 $1 '157,318
$27,051,966 $27,991 ,954 $0
$111,469,209
$16,120 $0
$112,994,160 $111,469,209
First PIR Vs Approved
$1,508,831 $ 16,120 $1,524,951
The first PIR savings is above the proposed first-year savings of $110,263. The consolidation transferred an average daily volume of 180,000 pieces FHP from the Chillicothe CSMPC to the Columbus P&DC. Transportation was realigned to maintain the overnight service commitments between 456 Chillicothe and 430-433, 437-438, 457 Columbus. The PIR includes impacts that can be attributed to the following concurrent activities that occurred after the completion of the AMP package and whose impacts were not reflected in the Pre-AMP base periods for either Athens or Columbus.
• AMP of Athens OH CSMPC implemented on January 16, 2013 with a proposed F1 work hour, Transportation and Maintenance costs in Columbus totaling $148,389.
• AMP of Dayton OH P&DC originating Mail implemented on February 02, 2013 with a proposed F1 work hour, , Transportation and Maintenance costs in Columbus totaling $4,006,158.
Customer Service Considerations:
The EXFC overnight, 2-day and 3-day mail service performance is shown below for the Chillicothe Ohio CSMPC and the Columbus Ohio P&DC.
PIR Summary Narrative
Chillicothe Ohio
95.42% 96.60% 96.40% 96.60% 96.77% 97.41% 96.79% 96.54% 96.65% 95.86% 94.22% 96.19% 9606%
Columbus Ohio
The EXFC overnight, 2-day, and 3-day mail service performance has degraded slightly for Chillicothe since the AMP had taken effect. Columbus EXFC Overnight and 2-day service degraded slightly in 04 Fy 2013. Columbus has put measures in place to improve Overnight and 2-day and 3-day service and will continue to monitor progress.
No change to Retail or BMEU operations.
Transportation Changes:
The approved AMP projected an annual Transportation cost of $38,012. The first PIR projects a cost of $95,743. Highway routes had to be adjusted to deliver the DPS Mail to the units on time. Trips were split to accommodate the additional volume from Columbus.
PIR Summary Narrative
Staffing Impacts:
The approved AMP proposal identified a reduction of 1 craft employees and an increase of 4 EAS employees. Complement data at the end of the final PIR period shows that complement in Chillicothe has decreased by 1 craft employee over the Pre-Amp number. The Total increase over the proposed craft staffing is 25 employees. This number is addition of craft employees in Columbus to accommodate the increased workload. EAS Staffing in Chillicothe has been reduced by 1 employee. EAS Staffing in Columbus has been reduced by 6 positions vs. the Proposed-Amp number. Columbus has reduced EAS Staffing by 2 positions vs. pre-AMP staffing levels.
Craft 1 33 32
Ma ent 4 3 (1) 84 78
1 Craft= FTR+PTR+PTF+Casuals
1 : 17 1 1 : 16 1 : 11
1 8 1 : 36 1 : 31
1 Craft= FTR+PTR+PTF+Casuals 2 Craft= F1 + F4 at Losing; F1 only at Gaining
25
PIR Summary Narrative
Maintenance Impacts:
The approved AMP projected an annual Maintenance savings of $68,210 with the consolidation of the destinating operations into the Columbus Ohio P&DC. The CSBCS Machines were removed from the Chillicothe office, and the mail was moved to the Columbus P&DC for processing. The first PIR is projecting an annual cost of$ 939,988. This is due to additional work performed at Twin Rivers drive to facilitate future Mail Consolidation projects, and to remove the CSBCS Machines from Chillicothe. This is due to increased staffing in Maintenance, and in-house work performed at Twin Rivers Drive to accommodate the future mail consolidations (Dayton OH P&DC destinating operations). The work performed was to prepare the building to move the AFSM 100 Machines to Twin Rivers drive to make room for additional DBCS Machines at Citygate.
Space Impacts and One-Time Facility Costs:
The approved AMP projected $16,120 for one-time costs associated with the AMP. The total one-time cost associated with this AMP is $0. This is a savings of $16,120.
PIR Summary Narrative
Service Performance and Customer Satisfaction Measurement Last Saved: January 16, 2014
Losing Facility: Chillicothe CSMPC District: Cincinnati
Gaining Facility: Columbus OH P&DC District: Cincinnati
PIR Type: Implementation Date:
1st PIR 04/01/13
(15) Notes: _____________________ _
Customer Satisfaction Measurement (CSM) became Customer Experience Measurement 2010. Data reflects most recently completed quarter available in CEM.
