Alex Malagelada Professional Portfolio
Post on 23-Mar-2016
232 Views
Preview:
DESCRIPTION
Transcript
917 651 1962amalagelada@gmail.com
PERSONAL DATA
ADDRESS 979 Metropolitan Avenue #3L11211 Brooklyn, USA
Alex Malagelada Prats
INDEX
RESUM 04
PROFESSIONAL WORK 05 .
. GRADUATE WORK 27
PERSONAL WORK 35 .
1290-1300 Decatur Street, Brooklyn, USA 05
269 Washington Avenue & 238 Hall Street, Brooklyn, USA 09
738 Grand Street, Brooklyn, USA 15
145 Spring St Lobby, SoHo, USA 19
31 apartments in the Historical Centre of Mlaga, Spain 21
Extension of Ponferradas Court of Justice, Len (1st Prize) 23
144 apartments in La UVA de Hortaleza, Madrid (1st Prize) 25
27 Thesis Project - Art Center in Gav, Spain (2011)
31 Mutidisciplinary Premises for Young People in el Raval, Barcelona (2007)
33 Conservatory of Music in Sant Pau del Camp, Barcelona (2006)
Hans Christian Andersen Museum, Odense, Denmark (2013) 35
Kokedama Holder Design (2015) 37
02
Portfolio
RSUM
ARCHITECTURE STUDIO: S3 ARCHITECTURE LLC, NEW YORK, USA.Employed Nov 2013 until May 2015.
SD: 42 Broadway Street Day Care, Brooklyn, NY, USA. (Interior Renovation)
Spring St. Lobby., Soho, New York, NY, USA. (Interior Renovation)
DD: 596 Washington Ave., Brooklyn, NY, USA.
CD: 1290-1300 Decatur St., Brooklyn, NY, USA. Cluster file of four Buildings. (+SD+DD +Zoning)
269 Washington Avenue, Brooklyn, NY, USA. LPC approval required. (+DD +Zoning)
238 Hall Street, Brooklyn, NY, USA. LPC approval required. (+DD +Zoning)
738 Grand St., Brooklyn, NY, USA. (+DD)
COLUMBIA UNIVERSITY, GSAPP, NEW YORK. Master of Science degree in Advanced Architectural Design. May 2013.Summer studio - Sam Chermayeff & Johanna Meyer-Grohbrgge / Fall studio - David Benjamin / Spring studio - Toru Hasegawa & Mark Collins.
ENRIQUE BARDAJI Y ASOCIADOS STUDIO, MADRID. Freelance 2011-12. Employed Dec 2010 - Feb 2011 & summer 2004.AC: 31 apartment building in the historical center of Malaga, Spain. (2012)
Park BIT Center Competition in Alaior, Menorca.(2012)
La UVA de Hortaleza Competition in Madrid. 4 9-floor apartment buildings. 1st Prize (2011)
UC: Los Carriles Urban Planning Competition, Alcobendas, Madrid. (2012)
DD: Extension of Ponferradas Court of Justice in Leon, 1st Prize. (2011)
83 premises apartment & office building in Montevideo, Uruguay. (2011)
CD: 75 apartment building in Mostoles, Madrid (2010)
Architectural - Urban Planning viability research & preliminary design of five real estate assets. (2012)
ESCOLA TECNICA SUPERIOR DARQUITECTURA DE BARCELONA (ETSAB, UPC)Masters degree in Architecture. February 2011.
MERC GARCIA I FERRER ARCHITECTURE STUDIO, BARCELONA. From September 2007 to September 2008.CD: MB Medical Center with 8 offices, 2 endoscopy office and a surgery room.
Home for people with psychosis and autism in Barcelona. (Neuro-psychic and Pedagogic Institution)
SD: Old peoples home in Badalona, Spain.
Restaurant and gourmet shop in Gerona, Spain.
PARSONS NEW SCHOOL UNIVERSITY, NEW YORK, USA. Interior Design Summer Course. Grade A.ABACUS, BATH & LONDON, UNITED KINGDOM. High Tech Architecture Summer Course.CARBAN COMPUTER ACADEMY, BARCELONA. Autocad+3DStudio Course. PHILLIPS EXETER ACADEMY, EXETER, NH, USA. Summer Course. Advanced Problem solving, Architecture and Ceramics.
2013
2015
2012
2011
2008
2005 2003 2001 1999
04
Academic & Professional Background
1290-1300 DECATUR STREET, BROOKLYN, USA (2015)
This project was presented to the DOB as a cluster filiing meaning that even though the project was four separate buildings we used the same drawings for all four. Each bulding contains 8 units, with an additional cellar space and outdoor area for the first floor units, an outdoor area for the rear apartment on the second floor, a private terrace for the top two units and a common space at the bulkhead roof.
The facade design plays with the pushing and pulling of the facade elements creating a pattern that seeks to blur the limits between buildings and display them as a single one. The facade is composed by brick, a wood cladding system and aluminium clad windows. These materials were selected to fit in the context as many of the neighboring buildings use the same.
Working on the design and zoning calculations was specially challenging as all buildings had to be the same even though the demising walls thicknesses, some facade elements and penthouse locations varied from one to the other.
S3 Architecture LLCDesign Development & ConstructionDocumentsGROSS FLOOR AREA: 28,861.04 m
Exterior View
05
FLOOR PLAN NOTES
NO. NOTE
1 BUILDING IS FULLY SPRINKLERED, TYP.2 36" H RAIL PER BC1012.1.13 42" H PARAPET PER BC 1012.24 42" H GUARDRAIL PER BC 1012.25 DROP ARCH ABOVE6 6' H PTD STL & WOOD FENCE7 HANDICAPPED ACCESSIBLE UNIT8 APPENDIX A BATHROOM9 APPENDIX P BATHROOM10 MECH. VENT. PER MDL SECT 33, MC 403.311 LOT LINE12 INTERCOM PER MDL 50A & LIGHTING PER
HMC 026-19.0713 RESIDENTIAL RECREATION ROOM WILL
NOT BE USED AS LIVING ROOM OR FORSLEEPING PURPOSES
14 MAILBOXES PER MDL5715 TRASH / STORAGE ROOM COMPLIES
WITH ZR 28-23, BC 1213.1 NYS MDL 81 =27.2021 HOUSING MAINTENANCE CODE
16 ROOF DRAIN, SEE PLUMBING17 YARD DRAIN, SEE PLUMBING18 UNOCCUPIED UNDER STAIR19 STAIRWAY ID. SIGN PER BC 1019.1.7, TYP.20 BLDG COMPLIES W/ BC1704 & BC106.7
SHORING+UNDERPINNING, SEESTRUCTURAL
21 CONC. FOUNDATION WALL, SEESTRUCTURAL
22 NO ACCESS TO REAR YARDS23 CONC. PAVERS24 CONC. SIDEWALK, BPP FILED
SEPARATELY25 CONC. CURB26 FAI(2), SIAMESE CONNECTION, FIRE
ALARM BELL27 FIRE-RATED ENCLOSURE FIRESTOP
SLAB PENETRATIONS28 STAIR COMPLIES WITH BC 1018.2.429 SPIRAL STAIR COMPLIES WITH BC1009.930 CORRIDOR & STAIRWELL MECHANICALLY
VENTILATED31 NONCOMBUSTIBLE PAVEMENT32 CLASS "A" ROOF - FIRESTONE 180 OR
APPROVED EQUAL TORCHED DOWNRUBBER ROOF LOOSE-LAID OVERPOLYSOCYANURATE INSULATION, OROTHER MANUFACTURER ACCEPTABLEINSULATION TYPE SPLICE WITH HIGHSTRENGTH SEAM TYPE, TYP.
