Digital Exam Management 2€¦ · • Result Processing Completely Secured 12 and unbiased process throughout the operational levels of printing, scanning and marking 09 *D- Day of
Post on 11-Aug-2020
0 Views
Preview:
Transcript
TCS Confidential
NOVEMBER 2019
Powered by TCS iON
Digital Exam Management 2.0
TCS Confidential
To Elevate University Brand Value (NIRF Ranking / IoE Status)
To Delight Stakeholders (Students, Faculty, Parents & University Administrators)
To bring 100% Transparency in Exam Process
To achieve Zero Malpractices throughout the exam process
To Publish Results - “On Time Every Time”5
1
43
2
Key Imperatives for a University
TCS Confidential
Professor creates Question Paper
Question Paper Management
Reviewed by SME*
QP* & AB* Printing
& Packing
QP & AB Delivery to exam centres
Result
Processing
Post Examination Activities
Re-Evaluation, Re-Totalling to prevent
errors
Absentee Punching
Evaluate ABs manually
End-to-End Exam Cycle of 6 months - from Designing QP to Declaring Results*QP- Question PaperAB- Answer BooksSME*- Subject Matter Expert
What is the current / standard semester exam process
Center Booking & Seat Arrangement
Conduct of Examination
Supervisor/Invigilator
Deployment
Conduct of Examination
Packing & Tnf of ABs, and other Test
Materials
• Cycle time from QP creation to QP Printing & Distribution is 2-3 months
• Exam conduct time frame is typically 1 – 1.5 months
• Time taken for evaluation & result processing is nearly 2 months
Question Bank Creation*
Question Paper Management
Rule Based QP Template Creation
QP Generation & Proof Reading
AB Delivery to exam centres
Result
Processing
Post Examination Activities
Reverse Logistics of ABs to University
Evaluate ABs
Digitally
QP Download @ Centre
Conduct of Examination
QP Printing & Distribution @ Centre
Digital
Identification Management
Scanning of ABs @ Centre
• Cycle time from QP generation is 1-2 weeks (excluding initial Question bank creation timeline)
• Exam conduct time frame is typically 1 – 1.5 months
Declare Results • Time taken for evaluation & result processing is nearly 1 months
End-to-End Exam Cycle of 2-3 months – reduction by 50%
What is the re-imagined semester exam process
TCS Confidential
1. Content Authoring
Engine• Question Bank Management• Question Paper Generation• QP Encryption & Upload
4. TCS iON PAPER Apps
• QP Download• QP Decryption• QP Printing• Attendance Capture• Answer Books Scanning
5. TCS iON Digital
Marking
• Digital Marking• Marker`s Hub• Command Centre
• TCS iON PAPER Devices• Answer Books Scanning
System
2. Exam Management• Student Enrollment• Exam Fee Collections• Scheduling & HT Management• Result Processing
End to End Integrated Managed Services
3. Hardware Devices
• Dedicated Project
organization in line with
University CoE
Organization
• Trained People @ exam
Centres
• Well defined exam
process
• Stakeholders Training
o QB Creation
o QP Generation
o AB Scanning
o AB Marking
• Setting Up Strong Room @
Exam Centre
6. Managed Services
University Ownership
• Controller of Examination
& its Organization
• SME for QB Creation & QP
Generation
• Exam Day Teams
• Invigilators & Support Staff
• University Representatives
@ every centre
• Faculties for AB Marking
• Printers, Printing
Consumables &
Photocopying Machines
@ exam centre
TCSiON Ownership
TCS Confidential
TCS iON Digital Exam Management Integrated Solution | Offering Construct
Content Authoring Engine
Question Bank Creation
Rule-Based Question
Paper Generation
Encryption of final
Question Paper (256-bit
encryption)
Question Paper
distribution
Exam Enrollment
Semester Attendance
and Internal Marks
capturing
Exam Fees payment
Enrollment approval
Exam Scheduling
Admit card Generation
Exam Management Question Paper Management
Scan Answer Booklets and
Upload
Evaluation (Marker Hub)
Candidate Score Update
(Marker Hub)
In case of Re-Evaluation,
rule-based decision to go
for Third Marking/ Finalize
Result
Evaluation Management Results Management
• Report Card Generation• Certificate Generation