Overall Satisfaction (Overall Experience) Satisfaction with Receiving (Experience with receiving)
............... , ............ ;;;;::.:..:. .... :.:.: ........... ; ............. ~ .. : .. :.:.: .. :.: ......... JSatisfaction with Sending (Experience with sending) : ........... + ........... : .. :...:.: .. : .. ::. ....... +········=.::.:.:..:: .......... 1satisfaction with most frequently visited PO (Experience with most frequently visited PO)
I 67.82% 43.45% Satisfaction with most recent contact with USPS (Experience with most recent contact witt ·~·r~ .... e29oo/:··~r··· s4~6ao/o ......... Likely to recommend the USPS
PIR Service Performance and Customer Satisfaction Measurement
Workhour Costs -Combined Facilities
I Combined Facilities I Last Saved January 16,2014
PIR Type*: ~·:~.: ,~..:.:;,o.:;::;:::;"-;..-;::::-:::::::::::J7.~61f.:>
Type of Distribution Consolidated: ---·--... Q.~~n,a,tin-"'gc_ __ _ Date Range of Data: -~ ...... ~~~~.~~~- to _S!E::~~~-·- .. ·-·-
PIR Workhour Costs Combined Facilities
PI R Workhour Costs ~ Combined Facilities
P!R Workhour Costs ~Combined Facilities
(27)NOTES: ______________________________________________________________________________________________________________________________________________________________________ _
~~)!Nm-·,
PI R Workhour Costs - Combined F aci!ities
Workhour Costs -Losing Facility last Saved: January 16, 2014
Losing Facility: Chillicothe CSMPC PIR Type·: .~ . .F'.1.~~···::cc::;;;:·;;~~;;ac,z·.;aroirieii
Type of Distribution Consolidated: Destinating Date Range of Data: Apr.01-2013 to Sep...J0--2013
PIR Workhour Costs ¥ Losing
PIR WorKhour Costs- Losing
PIR WorKhour Costs ¥ Losing
P\R WorKhour Costs ~ Losing
PIR Workhour Costs Losing
Workhour Costs ·Gaining Facility Last Saved- January 16, 2014
Gaining Facility: Columbus OH P&DC PIR Type*: ~'::.: :.~ ~ID ~"'"~~· •r ~~~"~"~"'" f"' C,d DID
Type of Distribution Consolidated: Destinating Date Range of Data: _ .... - ... ~..!:~ .. :201~- to ~.e~g_:?~.~- .... ·~~"""~
PlR Work.hour Costs - Gaining
PIR Workhour Costs ~ Gaining
P\R WorKhour Costs Gaining
PIR Workhour Costs - Gaining
(1)
Operation Numbers
PIR Workhour Costs Ga\ning
(27)NOTES: ________________ ·--------·--------------··------------------------··----------------·---------------·--------··-----------------------------------------------------------
PlR Workhour Costs - Ga·!n-mg
[ -- ~--- -<:5ther Workhour Move Analysis -~
PIR Other Workhour Costs
PIR Other Workhour Costs
PIR Other Work hour Costs
PIR Other Workhour Costs
[ - ----------- --- -~- -~- ----oistribUtionto0t-llerPIRvvork8heetrat>S ---- --- 1
PIR Other Workhour Costs
PIR Other Workhour Costs
Staffing - Craft Last Saved: January 16, 2014
PIR Type: 1st PIR Data Extraction Date: 09/24/13
Losing Facility: Chillicothe CSMPC Finance#: 381575
Craft Positions
Craft Positions
~-----------~------------~ I (23) I (24) I ! 1st PIR vs Pre AMP ! 1st PIR vs Proposed ! Total Craft Position Loss:L ____ !~~----j _____ (2_:!,_ ____ j
(Above numbers are carried forward to the Executive Summary)
PIR Staffing -Craft
Staffing - PCES/EAS
Losing Facility: Chillicothe CSMPC Data Extraction Date: 9/24/2013
PCES/EAS Positions
Position Title
Last Saved: January 16, 2014
PIR Type: 1st PIR
Finance# .;3:.:8..:.15:::;7:..:5~----
PIR Staffing - PCES/EAS
Gaining Facility: Columbus OH P&DC Finance # .::3.:::8.:.17:..:9:.:3:.._ ___ _ Data Extraction Date: 9124/2013
PCES/EAS Positions On-Rolls
r, .. , .. ,_., .. , ........... ,-r, .. , ........ ,_., .. , __ ~--·--·--·--·--·--·--~ I Total PCES/EAS' <37
> ' <38
) '
I Position Lossl 3 I 7 j ~·-·-·-·-·-·-·-·-·~·-·-·-·-·-·---J-·-----·-----~ (Above numbers are carried forward to the Executive Summary)