33 TERRACE BELOW34 UNOBSTRUCTED PATH FOR FIRE
DEPARTMENT ACCESS35 AS PER 2R 25-811 1 BIKE PARKING SPACE
FOR EVERY 2 DWELLING UNITS. 8 UNITS /2 = 4 BIKE SPACES PROVIDED
36 MTL ACCESS LADDER37 MECHANICAL VENTILATION37 PLANTED AREA38 BLDG COMPLIES N BC1704.2.4, SEE
BORINGS REPORT39 PER PC 106.6, SEE DEP ENDORSED SITE
CONNECTION APPLICATION40 TYPE B KITCHENETTE COUNTERS &
APPLIANCES COMPLY W/ BC1107.2.341 TERRACE COMPLIES W/ TPPN 03/0442 PORCH + STAIR COMPLY WITH TPPN
03/0443 BLDG IS FULLY SPRINKLERED, TYP.43 KITCHENETTE PROVIDED W/ NATURAL
VENT. PER BC1203.4.1.4.2, EXCEPTION1203.4.1.2.4, >30' DISTANCE
44 BLDG COMPLIES N BC1614+TPPN 17/95,EARTHQUAKE SEPARATION
45 STRUCTURAL CMU PARTY WALLCOMPLIES W BC705, FIRE WALLS
47 3'8" PER BC 1008.1.5
DN
UP
DN
TRAVELDISTANCE
13' - 6 1/2" OK
A-200
A-202
A-2011
1
1
178 SFLIVING ROOM
149 SFBEDROOM
CL
LAUNDRY
CL
BATHROOMBATHROOM
CL
CL
LAUNDRY
178 SFLIVING ROOM
149 SFBEDROOM
CORRIDOR
STAIR A
BA
25 SFPORCH
5'-
2"
55 SFKITCHENETTE
55 SFKITCHENETTE
2ND FLOOR11' - 3"
R@0' - 7 1/2"
18
R@0' - 8"
17
UNIT 2A523 SF
UNIT 2B523 SF
3'-
0"
12' - 0"5' - 0"
W7R
W9R
13'-
11/
2"10
'-
11/
4"9' - 0"10' - 5 1/4" 19' - 5 1/2"
13'-
11/
2"10
'-
11/
4"
14' - 9 1/2"3' - 0"
2'-
9"7'
-0
1/4"
D24LD34
D36A
D48CD48C
D36A
D36B
D48C
D24LD34
D32B D32B
D48C
14' - 3 3/4"3' - 0"14' - 9 1/2"
2'-
9"
3'-
0"
14' - 3 3/4"
3'-
8"
8'-
3"
4'-
101/
2"8'
-3"
7'-
11"
3' - 9 1/4" 2' - 0" 2' - 0"
4'-
101/
2"
1A-301
2A-301
5D
2
1
1
3
3
4
4
5D5A
4B4C
5B5A
6
6
6
6
6A
7A
7A
7A
7
77
7A
7A
7A
7
7 7
6
4
77
7
6 6
0'-
8"6'
-10
"4'
-9
1/2"
8'-
91/
2"4'
-2"
50 CFM
10
50 CFM
10
99
1
28
2
2
4
1
4
4
23
11
100' - 0" LOT
53' - 7" BLDG
19
S/CM
S/CM
S/CM
S/CM
SD
ICM ICM
EXIT
3' - 9"
6'-
0"
4
R@0' - 7 1/2"
18
25'-
3"LO
T
APPENDIX P APPENDIX P
37
EL. 72.24' FF
43 43
STAIR
42
45
4B
< 0'- 7
"
5' - 9" 5' - 9"
3' - 0"3' - 0"7'
-0
1/4"
4'-
101/
2"
4C
6
3'-
71/
4"6'
-10
"4'
-9
3/4"
8'-
10"
1'-
03/
4" 0'-
11/
4"
100' - 0" LOT
7
3' - 0"
3'-
0"
DN
DN
DN
UP
UP
TRAVELDISTANCE
33' - 10 3/4" OK
A-200
A-202
A-2011
1
1
200 SF
LIVING /SLEEPING
CL
CL
114 SFBEDROOM
CLSTAIR
BATHROOM
150 SFLIVING ROOM
CL
133 SFCORRIDOR
STAIR A
BA
2
'
-
1
0
"
32 SFKITCHENETTE
63 SFKITCHENETTE
FIRST FLOOR0' - 0"VESTIBULE
STAIR
R@0' - 7 1/2"
16
R@0' - 7 1/2"
18
R@0' - 8"
15
R@0' - 8"
15
UNIT 1B490 SF / 254 SF
744 SF
UNIT 1A433 SF / 311 SF
744 SF
8' - 0"
W3
W5
W6
W4
3
'
-
6
"
D36F D36F
11' - 1"7' - 0"
D36B
D36B
17' - 0"
R@0' - 8"
17
1A-301
2A-301
4B
5A
1
3
1
5F
3
4
4
4C
5E
66
5D
4B
14
2
2
2
7
5
1' - 9 1/4"
12
ICM
ICM
ICM
11
11
4
4
4
11
0
'
-
7
1
/
4
"
9
'
-
1
0
"
4
'
-
9
3
/
4
"
5
'
-
1
0
"
4
'
-
0
3
/
4
"
0
'
-
1
1
/
4
"
89
100 CFM
50 CFM
50 CFM
YD
YD
17
1
E
X
I
T 19
SD
8' - 0"53' - 7" BLDG15' - 3"100' - 0" LOT
2
5
'
-
3
"
L
O
T
24
25
26 27S/CM
S/CM
S/CM
S/CM
S/CM
28
10
10
10
1 7
0
'
-
7
1
/
2
"
4
'
-
1
0
"
2
'
-
0
3
/
4
"
2
'
-
1
1
"
4
'
-
9
1
/
4
"
8
'
-
9
"
1
'
-
3
1
/
2
"
OPEN TOBELOW
4
1
'
-
6
"
STAIR
BATHROOM
3' - 0"
APPENDIX P
TYPE A
37
3
'
-
0
"
5
'
-
1
"
EXIT
3' - 8"
3' - 8"
24'-
1"
10'-
61/
2"
8' - 6" 9' - 7 1/2"
EL. 60.99' FF
D36AD24C
D34B
D34
D48C
D24CD34B
4
6
8' - 0"
STAIR
38
EL. 60.99'
40
43
44
45
42
18'-
11/
4"
11' - 4 3/4" 2' - 4"
6'-
81/
2"2'
-0"
2' - 4" 9' - 6" 6' - 0"
7'-
91/
2"
2' - 2" 8' - 4" 10' - 0"
2'-
111/
2"
4
5'-
3"16
'-
11/
4"3'
-10
3/4"
13' - 4"
6
3' - 4"4' - 6 1/2"
3'-
10"
4'-
4"
12' - 0 3/4" 6' - 1 1/4"D36A
1'-
10"
2'-
0"8'
-11
1/2"
6' - 6" 11' - 6"
3'-
83/
4"8'
-11
1/2"
2' - 2"
4'-
33/
4"D48C
77A
7A
4B
4'-
33/
4"
1' - 0" 2'-
4"
1' - 0"
7'-
0"4'
-11
"
3'-
0"
3'-
0"
9' - 11 3/4"10' - 7 1/4" 9' - 4"
6'-
7"
3'-
2"5'
-6
3/4"
9'-
41/
2"
8'-
0"
3'-
0"
3' - 0"
3'-
9"
3' - 0"
1290-1300 DECATUR STREET, BROOKLYN, USA (2015)
First Floor Plan
Second & Third Floor Plan
06
1st Floor0' - 0"
2nd Floor11' - 3"
.Foundation Level-13' - 0"
Cellar Level-10' - 0"
3rd Floor22' - 6"
4th Floor33' - 9"
Penthouse45' - 0"
Roof - Penthouse55' - 0"
1A-300
Roof -Bulkhead64' - 0"
10'-
0"11
'-
3"11
'-
3"11
'-
3"11
'-
3"10
'-
0"9'
-0"
2'-
9"6'
-6"
2'-
0"3'
-6"
5'-
9"2'
-0"
3'-
6"5'
-9"
2'-
0"11
'-
3"4'
-2"
5'-
10"
4'-
2"4'
-10
"0'
-7
1/4"
1' - 3 1/2" 8' - 9" 4' - 9 1/4" 2' - 11" 2' - 0 3/4" 4' - 10" 0' - 7 1/2"
4' - 2" 8' - 9 1/2" 4' - 9 1/2" 7' - 6 1/4"
1' - 2" 8' - 10" 4' - 9 3/4" 6' - 10" 3' - 7"
