Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-1

ANNEXURE K : STOCHASTIC STREAMFLOW TESTS

K.1. STOCHASTIC TESTS AT THE PROPOSED NGOAJANE DAM SITE ........................................ 2 K.2. STOCHASTIC TESTS AT THE PROPOSED NGOAJANE ABSTRACTION SITE ............................ 6 K.3. STOCHASTIC TESTS AT THE PROPOSED HLOTSE DAM SITE .......................................... 10 K.4. STOCHASTIC TESTS AT THE PROPOSED HLOTSE ABSTRACTION SITE .............................. 14 K.5. STOCHASTIC TESTS AT THE PROPOSED MAKHALENG DAM SITE .................................... 18 K.6. STOCHASTIC TESTS AT THE PROPOSED MAKHALENG ABSTRACTION SITE ........................ 22

K.1.

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

STOCHASTIC TESTS AT THE PROPOSED NGOAJANE DAM SITE

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-2

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-3

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-4

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

K.2.

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-5

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

STOCHASTIC TESTS AT THE PROPOSED NGOAJANE ABSTRACTION SITE

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-6

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-7

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-8

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

K.3.

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-9

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

STOCHASTIC TESTS AT THE PROPOSED HLOTSE DAM SITE

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-10

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-11

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-12

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

K.4.

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-13

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

STOCHASTIC TESTS AT THE PROPOSED HLOTSE ABSTRACTION SITE

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-14

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-15

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-16

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

K.5.

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-17

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

STOCHASTIC TESTS AT THE PROPOSED MAKHALENG DAM SITE

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-18

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-19

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-20

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

K.6.

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-21

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

STOCHASTIC TESTS AT THE PROPOSED MAKHALENG ABSTRACTION SITE

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-22

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-23

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-24

Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF

Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-25