PIR Staffing - PCES/EAS
Transportation - PVS Last Saved: January 16, 2014
Losing Facility: Chillicothe CSMPC Finance Number: -=3-=8...:.1.:..57'-'5=--------
(4) l (5) Variance 1st Variance 1st
1st PIR I PIR vs Pre PIR vs
(11) Total 1st PIR vs Pre AMP Transportation-PVS Savings: ___ "-'-'--'-'----' (This number added to the Executive Summary
PIR Type: 1st PIR
Date Range of Data: Apr-01-2013 --to Sep-30-2013
Gaining Facility: Columbus OH P&DC Finance Number: 381793 ------------
(8) l (9) l (10) Variance 1st Variance 1st
PIR PIR vs Pre PIR vs
(12) Total 1st PIR vs Proposed Transportation-PVS Savings=-------'-'----'----"-(This number added to the Executive Summary)
(13)Nooos: __________________________________________________________ _
PIR Transportation PVS
(1)
Losing Facility: Chillicothe CSMPC
Type of Distribution Consolidated: Destinating Data of HCR Data File:
(3) (4)
1st PIR Route#
Transportation - HCR Last Saved: January 16, 2014
(6) (7)
1st PIR Annual Cost
PIR Type: 1st PIR
CT for Outbound Dock:
(9) (10)
1st PIR
PIR Transportation HCR- Losing
Change Analysis 1st PIR vs Pre AMP I 1st PIR vs Proposed
Notes:
PIR Transportation HCR - Losing
Gaining Facility: Columbus OH P&DC
Type of Distribution Consolidated: Destinating Date of HCR Data File:
(1)
Route#
(3)
Proposed Annual
(4)
1st PIR Annual
Transportation - HCR Last Saved: January 16, 2014
CET for Inbound Dock:
CET for Cancellations:
(6)
Proposed Annual Cost
(7)
PIR Type: 1st PIR
CETforOGP:
CT for Outbound Dock:
(9)
Proposed Annual
------
(10)
1st PIR Annual Cost/Mile
PIR Transportation HCR -Gaining
Notes:
(11) (12) Change Analysis
1st PIR vs Pre AMP I 1st PIR vs Proposed
Summary HCR Losing & Gaining
Losing Gaining
(13) 1 (14) 1st PIR vs Pre
AMP 1st PIR vs Proposed
$0 $114.449
(13) Total 1st PIR vs Pre AMP Transportation-HeR Savings: (from losing and gaining facilities)
$152,461
(14) Total 1st PIR vs Proposed Transportation-HeR Savings: (from losing and gaining facilities)
Total Transportation
HCR PVS
(15)
1st PIR vs Pre AMP
(15) Total 1st PIR vs Pre AMP Transportation (PVS & HCR): $95,743 (This number carried forward to the Executive Summary)
(16) Total 1st PIR vs Proposed Transportation (PVS & HCR): (This number carried forward to the Executive Summary)
(16)
1st PIR vs Proposed
PIR Transportation HCR- Gaining
Data Extraction Date: -----Losing Facility: Chillicothe CSMPC
(10) Notes:
MPE Inventory Last Saved: January 16, 2014
PIR Type: 1st PIR Date Range of Data: Apr-01-2013 --to-- Sep-30-2013
Gaining Facility: Columbus OH P&DC
(5) (6)
1st PIR
(7) Proposed Relocation
Costs
(8 1st PIR
Relocation Costs
$0 I $0
Space Evaluation and Other Costs
(9)
Variance in Costs
PIR MPE Inventory
I LDC 36
Maintenance Last Saved January 16, 2014
Losing Facility: Chillicothe CSMPC
Mail Processing $
Egui(!ment
Building Equipment $
Building Services $ (Custodial CleanmgJ_
·~
Maintenance Stockroom $ and Supplies
Grand Total
$
$
$
$
$
(2) (3) (4) (5) Variance 1st Variance 1st
Proposed 1st PIR PIR to Pre PIRto Costs Costs AMP Proposed
0 $ 0 0 $ 0
0 $ 70,231 1,369 $ 70,231
141,573 $ 147,462 5.889 $ 5,889
0 $ 0 0 $ 0
0 $ 0 $ 0 $ 0
141,573 $ 217,692 'II>•' 7,258 $ 76,119
25,630
0
167,203
(11) 1st PIR vs Pre AMP- Maintenance Savings:
(12) 1st PIR vs Proposed- Maintenance Savings:
LDC 36
LDC 37
LDC 38
LDC 39
I LDC 93
PIR Type*:_:1..:.st:..:P_:I:_:R _____ _
Date Range of Data: Apr-01-2013 : Sep-30-2013
Gaining Facility: Columbus OH P&DC
(7) (8) (9) Variance 1st
Workhour Activity Proposed 1st PIR PIR to Pre Costs Costs AMP
$ 12,254,802 $ 13,285,213 1,030,411 $
Buildina Eauioment $ $ 3,144,241 $ 3,121,723
t)UIIUIII!:J ..;:)~IV 1\;.t;:::J $ (Custodial Cleaning)