4' - 2" 8' - 10" 4' - 9" 6' - 10" 0' - 8"
2'-
0"3'
-6"
55'-
0"M
AX.BL
DG.H
EIG
HT
2'-
0"3'
-6"
2'-
0"3'
-6"
21
1
3
4
19
19
19
7 5
13
13
13
13
3
4
1
8
8
D36FW3W4
W7LW8L
W8R
(+ EL. 47.99' )
(+ EL. 50.99' )
(+ EL. 60.99' )
(+ EL. 72.24' )
(+ EL. 83.49' )
(+ EL. 94.74' )
(+ EL. 105.99' )
(+ EL. 115.99' )
(+ EL. 124.99' )
14
2A-202
A-2002
10'-
0"2'
-9"
6'-
6"11
'-
3"2'
-0"
3'-
4"5'
-11
"2'
-0"
11'-
3"10
'-
0"1'
-7
1/4"
0'-
71/
4"
14
3rd Floor22' - 6"
4th Floor33' - 9"
Penthouse45' - 0"
0' - 5 1/4"8' - 10"0' - 5 1/4"3' - 8 1/2"
0' - 5 1/4"8' - 10"0' - 5 1/4"0' - 8 3/4" W8L
W8R
1/4" = 1'-0"2North Balcony Elevation
1st Floor0' - 0"
2nd Floor11' - 3"
.Foundation Level-13' - 0"
Cellar Level-10' - 0"
3rd Floor22' - 6"
4th Floor33' - 9"
Penthouse45' - 0"
Roof - Penthouse55' - 0"
1A-300
Roof -Bulkhead64' - 0"
9'-
0"10
'-
0"11
'-
3"11
'-
3"11
'-
3"11
'-
3"10
'-
0"
25' - 3"
5' - 10"4' - 9 3/4"9' - 10"0' - 7 1/4"
1' - 2"8' - 10"4' - 9 3/4"6' - 10"3' - 7 1/4"
4' - 2"8' - 10"4' - 9"6' - 10"0' - 8 1/4"
3'-
6"2'
-0"
6'-
0"
6'-
0"
0'-
71/
4"9'
-0"
10'-
0"11
'-
3"2'
-0
3/4"
5'-
101/
4"3'
-4"
2'-
0"5'
-11
"3'
-4"
2'-
0"9'
-3"
2'-
4"7'
-8"
0'-
71/
4"9'
-0"
10'-
0"11
'-
3"11
'-
3"11
'-
3"2'
-0"
9'-
3"10
'-
0"
55'-
0"M
AX.BL
DG
HEI
GHT
3' - 7 1/4" 6' - 10" 4' - 9 3/4" 8' - 10" 1' - 2"
2 1
8 8
195
4
3
6
13
13
13
13
6
6
3
4
W6 W5
W7R W9R
W9LW7L
W9RW7R
19
19
19
10
(+ EL. 47.99' )
(+ EL. 50.99' )
(+ EL. 60.99' )
(+ EL. 72.24' )
(+ EL. 83.49' )
(+ EL. 94.74' )
(+ EL. 105.99' )
(+ EL. 115.99' )
(+ EL. 124.99' )
15
15
16
17
2A-202
A-2012
1' - 6"
2nd Floor11' - 3"
3rd Floor22' - 6"
4th Floor33' - 9"
Penthouse45' - 0"
0' - 5 1/4" 8' - 10" 0' - 5 1/4"0' - 8 3/4"
0' - 5 1/4" 8' - 10" 0' - 5 1/4"3' - 8 3/4"
0' - 10"0' - 4"4' - 10"4' - 0"W9R
W9L
W9R
1/4" = 1'-0"2South Balcony Elevation
ELEVATION AND SECTION NOTES
ETON.ON
1 BRICK2 THIN BRICK3 PRODEMA CLADDING4 CLAD ALUMINIUM / WOOD WINDOWS AND DOORS5 MTL COPING6 EIFS7 42" PARAPET PER BC1012.28 LOT LINE9 MTL ACCESS LADDER10 6' H PTD STL & WOOD FENCE11 PRECAST CONCRETE PAVERS ON LEVELING PEDESTALS12 MTL FLASHING13 REVEAL14 22" BALCONY15 5' BALCONY16 PORCH17 CONC. WALL, SEE STRUCTURAL19 42" RAILING PER BC1012.220 36" RAILING PER BC1012.1.1
1290-1300 DECATUR STREET, BROOKLYN, USA (2015)
Front and Rear Elevations
07
11
'
-
3
"
1
1
'
-
3
"
1
1
'
-
3
"
1
1
'
-
3
"
1
0
'
-
0
"
4
5
'
-
0
"
5
5
'
-
0
"
2ND FLEL 33'-9"
2ND FLEL 11'-3"
1ST FLEL 0'-0"
3RD FLEL 22'-6"
PH FLEL 45'-0"
PH ROOFEL 55'-0"
CELLAREL -10'-0"
1
0
'
-
0
"
1290-1300 DECATUR STREET, BROOKLYN, USA (2015)
Cross Section - Schematic Design
08
253 257 269 277275
269 WASHINGTON AVENUE & 238 HALL STREET, BROOKLYN, USA (2015)
These two projects are located in a 50x100 through lot, each building facing its own street and both sharing a common backyard. The lot is in a landmarked district and required the Landmarks and Preservation Commission (LPC) approval. Both buildings contain 10 units each, the first floor apartments have an additional space at the cellar and the top apartments have a penthouse room.
As per LPC requirement, the design of the facades required special attention as they had to be integrated in the context using similar materials and design elements to its neighbors such as water tables, headers and sills, shadow lines, and cornices.
Besisdes LPC approval, many aspects of these two projects were very challenging such as the zoning, the construction details, the layouts and the MEP coordination.
I specifically learned a lot working on the construction details as a waterproofing engineer consultant was hired to guide us in our work.
S3 Architecture LLC - Construction Documents + LPC approval269 WASHINGTON AVE. GROSS FLOOR AREA: 12,037.22 m238 HALL ST.GROSS FLOOR AREA: 12,855.07 m
257 Washington Ave. St. Lukes Evangelical Lutheran
Church c.1873
269 Washington Ave.Proposed Building
277 Washington Ave. The Francine Tower c.1925
257 Washington Ave. Henry McCoun House c.1873
253 Washington Ave. c.1928
269 Washington Ave. Elevation in Neighboring Context
269 Washington Ave. Exterior View
09
123 222
161
227
215 122
232
286
250
412
487
478
481
484
475
280
283
Willoughby Avenue
Hall StreetDeKalb A
venue
Lafayette Avenue
Greene Avenue
