AUGUST 12, 2015

Liberty High School Tennis courts now complete.

Liberty High School Turf replacement complete. New LED light poles and lights installed.

Pouring footing and piers for new grandstands.

Skyline High School Grandstand Erection of steel framework moving quickly.

Skyline High School Grandstand Close-up of grandstand seating area.

Skyline High School Grandstand View from current home stands on eastside.

Skyline High School Grandstand Overall view of grandstands with columns.

Skyline High School Grandstand Existing home stands.

Maywood Middle School Lower level, 6 classrooms added in previously unfinished area. Main corridor needs final trim ceiling tiles and floor coverings to complete.

Maywood Middle School Classroom ready for cabinet install Friday.

Briarwood Elementary New portable showing the new code required second exit from each

classroom.

Issaquah Middle School Aerial view of site.

Issaquah Middle School Overall view of site from upper playfield.

Issaquah Middle School View from gym slab north to classroom wing.

Issaquah Middle School Nearly ready for music rooms slab pour.

Issaquah Middle School Steel frame at north end of classroom wing topped out at roof level.

Issaquah Middle School Erecting steel frame.

Clark Elementary New portable and sand playfield area.

Clark Elementary Hard play area with soft play area to rear.

Clark Elementary Second new portable building.

Clark Elementary Area east of Clark cleared to provide additional parking, revised

parent drop-off, return to usual bus drop-off along the front of the building and provide area for a sand play area.

Transportation Center Area of new entrance and additional bus and staff car parking.

Transportation Center Area of new entrance and additional bus and staff car parking.

Issaquah High School Two new portable buildings for a total of 8 classrooms.

Issaquah High School Turf infield work underway at the girls softball field (Liberty to follow).

Sunny Hills Elementary School Overall view from hard play area.

Sunny Hills Elementary School Overall view, north area towards bus loop and entrance.

Sunny Hills Elementary School West classroom wing.

Sunny Hills Elementary School Beehive of activity, something happening in all areas of the site.

Sunny Hills Elementary School East classroom wing footings poured working on stem walls.

Sunny Hills Elementary School New interim parking lot and access to parent drop-off.

Sunny Hills Elementary School Interim bus loop and staff parking.