5,515,420 $ 5,558,467 $ 43,047 $
Maintenance Operations - $ 1,242,269 $ 1,140,158
---···-···_::-··:-·:-- $ ':SS$J1,11!"' $ 355,118 $ 798,763 443,645 $
$ 22,511,850 $ 23,904,324 1,392,474 $
PartS and Supplies
Maintenance Stockroom $ 4,369,956 $ 4,372,913
0
Grand Total $ 26,884,763
$871,778 (These numbers carried forward to the Executive Summary)
(These numbers carried forward to the Executive Summary)
(10) Variance 1st
PIR to Pre Proposed
1,030,411
43,047
443,645
1,392,474
(13)Nores: ______________________________________________________________________ ~===========================================
"'Data in PIR columns is annualized for First P!R
PIR Maintenance
(1)
Distribution Changes Last Saved: January 16, 2014
Losing Facility : Chillicothe CSMPC PIR Type: 1st PIR Type of Distribution Consolidated: Destinating Date Range of Data: Apr-01-2013 --to Sep-30-2013
Place a "X" next to the DMM labeling list(s) revised as result of the approved AMP. Identify the date of the Postal Bulletin that contained DMM labeling list revisions.
DMM L001
X DMM L002
DMM L003
DMM L004
X DMM L005
DMM L006
DMM L007
DMM L008
DMM L009
DMM L010
DMM L011
DMM L201
DMM L601
DMM L602
DMM L603
DMM L604
DMM L605
DMM L606
DMM L607
DMM L801
(2)
Was the Service Standard Directory updated for the approved AMP?
<3> Yes
(4) Drop Shipments for Destination Entry Discounts
FAST Appointment Summary Report NASS
Facility Name Total No-Show Late Arrival 0 en Month Losing I Gaining Facility Code Schd Count % Count % Count %
Aug '13 Losing Facility 456 Chillicothe
Sept '13 Losing Facility 456 Chillicothe
Aug '13 Gaining Facility 430 Columbus 813 214 26.32% 228 28.04% 0 0.00%
Sept '13 Gaining Facility 430 Columbus 842 260 30.88% 242 28.74% 0 0.00%
Count
598
582
Closed %
73.55%
69.12%
(5lNotes: ----------------------------------------------------------------------------------================
Unschd 1 Count
52
85
PIR Distribution Changes
Losing Facility: Chillicothe CSMPC 5-Digit ZIP Code: 45601
Data Extraction Date: -=o~9/"=275t""'173 _____ _
1. Collection Points Number picked up before 1 p.m.
Number picked up between 1-5 p.m. Number picked up after 5 p.m.
Total Number of Collection Points
Customer Service Issues Last Saved January 16, 2014
2. How many collection boxes are currently designated for "local delivery"?
3. How many "local delivery" boxes were removed as a result of AMP?
4. Delivery Performance Report
% Carriers returning after 1700
5. Retail Unit Inside Losing Facility (Window Service Times) 6. Business (Bulk) Mail Acceptance Hours
7. Can customers obtain a local postmark in accordance with applicable policies in the Postal Operations Manual? Yes
8. Notes:
Gaining Facility: Columbus OH P&DC
9. What postmark is printed on collection mail? I --- --]
PIR Customer Service Issues
Space Evaluation and Other Costs Last Saved January 16, 2014
Losing Facility: Chillicothe CSMPC Date: ________ _
1. Affected Facility
2. One-Time Costs
Enter any one-time costs: __ ...:::;$0::,_ __ $0 $0
3. Savings Information
Space Savings ($): __ ..;$;;.;0;.._ __
4. Did you utilize the acquired space as planned? Explain.
5. Notes:
Employee Relocation Costs
Mail Processing Equipment Relocation Costs (from MPE Inventory)
Facility Costs (from above)
Total One-Time Costs
$16,120
$16,120
(These numbers shown below under One-Time Costs section.)
$0 $0 (These numbers carried forward to the Executive Summary)
($16, 120)
$0
$0 ($16, 120) PlR costs carried fo!Ward to Executive Summary)
Losing Facility: Chillicothe CSMPC
Pre-AMP: FY 2011 Range of Report
Gaining Facility: Columbus OH P&DC
PIR: FY 2013
1st PIR Cost per 1 ,000 Images
PIR Space Evaluation and Other Costs