Washington A
venueWaverly A
venue
Clinton A
venue
Vanderbilt A
venue
St
Gates Avenue
Fulton Stree
234
219
128
135
446
421 84
8569
156
363
67
9
216A
245
295
318
Clifton Place
Cam
bridge Place
Grand A
venue
. James Place
Dow
ning Street
t Putn
NN
Sanborn Map from 1887
NN
Sanborn Map from 1904
269 WASHINGTON AVENUE & 238 HALL STREET, BROOKLYN, USA (2015)
238 Hall St. Elevation in Neighboring Context
246 Washington Ave. Carriage House of Henry McCoun
House c.1873
238 Hall St.Proposed Building
257 Washington Ave. St. Lukes Parish House c.1924
277 Washington Ave. The Francine Tower c.1925
Sanborn Map from 1904
Sanborn Map from 1887
238 Hall St. Exterior View
Historic District Boundaries
10
Fr
o
n
t
Y
a
r
d
S
i
d
e
w
a
l
k
y
n
o
c
l
a
B
y
n
o
c
l
a
B
Unit 3B
Unit 3A
B
a
l
c
o
n
y
Unit 4A
Unit 4B
Terrace
Roof Terrace
RoofUnit 4A
Unit 2A
Unit 2A
Unit 1C
Unit 1A
Lot Lines Lot Lines
W
a
s
h
i
n
g
t
o
n
A
v
e
n
u
e
R
e
a
r
Y
a
r
d
Unit 1B
Unit 1C
Unit 1AUnit 1B
Unit 3C
269 WASHINGTON AVENUE & 238 HALL STREET, BROOKLYN, USA (2015)
269 Washington Ave. Plans
Cellar Floor Plan
Third Floor Plan
First Floor Plan
Fourth Floor Plan Penthouse Floor Plan
Second Floor Plan
Penthouse Roof Floor Plan
11
Unit 3B
Unit 3A
y
n
o
c
l
a
B
y
n
o
c
l
a
B
Unit 4C
Unit 4A
Unit 4By
n
o
c
l
a
B
y
n
o
c
l
a
B
Unit 4C
Unit 4A
ecarreT fooRecarreTTerrace
Unit 4B
Unit 2A
Unit 2B
Lot Lines
Unit 1AUnit 1B
Unit 1C
S
i
d
e
w
a
l
k
H
a
l
l
S
t
r
e
e
t
R
e
a
r
Y
a
r
d
Unit 1AUnit 1B
Unit 1C
269 WASHINGTON AVENUE & 238 HALL STREET, BROOKLYN, USA (2015)
Cellar Floor Plan
Third Floor Plan
First Floor Plan
Fourth Floor Plan Penthouse Floor Plan
Second Floor Plan
Penthouse Roof Floor Plan
238 Hall St. Plans
12
269 WASHINGTON AVENUE & 238 HALL STREET, BROOKLYN, USA (2015)
269 Washington Ave. & 238 Hall St. Exteriror Details
13
269 WASHINGTON AVENUE & 238 HALL STREET, BROOKLYN, USA (2015)
269 Washington Ave. & 238 Hall St. Exteriror Details
14
8'
-
2
1 2
"
3'-61 2"
5
'
-
1
0
"
1
'
-
6
"
1
'
-
6
"
CORRIDOR
EXIT
3'-3"
3
'
-
0
"
5'-10"
4'-5"
5'-912"
3'-10"
TRASH ROOM24 SF
TRAVELDISTANCE
6'-0" OK
CHASE
10
9
2
4
'
-
1
0
"
B
L
D
G
4
'
-
0
1 2
"
30'-812" 15'-10"
14'-112" 2'-5" 48'-512"
4
'
-
4
"
6
'
-
6
"
2
'
-
7
"
1
1
'
-
9
1 2
"
1
2
'
-
4
1 2
"
8
"
3A1 BDRM
522 SF
BEDROOM
LIVINGROOM
LIVINGROOM
KITCHENETTE30 SF
1
2
'
-
4
1 2
"
1
0
'
-
2
"
6
'
-
0
"
10'-712" 7'-9" 2'-4" 2'-4"
3
'
-
4
"
1
0
'
-
6
1 2
"
7
'
-
3
"
1
1
'
-
6
"
14'-3"
3
'
-
1
0
"
4'-412"
CLLDRY
S/CM
S/CM
2
'
-
7
"
9
'
-
2
"
4
'
-
4
1 2
"
D34D34 D24C
W7
D24
65'-0" 35'-0"100'-0" LOT
BUILDING ISFULLY SPRINKLERED,
TYP.
BUILDING ISFULLY SPRINKLERED,
TYP.
W1
W342" H GUARDRAIL
PER BC 1012.2
CONCRETEPAVING OR
SIMILAR
APPENDIX PBATHROOM
UPDN
ADJACENT BUILDING750 GRAND STREET
2
5
'
-
0
"
L
O
T
EASEMENTAGREEMENT WITH750 GRAND ST.ACCEPTED ON NOV4TH, 1998
COMPLIES WITH ZR 28-23,BC 1213.1 NYS MDL 81 = 27.2021HOUSING MAINTENANCE CODE
4
"
4
'
-
2
"
18'-512"
LOT L
5A201
1A200
4A201
16'-512"
42" H GUARDRAILPER BC 1012.2
CONCRETEPAVING ORSIMILAR
5'-0"
9
'
-
2
"
5
'
-
7
"
2
'
-
1
1
"
2
"
4
'
-
6
"
W21
A3041
W18
16'-312"
KITCHENETTE63 SF
4
'
-
9
1 2
"
7
'
-
5
1 2
"
8'-712"7
'
-
4
"
4A401
CHASE
1'-5"SHLVS
6
1 2
"
UP 16R @ 7 516"
DN 16R @ 7 516"
1A301
1A300
2A300
1A302
3A300
5'-912"
1
1
'
-
1
"
7
'
-
9
"
2
'
-
1
0
1 2
"
2'-0"
4
'
-
1
0
1 2
"
2
'
-
6
"
BEDROOMAPPENDIX PBATHROOM
CL
LDRY
2'-4"
S/CMS/CM
10'-1112"
CL
12A
12B
D34D34
1
0
'
-
8
1 2
"
ELEVATOR
8'-8" 7'-0"
3'-0" 1'-0" 3'-0"
42" H GUARDRAILPER BC 1012.2
3
'
-
4
"
6
'
-
1
0
"
5
'
-
0
"
2
'
-
1
1 2
"
5
'
-
9
1 2
"
1
'
-
0
"
3BBALCONY
46 SF
3ABALCONY
23 SF
LOT LINE WINDOW COMPLIES W/ BC704.12 OPENING PROTECTION,TEMPERED GLASS, AUTOMATIC SPRINKLER PROVIDED PER BC 903.2.7,DOES NOT COUNT FOR LIGHT & VENTILATION CALC'S
65'-0"
5
'
-
2
1 2
"
CLOSET
8'-1012"
CL2'-4"
2
'
-
1
1 2
"
3B1 BDRM
529 SF
AB
E
F
4
'
-
7
1 2
"
6
'
-
9
7 8
"
8
"
4
'
-
0
"
7
'
-
1
0
"
1 2 3 4 5 610'-034" 15'-618" 9'-4" 7'-8" 16'-0" 4'-834"
C
D
5A
65'-0"
14'-112" 2'-5" 48'-512"
2
4
'
-
1
0
"
B
L
D
G
4
'
-
0
1 2
"
6
'
-
6
"
2
'
-
7
"
5
'
-
7
"
LIVINGROOM
KITCHENETTE30 SF
1
7
'
-
9
"
7
'
-
3
1 2
"
W7
6
'
-
1
"
2
"
65'-0" 35'-0"100'-0" LOT
BUILDING ISFULLY SPRINKLERED,
TYP.
BUILDING ISFULLY SPRINKLERED,
TYP.
