AUGUST 12, 2015

Page 2: AUGUST 12, 2015 - issaquah.wednet.edu

Liberty High School Tennis courts now complete.

Page 3: AUGUST 12, 2015 - issaquah.wednet.edu

Liberty High School Turf replacement complete. New LED light poles and lights installed.

Pouring footing and piers for new grandstands.

Page 4: AUGUST 12, 2015 - issaquah.wednet.edu

Skyline High School Grandstand Erection of steel framework moving quickly.

Page 5: AUGUST 12, 2015 - issaquah.wednet.edu

Skyline High School Grandstand Close-up of grandstand seating area.

Page 6: AUGUST 12, 2015 - issaquah.wednet.edu

Skyline High School Grandstand View from current home stands on eastside.

Page 7: AUGUST 12, 2015 - issaquah.wednet.edu

Skyline High School Grandstand Overall view of grandstands with columns.

Page 8: AUGUST 12, 2015 - issaquah.wednet.edu

Skyline High School Grandstand Existing home stands.

Page 9: AUGUST 12, 2015 - issaquah.wednet.edu

Maywood Middle School Lower level, 6 classrooms added in previously unfinished area. Main corridor needs final trim ceiling tiles and floor coverings to complete.

Page 10: AUGUST 12, 2015 - issaquah.wednet.edu

Maywood Middle School Classroom ready for cabinet install Friday.

Page 11: AUGUST 12, 2015 - issaquah.wednet.edu

Briarwood Elementary New portable showing the new code required second exit from each

classroom.

Page 12: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah Middle School Aerial view of site.

Page 13: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah Middle School Overall view of site from upper playfield.

Page 14: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah Middle School View from gym slab north to classroom wing.

Page 15: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah Middle School Nearly ready for music rooms slab pour.

Page 16: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah Middle School Steel frame at north end of classroom wing topped out at roof level.

Page 17: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah Middle School Erecting steel frame.

Page 18: AUGUST 12, 2015 - issaquah.wednet.edu

Clark Elementary New portable and sand playfield area.

Page 19: AUGUST 12, 2015 - issaquah.wednet.edu

Clark Elementary Hard play area with soft play area to rear.

Page 20: AUGUST 12, 2015 - issaquah.wednet.edu

Clark Elementary Second new portable building.

Page 21: AUGUST 12, 2015 - issaquah.wednet.edu

Clark Elementary Area east of Clark cleared to provide additional parking, revised

parent drop-off, return to usual bus drop-off along the front of the building and provide area for a sand play area.

Page 22: AUGUST 12, 2015 - issaquah.wednet.edu

Transportation Center Area of new entrance and additional bus and staff car parking.

Page 23: AUGUST 12, 2015 - issaquah.wednet.edu

Transportation Center Area of new entrance and additional bus and staff car parking.

Page 24: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah High School Two new portable buildings for a total of 8 classrooms.

Page 25: AUGUST 12, 2015 - issaquah.wednet.edu

Issaquah High School Turf infield work underway at the girls softball field (Liberty to follow).

Page 26: AUGUST 12, 2015 - issaquah.wednet.edu

Sunny Hills Elementary School Overall view from hard play area.

Page 27: AUGUST 12, 2015 - issaquah.wednet.edu

Sunny Hills Elementary School Overall view, north area towards bus loop and entrance.

Page 28: AUGUST 12, 2015 - issaquah.wednet.edu

Sunny Hills Elementary School West classroom wing.

Page 29: AUGUST 12, 2015 - issaquah.wednet.edu

Sunny Hills Elementary School Beehive of activity, something happening in all areas of the site.

Page 30: AUGUST 12, 2015 - issaquah.wednet.edu

Sunny Hills Elementary School East classroom wing footings poured working on stem walls.

Page 31: AUGUST 12, 2015 - issaquah.wednet.edu

Sunny Hills Elementary School New interim parking lot and access to parent drop-off.

Page 32: AUGUST 12, 2015 - issaquah.wednet.edu

Sunny Hills Elementary School Interim bus loop and staff parking.