EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment

Post on 22-Feb-2016

27 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment. HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM. DESIGNERS FABRICATION Stephanie Worthington -Lead Larry Munk Danovic Spell SUPPORT GROUPS - PowerPoint PPT Presentation

Transcript

EXPERIMENTAL BEAM TRANSPORT:g2P / geP Experiment

HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM

DESIGNERS FABRICATION • Stephanie Worthington -Lead Larry Munk• Danovic Spell SUPPORT GROUPS• Bruce Reinhart HALL A coordinator’s Team ENGINEERS Accelerator: Installation• L. A. Dillon-Townes Alignment• Marie Ivanco Vacuum• Shirley Yang Electrical Groups

CURRENT BEAMLINE CONFIGURATION

g2P/geP BEAMLINE CONFIGURATION

REGION 1 REGION 2 REGION 3REGION 4

REGION 5

EP Superharp Girder

PIVOT

TargetPivot

87.693 cm

FZ1 & FZ2

CalorimeterSlow Raster

REGION 1

SLOW RASTER/CALORIMETER SUPPORT

REGION 2 & REGION 3

UPSIDE DOWN GIRDER

FZ1 MAGNET STAND

LEAK CHECKING of 12” BELLOWS

CURRENT STATUS• Preparing FZ2 Telescoping Stand for procurement• Finalizing FZ2 movement mechanism• Refurbish existing Slow Raster Power Supply Shielding

Box• Finalize Harp Flag design and wiring fixture• Resolve Support for AI magnet

top related