W1
W342" H GUARDRAIL
PER BC 1012.2
CONCRETEPAVING OR
SIMILAR
UPDN
ADJACENT BUILDING750 GRAND STREET
2
5
'
-
0
"
L
O
T
NO FLOORSLAB
EASEMENTAGREEMENT WITH750 GRAND ST.ACCEPTED ON NOV4TH, 1998
COMPLIES WITH ZR 28-23,BC 1213.1 NYS MDL 81 = 27.2021HOUSING MAINTENANCE CODE
LOT L
33'-8"
W21
5A201
1A200
4A201
W9A
4
'
-
1
"
42" H GUARDRAILPER BC 1012.2
CONCRETEPAVING ORSIMILAR
5'-0"
9
'
-
2
"
19'-5"
15'-8"
KITCHENETTE63 SF
7
'
-
5
1 2
"
9'-3"
8
'
-
2
1 2
"
5A401
1A301
1A300
2A300
1A302
3A300
1
0
'
-
8
1 2
"
ELEVATOR
8'-8" 7'-0"
3'-0" 1'-0" 3'-0"
42" H GUARDRAILPER BC 1012.2
3
'
-
4
"
6
'
-
1
0
"
31'-4"
4'-8"
9
'
-
4
1 2
"
5'-10"
4
'
-
0
"
1
'
-
4
1 2
"
CORRIDOR
TRASH ROOM23 SF
CHASE
CHASE
1
'
-
6
" EXIT
TRAVELDISTANCE6'-0" OK
1
'
-
6
"
B63D B63D
1
1
'
-
9
1 2
"
1
2
'
-
4
1 2
"
8
"
2
'
-
7
"
9
'
-
2
"
2
'
-
3
1 2
"
5
'
-
0
"
5
'
-
9
1 2
"
9
'
-
2
1 2
"
4BBALCONY
46 SF
4ABALCONY
23 SF
LOT LINE WINDOW COMPLIES W/ BC704.12 OPENING PROTECTION,TEMPERED GLASS, AUTOMATIC SPRINKLER PROVIDED PER BC 903.2.7,DOES NOT COUNT FOR LIGHT & VENTILATION CALC'S
UP 32R @ 7 316"
DN 16R @ 7 516"
5
'
-
3
"
DINING
LDRYBEDROOMLDRY
CL
CL11
'
-
1
"
2
'
-
4
"
9'-6"
2'-312"
6'-612"
2'-6"
S/CMS/CM
12'-112"
3
'
-
8
1 2
"
7
'
-
9
"
2
'
-
7
"
2'-10"2'-4"
APPENDIX PBATHROOM
UP 16R@ 7 516"
36" HHANDRAIL
2
'
-
2
"
8
'
-
4
1 2
"
D24C
D36F
D34
D36F
D34
1
1
'
-
5
1 2
"
CL2'-4"
2
'
-
0
"
4A2 BDRM DUPLEX
587 SF 193 SF 780 SF+ =
4B1 BDRM DUPLEX
470 SF 154 SF 624 SF+ =
2'-8"
1
'
-
3
"
CHASE
2'-612"2'
-
4
"
4
'
-
2
"
AB
E
F
4
'
-
7
1 2
"
6
'
-
9
7 8
"
8
"
4
'
-
0
"
7
'
-
1
0
"
1 2 3 4 5 610'-034" 15'-618" 9'-4" 7'-8" 16'-0" 4'-834"
C
D
11'-312"
CL
5'-912"
1
0
'
-
1
0
"
2'-6" 6'-712"
2
'
-
9
"
2'-4"
UP 16R@ 7 "
APPENDIX PBATHROOM
36" HHANDRAIL
7
'
-
9
"
1
1
'
-
6
"
S/CM
LIVINGROOM
C
H
A
S
E
1
1
'
-
7
1 2
"
13
D24C
5
'
-
0
"
5
"
16
HB
HB
8'-412" 11'-6"
23'-1"
1
6
'
-
9
"
3'-9"
6
'
-
2
1 2
"
5
'
-
0
"
57'-6"
1
3
'
-
2
1 2
"
20'-4"76'-5" BUILDING 23'-7" REAR YARD
2
4
'
-
1
0
"
1
1 2
"
42" H GUARDRAILPER BC 1012.2
9'-6"
19'-912"
6
'
-
8
"
3'-112"19'-012"
3
'
-
3
1 2
"
5'-0" 51'-1"
6
'
-
7
"
D36B
DW1
DW2
W25
100'-0" LOT
42" H STEELGUARDRAIL
6' H STEE& WD FENTYP
TRAVEL DISTANCE39'-5" OK
CONCRETEPAVING OR
SIMILAR
RD
SLOPE TODRAIN,TYP.
SLOPE TODRAIN, TYP.
BUILDING ISFULLY SPRINKLERED,
TYP.
BASE PLANE = 40'-4"SEE 1/Z104
USE GROUP: R2RESIDENTIAL
INTERCOM PER MDL50A & LIGHTING PER
HMC 026-19.07
BUILDING ISFULLY SPRINKLERED,
TYP.
I
C
M
TREE PIT,TYP.,PER ZR28-12, ZR23-03,ZR26-41, AND DOT &DPR TREE PLANTING
STANDARDS 1.SEE BPP & ST
FILINGS
EL. 40.45'
2
4
'
-
1
0
"
B
L
D
G
2
5
'
-
0
"
L
O
T
W8
(2) FAI,SIAMESE
CONNECTION,FIRE ALARM
BELL
EASEMENTAGREEMENT WITH750 GRAND ST.ACCEPTED ON NOV4TH, 1998
W20
CONCRETESIDEWALK,BPP FILED
SEPARATELY
4'-6"CONSTRUCTIONFENCE PER BC3307,
SEPARATE FILING
FIRE-RATEDENCLOSUREFIRESTOP SLABPENETRATIONSEXTG
CONCRETECURB
LOTLINE
LOT LINE
EXISTING EGRESS STAIRTO REMAIN ATTACHEDTO ADJACENT BUILDING750 GRAND STREET
5'-0"
G
R
A
N
D
S
T
R
E
E
T
2
"
BLDG COMPLIESWITH BC 1614EARTHQUAKE
REQUIREMENTS, SEESTRUCTURAL
1'-11"
3
'
-
6
"
3
'
-
0
"
C
L
E
A
R
3
'
-
0
"
C
L
E
A
R
VESTIBULE
7
'
-
6
"
1
0
'
-
0
"
7
'
-
6
"
ADJACENT BUILDING750 GRAND STREET
CORRIDOR
3
'
-
0
"
C
L
E
A
R
LOT LIN
E
X
I
T
STAIRWAY IDENTIFICATION SIGNPER BC 1019.1.7, TYP.
TERRACE482 SF
EL. 41'-0"
2
'
-
0
"
4
'
-
0
"
13'-312" 63'-112"
5A201
1A200
4A201
2A401
E
X
I
T
E
X
I
T
W20
EXISTING MTL DOORAND ADJACENT WALL
TO REMAIN UNDISTURBED
8'-712"
UNOBSTRUCTED PATH OFCONTINUOUS SPRINKLER COVERAGE.
SEE SP DRAWINGS3'
-
0
"
MAILBOXESPER MDL57
3'-10"
A3061
A3031
7
'
-
4
"
16'-2"
4'-712"
RETAIL / COMMERCIAL AREA1,243.8 NET SF
1,428.5 GROSS SF
PER TABLE 1004.1.2:OCCUPANCY M = MERCANTILE
USE GROUP 630 GROSS SF PER PERSON
47 PERSONSRESIDENTIAL
LOBBY
RETAIL /COMMERCIALSTOREFRONT
COMMERCIALSTAIR
EXIT
2
2
'
-
1
1
1 2
"
E
X
I
T
3
'
-
0
"
C
L
E
A
R
SOFFIT ABOVE
CHASE
C
H
A
S
E
REAR YARD
1A301
1A300
2A300
1A302
3A300
1
'
-
7
"
1
9
'
-
8
"
2
'
-
7
"
5
'
-
1
1
"
3'-012"
2
'
-
3
1 2
"
9
'
-
3
"
CHASE
LOT LINE WINDOW COMPLIES W/ BC704.12 OPENING PROTECTION,TEMPERED GLASS, AUTOMATIC SPRINKLER PROVIDED PER BC 903.2.7,DOES NOT COUNT FOR LIGHT & VENTILATION CALC'S
76'-5"
ELEVATOR
8'-8"
UP 17R @ 71116"
7'-0"
3'-0" 1'-0" 3'-0"
42" H GUARDRAILPER BC 1012.2
5
'
-
0
1 2
"
DN 16R @ 7 916"
3
'
-
8
"
3'-4"
3
'
-
4
1 2
"
8'-2"
W20
DN 18R @ 634"3 '
-
0
"
3
'
-
0
"
3'-0"
6
'
-
1
1
1 2
"
HCP-ACCRR
FD
EWH
C
H
A
S
E
5
'
-
1
0
"
7'-412"
3'-0"
EXISTING BRICK MASONRYWALL TO REMAIN
EXISTING BRICKMASONRY WALL
TO REMAIN
1
'
-
0
"AB
E
F
4
'
-
7
1 2
"
6
'
-
9
7 8
"
8
"
4
'
-
0
"
7
'
-
1
0
"
1 2 3 4 5 610'-034" 15'-618" 9'-4" 7'-8" 16'-0" 4'-834"
C
D
1
'
-
9
1 2
"
13
SLOPE TODRAIN, TYP.
738 GRAND STREET, BROOKLYN, USA (2015)
Located in a 100 x 25 lot in East Williamsburg this project had a major challenge to overcome since the beginning. The neighbor building has an old easement to have an exterior staircase and means of egress on the clients lot. This exterior staicase goes all the way up to the rooftop of the 4 floor neighbor building and takes about 4 from the lot. This initial setting causes that each floor layout is tailored to the available space. Additionally, this situation creates a large number of variables that had a major impact on the amount of work and coordination with the consultants.
Regarding the design, the building presents a simple yet effective volumetric composition by combining metal and brick to form a big L shape seen from the old Bushwick Savings Bank lot that contains a parking space next to the lot line.