Aggregation of scores
CGPA/ SGPA processing
Result Publishing
Application for re-
evaluation / re-totalling by
students
Reports and Communication
TCS iON Digital Exam Management Integrated Solution | Process Flow – Pre-Exam
Exam
Enrollment
Exam Fees
payment
Student
Enrolment
Approval
Subjects Creation
Define Question
Creator/
Reviewer
University
Question Bank
Creation and
Review
Subject Matter Experts
Exam Schedule
upload and
Centre Mapping
Hall Ticket
Generation
TCS
Question Paper
Generation
(Rule-based)
Encryption of
final Question
Paper (256-bit
encryption)
University
Student University TCS Subject Matter Experts
TCS iON Digital Exam Management Integrated Solution | Process Flow – Exam Day
Bar Codes Generation for Answer Booklets
University
Scan Copies and Upload
Bar code pasted Answer books mapped against Exam Attendees
TCS
Question Paper Download
Question paper printing
through white listed printers
Question Paper distribution
at center level
Exam Center
Exam Attendance
Logging of Unfair Means Incidents
Exam Center
University TCSExam Center
TCS iON Digital Exam Management Integrated Solution | Process Flow – Post-Exam
Aggregation of scores
Report Card Generation
Certificate Generation
TCS
For Re-Evaluation, rule-based decision to go for Third Marking/ Finalize Result
TCS
Marker Hub Configuration
Upload Markers data defined by University
TCS
Result / GPA processing
Online Result Publishing
TCS
Evaluation
Candidate Score Update
Evaluator
StudentTCS Evaluator
Students can apply for –
Photocopy of Answer Books
Re-Totaling
Re-Evaluation
Student
Infrastructure People Experience Innovations
230+ TCS iON
Digital Zones –
Nation Wide
3000+ TCS Trained
Associates
15,000+ TCS iON
PAPER Devices
105 Patents filed
Invested over 600
person years on
development
Proven
Implementation
in ICAI, KNU,
NMIMS, FMU
Devices
We can do it for you…
TCS Confidential
Education Boards and
Universities
TISSSAASTRA University
NLUCBSE Bundelkhand University
NIGRIHMS
Top Medical
Entrance AssessmentsAIIMS JIPMER CMC, LudhianaCOMEDK Tata Memorial
CenterCMC, Vellore
Top Engineering
Entrance AssessmentsIIT
BombayIIT
DelhiIIT
GuwahatiIIT
KharagpurIIT
KanpurIIT
MadrasIIT
RoorkeeIISc
BangaloreNIT
Silchar
TCS iON | Conducting 90% of High-Stake Assessment in India
State Departments
and Recruitment BodiesUP JAL NIGAM
DoITC, HPUPRVUNL WBSSCGETCOAHCIBPSRailway Recruitment Board
MPPEB CGVYAPAM
JIPMER
TCS Confidential
TCS iON | Empowering Institutions to Conduct Assessment Globally
CBSE JEE
9 Countries
EDCIL
2 CountriesGATE
7 Countries
IBPS
26 Countries
IIT B - UCEED
2 Countries
NATA
2 CountriesNTE – JEE Mains
9 Countries
MRCPI
8 Countries
JEE Advanced
6 Countries
Expand the Reach | Cross Boundaries | Overcome Constraints
with
TCS Confidential
Intelligent
Automated Rule-
Based Question paper creation from
Question Bank
01Elimination of
Forward Logistics for Question Papers
02Question Paper printed
securely at the exam
centre on the day of
Exam, thereby reducing
security risk
03Capturing of
Attendance
digitally thereby
eliminating chances
of impersonation
04
On premise scanningof Answer sheets on
the day of exam
thereby allowing
evaluation process
from D+1.
05Evaluate Digitally
thereby eliminating
manual errors and
rework in marking.
06Controlling the quality of
marking by seeding,
benchmarking, double
marking and review processes.
08Elimination of
Reverse Logistics for Answer sheets
07
Real time Dashboard providing insight into
the progress in marking and
performance of the markers
10 End-to-end integrated
Managed service• Exam Management
• QP Management
• AB Marking
• Result Processing
12Completely Secured
and unbiased process throughout the
operational levels of printing, scanning
and marking
09
*D- Day of the Exam
100% Process
transparency through Command Center
monitoring
11
Become the pioneer to bring in complete digital transformation in the examination process
Benefits of re-imagination
TCS Confidential
Let`s Transform
Education Through
Technology
TM
TCS Confidential
top related