EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment
Feb 22, 2016
EXPERIMENTAL BEAM TRANSPORT:g2P / geP Experiment
HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM
DESIGNERS FABRICATION • Stephanie Worthington -Lead Larry Munk• Danovic Spell SUPPORT GROUPS• Bruce Reinhart HALL A coordinator’s Team ENGINEERS Accelerator: Installation• L. A. Dillon-Townes Alignment• Marie Ivanco Vacuum• Shirley Yang Electrical Groups
CURRENT BEAMLINE CONFIGURATION
g2P/geP BEAMLINE CONFIGURATION
REGION 1 REGION 2 REGION 3REGION 4
REGION 5
EP Superharp Girder
PIVOT
TargetPivot
87.693 cm
FZ1 & FZ2
CalorimeterSlow Raster
REGION 1
SLOW RASTER/CALORIMETER SUPPORT
REGION 2 & REGION 3
UPSIDE DOWN GIRDER
FZ1 MAGNET STAND
LEAK CHECKING of 12” BELLOWS
CURRENT STATUS• Preparing FZ2 Telescoping Stand for procurement• Finalizing FZ2 movement mechanism• Refurbish existing Slow Raster Power Supply Shielding
Box• Finalize Harp Flag design and wiring fixture• Resolve Support for AI magnet