S3 Architecture LLC - Design Development & Construction DocumentsGROSS FLOOR AREA: 10,533.42 m
Fourth Floor Plan
Ground Floor Plan
Second Floor Plan
15
9'
-
9
1 4
"
9
'
-
9
1 4
"
4TH FL MEZZ T.O.S.EL. 80'-4 " / 40'-0 "
5TH FL T.O.S.EL. 90'-2" / 49'-10"
35'-0"65'-0"
3
'
-
6
"
WEST FACADEOF 750 GRAND ST.
REAR YARD
COMMERCIAL
UNIT 2B
UNIT 3BUNIT 3A
UNIT 4A TRASHROOM
UNIT 6A
10'-0" 50'-0"
REAR YARD
EASEMENTAGREEMENT WITH750 GRAND ST.ACCEPTED ON NOV4TH, 1998
654321
10'-012" 15'-6" 9'-4" 7'-8" 20'-9"
UNIT 5A
UNOCCUPIEDDROP CEILING
TRASHROOM
UNOCCUPIEDDROP
CEILING
UNOCCUPIEDDROP
CEILING
UNOCCUPIEDDROP CEILING
UNIT 5B
TRASHSTORAGE
COMMERCIALSTORAGE SPACE COMMERCIAL
9
'
-
7
1 2
"
8
'
-
0
"
9
'
-
1
"
8
'
-
0
"
8
'
-
0
"
9
'
-
0
"
8
'
-
0
"
8
'
-
0
"
8
'
-
0
"
8
'
-
0
"
8
'
-
0
"
8
'
-
0
"
8
'
-
0
"
8
'
-
0
"
3
'
-
6
"
7
'
-
6
"
7
'
-
6
"
8
'
-
0
"
1
7
'
-
9
"
8
'
-
0
"
7
'
-
6
"
8
'
-
0
"
7
'
-
6
"
6
'
-
8
"
6
'
-
8
"
6
'
-
8
"
6
'
-
8
"
8
'
-
5
"
738 GRAND STREET, BROOKLYN, USA (2015)
Longitudinal Cross Section) (1/301)
Exterior View
16
738 GRAND STREET, BROOKLYN, USA (2015)
Wall Types. Composition and Technical Information
17
WA-14 MINERAL WOOL INSULATION
WA-14 MINERAL WOOL INSULATION
2
'
-
6
1
/
2
"
A
.
F
.
F
.
APARTMENT OUTSIDE
APARTMENT
WP-12 MTL FLASHING W / SKIRT FLASHING & CLEAT
RO-03 SBS RIGHT ANGLE FLASHING
RO-04 PORCELAIN STONEWARE ON LEVELERS
RO-05 PROTECTION LAYER, HARDBOARD
RO-01 WP MEMB. TWO-PLY SBS TORCH-APLIED
RO-06 COVERBOARD
RO-07 STAGGERED / SLOPED RIGID INSULATION
RO-08 AIR / VAPOR BARRIER
ST-01MTL DECK / STL BEAMS
WA-026" MTL STUDS W / INSULATION
WA-381 LAYERS G.W.B.
DW-12INTERMITTENT PLASTIC SHIMS
DW-093/4" STONE SILL
FL-02WOOD FLOORING & SUBFLOOR
WP-19 BUTYL FLEXIBLE FLASHING TAPE ON ALL 4 SIDES
DW-03 BUTYL FLASHING TAPE
DW-02 ALUM CLAD CASEMENT WINDOW
DW-03 BUTYL FLASHING TAPE
WP-19 BUTYL FLEXIBLE FLASHING TAPE ON ALL 4 SIDES
WP-14 STARTER TRACK W / WEEP HOLES
NEW WALLR-VALUE = 14.8
WP-17CONTINUOUS MTL ANGLE
DW-11CONTINUOUS TAPERED PLASTIC SHIMS
WP-21BUTYL TAPE
WA-026" MTL STUDS W / INSULATION
WA-381 LAYERS G.W.B.
WP-26 BACKER ROD & SEALANT, TYP.
WP-21BUTYL TAPE
WP-17CONTINUOUS MTL ANGLE
DW-14SHIM AS NECESSARY
WP-26BACKER ROD & SEALANT, TYP.
WA-11 1 LAYER 5/8" DENSGLASS GOLD
DW-151/2" MTL CHANNEL
WA-40CORNER BEAD
WA-37WOOD BLOCKING
WA-37 WOOD BLOCKING
WP-28SEALANT
R-VALUE = 20 C.I.NEW ROOF
8
"
WA-37 WOOD BLOCKING
WA-26 PTD FASTENERS
WA-25 PTD STL C-CHANNEL
DW-06 BRICKMOULD TRIM PROFILE
WP-01 VAPOR PERMEABLE AIR BARRIER / WP MEMB.
WA-11 1 LAYER 5/8" DENSGLASS GOLD
WP-01 VAPOR PERMEABLE AIR BARRIER / WP MEMB.
WA-13 1 LAYER 5/8" DENSDECK, MIN 24" ABOVE SLAB
2
'
-
0
"
M
I
N
.
D
E
N
S
D
E
C
K
WA-11 1 LAYER 5/8" DENSGLASS GOLD
WP-20 FLEXIBLE WALL FLASHING
WP-01 VAPOR PERMEABLE AIR BARRIER / WP MEMB.
WP-11 RIGID FLASHING 26 GAUGE
SCALE:1DETAIL WALL SECTION - METAL PANEL @ WINDOW
3" = 1'-0"
SCALE:2DETAIL WALL SECTION - METAL PANEL @ TERRACE
3" = 1'-0"
WA-08 2" HORIZONTAL Z-GIRTS, STL CHANNEL SUPPORT
WA-18 MTL WALL PANEL
WA-18 MTL WALL PANEL
WP-20 FLEXIBLE WALL FLASHING
WP-01 VAPOR PERMEABLE AIR BARRIER / WP MEMB.
SCALE:3DETAIL WALL SECTION - METAL PANEL@ PARAPET
3" = 1'-0"
WA-07 2" HORIZONTAL Z-GIRTS
WA-18 MTL WALL PANEL
R-VALUE = 20 C.I.NEW ROOF
4
2
"
M
I
N
.
R
A
I
L
,
T
Y
P
.
2"
1
"
2
"
APARTMENT
OUTSIDE
SCALE:4DETAIL WALL SECTION - METAL PANELS ON CMU
3" = 1'-0"
WP-01 VAPOR PERMEABLE AIR BARRIER / WP MEMB.
WA-07 2" HORIZONTAL Z-GIRTS
WA-18 MTL WALL PANEL
WA-09 8" CMU, SEE STRUCTURAL FOR REBARS
WP-12MTL FLASHING W / SKIRT FLASHING & CLEAT
RO-03SBS RIGHT ANGLE FLASHING
RO-04PORCELAIN STONEWARE ON LEVELERS
RO-05PROTECTION LAYER, HARDBOARD
RO-01WP MEMB. TWO-PLY SBS TORCH-APLIED
RO-06COVERBOARD
RO-07STAGGERED / SLOPED RIGID INSULATION
RO-08AIR / VAPOR BARRIER
CO-01SEAL PENETRATIONS IN AIR & WEATHER BARRIER
WA-37WOOD BLOCKING
WA-21MTL COPING
WA-22STEEL CLEAT
WA-24J-CHANNEL
WP-10CONTINUOUS MTL FLASHING
WA-27STNLS. STL. SELF-FURRED MTL LATH
WA-203-COAT STUCCO
WA-098" CMU, SEE STRUCTURAL FOR REBARS
WP-22 BUTYL TAPE OVER FLASHING
WP-26 BACKER ROD & SEALANT, TYP.
WA-14 MINERAL WOOL INSULATION
WA-14 MINERAL WOOL INSULATION
WP-26 BACKER ROD & SEALANT, TYP.
DW-07 1" NOSE W/ NOSE EXTENSION
WA-14 MINERAL WOOL INSULATION
4A-312
WP-01VAPOR PERMEABLE AIR BARRIER / WP MEMB.
