Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8 th EDF Parkman Ltd (UK) – Draft Final Report – 18 th June 2004 K-1 ANNEXURE K : STOCHASTIC STREAMFLOW TESTS K.1. STOCHASTIC TESTS AT THE PROPOSED NGOAJANE DAM SITE ........................................ 2 K.2. STOCHASTIC TESTS AT THE PROPOSED NGOAJANE ABSTRACTION SITE ............................ 6 K.3. STOCHASTIC TESTS AT THE PROPOSED HLOTSE DAM SITE .......................................... 10 K.4. STOCHASTIC TESTS AT THE PROPOSED HLOTSE ABSTRACTION SITE .............................. 14 K.5. STOCHASTIC TESTS AT THE PROPOSED MAKHALENG DAM SITE .................................... 18 K.6. STOCHASTIC TESTS AT THE PROPOSED MAKHALENG ABSTRACTION SITE ........................ 22 K.1.
25
Embed
ANNEXURE K : STOCHASTIC STREAMFLOW TESTSwis.orasecom.org/content/study/GIZ/Support to the...Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF STOCHASTIC
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-1
ANNEXURE K : STOCHASTIC STREAMFLOW TESTS
K.1. STOCHASTIC TESTS AT THE PROPOSED NGOAJANE DAM SITE ........................................ 2 K.2. STOCHASTIC TESTS AT THE PROPOSED NGOAJANE ABSTRACTION SITE ............................ 6 K.3. STOCHASTIC TESTS AT THE PROPOSED HLOTSE DAM SITE .......................................... 10 K.4. STOCHASTIC TESTS AT THE PROPOSED HLOTSE ABSTRACTION SITE .............................. 14 K.5. STOCHASTIC TESTS AT THE PROPOSED MAKHALENG DAM SITE .................................... 18 K.6. STOCHASTIC TESTS AT THE PROPOSED MAKHALENG ABSTRACTION SITE ........................ 22
K.1.
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
STOCHASTIC TESTS AT THE PROPOSED NGOAJANE DAM SITE
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-2
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-3
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-4
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
K.2.
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-5
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
STOCHASTIC TESTS AT THE PROPOSED NGOAJANE ABSTRACTION SITE
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-6
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-7
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-8
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
K.3.
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-9
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
STOCHASTIC TESTS AT THE PROPOSED HLOTSE DAM SITE
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-10
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-11
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-12
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
K.4.
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-13
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
STOCHASTIC TESTS AT THE PROPOSED HLOTSE ABSTRACTION SITE
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-14
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-15
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-16
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
K.5.
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-17
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
STOCHASTIC TESTS AT THE PROPOSED MAKHALENG DAM SITE
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-18
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-19
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-20
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
K.6.
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-21
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
STOCHASTIC TESTS AT THE PROPOSED MAKHALENG ABSTRACTION SITE
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-22
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-23
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-24
Lesotho Lowlands Water Supply Scheme – Feasibility Study – Funded by the 8th EDF
Parkman Ltd (UK) – Draft Final Report – 18th June 2004 K-25