WA-35 MORTARED BRICK BLOCKING / SUPPORT
1
'
-
0
3 8
"
49'-5"T.O.S.5TH FLMEZZ
EL. 89'-9"
78'-4"T.O.S.ROOFEL. 118'-8" WP-20 FLEXIBLE WALL FLASHING
ST-10 STL ANGLE WELDED TO BEAM. SEE STRUCTURAL
FL-10PERIMETER ISOLATION BOARD
WA-41 MTL ANGLE
WA-42 VERTICAL 3/4" DEEP SUBGIRT
WA-42 VERTICAL 3/4" DEEP SUBGIRT
WP-34 CONTINUOUS STARTER FLASH
WP-33 MTL FLASHING
WA-43 SHIMS FOR VENTING 12" O.C.
WP-18 MTL CLOSURE AS REQUIRED
WP-33 MTL FLASHING
WA-43 SHIMS FOR VENTING 12" O.C.
WA-44 RIVET
WA-44 RIVET
WA-42 VERTICAL 3/4" DEEP SUBGIRT
WA-42 VERTICAL 3/4" DEEP SUBGIRT
WA-42 VERTICAL 3/4" DEEP SUBGIRT
ENLARGED W
REFER TO PAGE A-313 IN THE SET FOR EXTENDED PRODUCT AND MATERIAL SPECIFICATIONS.
738 GRAND STREET, BROOKLYN, USA (2015)
Construction Details
18
7'-214" 3'-7"3'-634"
4
'
-
1
0
1 2
"
6
"
1
0
1 4
"
1
'
-
0
1
2
"
3
'
-
1
0
1 2
"
6
"
1'-812" 1'-812"3'-914"
12
1
1
SIDEWALK LOBBY
CORRIDOR
ELEVATOR
1
STAIR A
STAIR B REAR YARD
10
1010
5"
TL1
TL2
TL2
MT1
SP1
ST1
CEILING12'-9 13/16"
CEILING7'-10 3/16"
CEILING12'-5 3/8"
CEILING8'-2"
6
6
6
7
SIDEWALK LOBBY
CORRIDOR
ELEVATOR STAIR A
STAIR BREAR YARD
EXIT
PT1
2
'
-
6
1 2
"
6
'
-
9
1 4
"
2
'
-
1
1
"
1
2
'
-
9
1
3
1
6
"
2
'
-
6
1 2
"
1
0
'
-
3
5
1
6
"
1
1
'
-
1
1
1
3
1
6
"
1
2
'
-
9
1
3
1
6
"
1
'
-
5
3 4
"
1
1
'
-
4
1
1
6
"
2
'
-
6
1 2
"
1
2
'
-
9
1
3
1
6
"
6
'
-
9
1 4
"
3
'
-
6
1
1
6
"
1
1
'
-
4
1
1
6
"
1
'
-
5
3 4
"
9
'
-
3
3 4
"
4
"
4
4
4 7
3
3
3
2
MT1
MT1
WP1
TL2
TL1
WP1
WP1
TL2
PT2
TL2
WP1
WP1
ST1
145 SPRING ST LOBBY, SOHO, NEW YORK, USA (2015)
Located at a high end residential building with apartments for rent the client seeked a design that matched the SOHO neighborhood style as well as his current and possible new clients.
The design concept is a variation of the traditional design concept of inlaying a carpet of tile on the entrance floor. In our poposal, the carpet is extended to the front wall of the lobby and the old concept is transformed into a new and more contemporary one.
Regarding lighting, at the entrance two pendants with a blackened steel finish on the outside and a silver one on the inside are installed. Also at the entrance and to emphasize the concept, a line of small soft hidden lights are installed at the ceiling where the carpet of tile ends. The same kind of lights are used to illuminate the mailbox area. The rest of the lobby is illuminated with regular downlights and sconces.
The most significant materials used in this proposal are blackened steel, stone tile and texturized wallpaper.
Altogether, the design offers a balance between modern and traditional design elements.
S3 Architecture LLCInterior Design ProjectGROSS FLOOR AREA: 322.42 m
Finish Floor Plan
Reflected Ceiling Plan
Interior Elevations
GENERAL CONSTRUCTION NOTES:1. INSTALL NEW TILE FLOOR. SEE FLOOR FINISH PLAN.2. INSTALL NEW STONE SADDLES3. INSTALL NEW TILE WALLS OR BASE4. INSTALL NEW WALLPAPER AT WALLS5. SKIM COAT AND PAINT EXTG WALLS6. SKIM COAT AND PAINT EXTG CEILINGS, TYP.7. SKIM COAT AND PAINT NEW SUSPENDED GWB / STL. SOFFIT, TYP., SEE DTL8. OMIT9. INSTALL AT APPROXIMATE OR DIMENSIONED LOCATIONS. ELECTRICAL OUTLETS, LTG SWITCHES, TELEPHONE, DATA, TYPICAL10. PAINT CONCRETE FLOORS
19
145 SPRING ST LOBBY, SOHO, NEW YORK, USA (2015)
Interior Rendering
20
+0,00
+1,20
+2,20
+0,20
+2,20
+0,96
+1,16
+1,56
+1,77
+0,96
31 APARTMENTS IN THE CENTRE OF MALAGA (2011)
EBYAArchitectural CompetitionGROSS FLOOR AREA: 2,245 m The location and shape of the site were the main constraints in the composition and display of the buildings. Despite the crooked shape of the lots, the buildings proposed are arranged in an orthogonal array. Thus, the patios generated have different sizes but they are all regular shapes. These patios are similar to the ones found in the city floor plan and fit nicely in this conceptual pattern.
The sharp plain walls confer a solid presence to the buildings transmitting to the pedestrians and occupants a cool feeling which is suitable for such a hot place like Mlaga. Another characteristic element in the composition is the light footbridges which are used to enter the apartments. These are covered with semitransparent synthetic fabrics which subtly block the peripheral vision of the pedestrians but keep the inner space ventilated.
Ground Floor
21
V15A
V15BV13B
V14B
V1B V2B
V12A
V12B
V12C
V12D
V4B
V5B
V6B
V7B
V8B
V9B
V13AV14A
V1A V2A
V3A
V3B
V3C
V3D
V5A
V6A
V7A
V8A
V9A
V1OA
V11A
V4A
31 APARTMENTS IN THE CENTRE OF MALAGA (2011)
Ground Floor
1st Floor
2nd Floor
East Elevetion Of The Northen Building
Night Area
Day Area
Connections
PatiosArcheological Reaminings
22
EXTENSION OF PONFERRADAS COURT OF JUSTICE IN LEN, SPAIN (2010)
EBYADesign DevelopmentArchitectural Competition, 1st PrizeGROSS FLOOR AREA: 2,000 mThe building has a straightforward design that is optimal for a public facility. The design is clear, simple and rational and also includes environmental passive control strategies.
The building is rationally organized by a structural regular grid and the elevator, stairs, sanitary installations and storage areas are concentrated in a longitudinal band at the north face. The office area is a diaphanous space with natural lighting and a flexible layout which can be reorganized easily to add or subtract new offices, working areas, meeting or waiting rooms.
The environmental passive control strategies include a greenhouse in the ground floor, a double faade and solar panels in the terrace.
First Floor
2nd Floor
23
A
BB
A
A
BB
A
EXTENSION OF PONFERRADAS COURT OF JUSTICE IN LEN, SPAIN (2010)
B-B Cross-Section
South Elevation
A-A Cross-Section
3D Model
24
144 APARTMENTS IN LA UVA DE HORTALEZA, SPAIN (2011)
The architectural competition demanded 144 apartments to be displayed in 4 consecutive lots with a maximum height of 8 floors. These lots were part of an old project called La Uva de Hotaleza. This project were a series of 2 floor residential buildings which were singular for their vegetation skin. At the time the project was an achievement of economical and sustainable architecture due to the effective passive environmental strategies used.
The studios new building preserves the vegetation skin in the first two floors because it was considered a characteristic feature of the neighborhood. The rest of the faade is composed by framed blinds which can be moved by the occupants.
Additionally, each tower has gardens displayed arbitrarily that connect to the interior courtyard and make each one unique.
A-A Cross-Section
La Uva de Hotaleza
Passive Environmental Strategies
EBYAArchitectural CompetitionGROSS FLOOR AREA: 19,316 m
25
144 APARTMENTS IN LA UVA DE HORTALEZA, SPAIN (2011)
Ground Floor
2nd Floor
Floor Type 1
Floor Type 2
26
AA
AA
AA
AA
NTHESIS PROJECT - ART CENTER IN GAV, SPAIN (2011)
The lot is in an industrial area next to Barcelona. However, the place is quickly changing due to the growth of the city and every year new projects are built and new necessities appear. The area is the perfect place for a program such as an Art Center because it requires large spaces and here the land cost is much cheaper than in the city.
The educational center I propose covers the whole range of possible art specialties. Also, the center contains a library, a conference hall, a cafeteria and a large exhibition hall. The position and layout of the building are designed to counteract the noise of the highway.
Together with the building, a neglected park on the west side of the lot is included in the proposal. The park is an important feature of the block and a unifying element in the composition of the project.
ETSABJURY: J. GARCS, A. OBIOL, E. SERRA & D. FERRERLOT AREA: 12,185 mGROSS FLOOR AREA: 10,200 m
Site in the Urban Plan Scale
Floorplan
27
THESIS PROJECT - ART CENTER IN GAV, SPAIN (2011)
South-East View
North-West View
28
THESIS PROJECT - ART CENTER IN GAV, SPAIN (2011)
Hallway ViewReception View
Courtyard Cross-Section
29
THESIS PROJECT - ART CENTER IN GAV, SPAIN (2011)
35 TANCAMENT. Premarc dacer galvanitzat amb membrana impermeable fixada.36 PAVIMENT EXTERIOR/INTERIOR ESPAIS COMUNS. Pees de formig de 120x60cm prefabricades prensades i pulides sobre capa danivellat de morter. 37 PAVIMENT EXTERIOR. Sorres Compactes.38 TERRENY. Cono grava gruixuda min 10mm39 TERRENY. Membrana Impermeable amb membrana geotextil protectora.40 TERRENY. Paret de ma que tanca la cambra sanitaria de 30cm.41 ESTRUCTURA Pilar de 35x45cm.42 TERRENY. Formig lleuger amb mallazo.43 FONAMENTACI. Fonament de ledifici en el que sancoren els pilotis.44 TERRENY. Tub de drenatge semiporos de PVC de 35cm de dimetre.45 TERRENY. Llit morter pel tub de drenatge.46 TERRENY.47 TANCAMENT. Env Pladur Metal amb montants de 46mm i panells de pladur de 13mm. Montants horitzontals cada 60cm.48 SISTEMA DE FAANA. Perfil en L dacer, de 15x15cm i 1cm de gruix.49 TANCAMENT. Finestra corredera de doble full amb marc.50 TANCAMENT. Xapa de remat amb junta oberta engatillada de 120 cm de llarg sujectada a omegues embegudes.51 TANCAMENT. Lama formada per una pea de U-glas LINIT (idem anterior) i uns marcs inferiors i superiors dalumini.(motoritzada per girar segons orient. solar) 52 TANCAMENT. Lama formada per una planxa metllica dacer inox. mate i uns marcs inf. i sup. dalumini.(motoritzada per girar segons orient. solar) 53 COBERTA DE XAPA COLABORANT. Perfil UPN 200/IPE 200. Estructura dacer que suporta el forjat de chapa colaborant. Lestructura forma un entramat de 4x8 mts(aprox.) 54 COBERTA INCLINADA. Angular de recolzament de la xapa grecada soldat a lentramat estructural. 10x10cm. 55 COBERTA INCLINADA. Acabat de xapa zenc a junta alada.56 COBERTA INCLINADA. Tauler hidrfug de 19 mm amb llmina separadora/ventilaci(evita condensacions i permet que el zenc dilati relliscant sobre ella).57 COBERTA INCLINADA. Cambra daire de 2cm. Poliestir extrut de 30mm, col.locat amb plafons de 120 x 100cm. Sota lallament una barrera vapor.58 COBERTA INCLINADA. Formig armat amb xapa grecada fent de encofrat perdut.59 COBERTA INCLINADA. Sistema de fals sostre format per unes omegues i perfils atornillats que subjecten un plaf de pladur. 60 COBERTA VERDA.Sustrat vegetal sobre llmina amb tractament antiarrels.61 COBERTA VERDA. Placa drenant 30mm. 62 COBERTA VERDA. Allament trmic de poliestir extrut, membranes dimpermeabilitzaci.63 COBERTA INCLINADA.Entramat de perfils anclats a lestr. formig armat.
ESPECIFICACIONS TCNIQUES
Construction Details
30
MULTIDISCIPLINARY PREMISES FOR YOUNG PEOPLE IN BARCELONA, SPAIN (2007)
The site is located in El Raval neighborhood, which is found in the Ciutat Vella district of Barcelona. The lot has a dividing wall on the north side that was uncovered when the previous building was demolished. The building I propose will replace the old one, setting an end to the block and generating a large plaza at the south. This kind of large open air spaces in such a dense place like el Raval are very valuable. Although the position of the building may seem to cut the street extension strategy, the idea is that the street continues inside the building and becomes a large exhibition hall. Once inside the building people can access the rest of the floors through the elevator and staircase situated at the center.
In the plaza, irregular bleachers are displayed following the shape of the building which could be used as improvised scenarios.
Ground Floor
South Elevation
Concept
Section View
South-West View
ETSAB - Studio XProfessors Mamen Domingo & Eduard CalafellGROSS FLOOR AREA: 2270 m
31
MULTIDISCIPLINARY PREMISES FOR YOUNG PEOPLE IN BARCELONA, SPAIN (2007)
01 Ladrillo e=14cm02 Pintado y estucado blanco03 Losa de hormign armado de 50cm de espesor04 Acabado: grava. e=5cm. Filtro antiraiz geotextil.e=0.5mm. Aislante trmico:Poliestireno extruido. e=5cmLmina impermeable: Hypalon. e=1.5mmCapa de pendiente: 2% - Hormign celular. e=10cm con junta perimetral de 2cmBarrera de vapor de PVC e=1mm05 Pieza de cermica para la proteccin de la lmina impermeable en el canto.06 Plancha de acero inoxidable fijada al murete y soldada con el perfil en T que soporta las cargas del lucernario07 Taco de madera bajo tela impermeable08 Mortero soporte del perfil del canaln09 Lmina impermeable: EPDM. e=5mm10 Banda polietireno expandido Porex .Aislante trmico.11 Perfil en T de acero inoxidable de ala de 13cm y e=2cm12 Travesao de aluminio 5mm13 Pieza en L de acero inoxidable de 13cm de ala y e=2cm14 Plancha plegada aluminio 3 mm.15 Pieza en L de acero inox. e=1cm16Chapa metlica atornillada de 5mm de espesor 17 EPDM recubierto con chapa de aluminio de 2mm18 Silicona estructural para aguantar los vidrios a los perfiles de fijacin19 Vidrio climalit de doble hoja (6mm-6mm-12mm)20 Perfil L de sujeccin del travesao con pasador coliso e=5 mm21 Montante de aluminio a los que quedan collados los perfiles de soporte de los vidrios.22 Siliciona de sellado23 Separador (puntual)24 Fondo de junta de espuma (corrido) 25 HEB 200 de 6 m de largo aprox. Perfil estructural de la fachada de vidrio y el lucernario 26 HEB 160 de 6 m de largo aprox. Perfil estructural de la fachada de vidrio.
Skylight. Detailed Cross-Sections
ESPECIFICACIONS TCNIQUES
32
CONSERVATORY OF MUSIC IN BARCELONA, SPAIN (2006)
The site is located in the historical centre of Barcelona. The building consists of two L-shapes which meet at their tips. The staircases and elevators are located in these points. The entrance to the school is located on the west faade and the access to the underground auditorium is under the main porch on the south side of the building.
The L-shape design encloses a courtyard while at the same time opens to the park providing most parts of the building with views to the park.
Due to the narrowness of the streets and the fact that it is an educational building, the windows were a sensitive issue to take into consideration. There are 3 types of windows. The normal windows, which have views to the courtyard, the ones that have views to the public building on the East side and the ones that face residential buildings.
Music Areas Connections
No Music Areas Staircases/ElevatorsCourtyard Cross-Section
Volumetric Model
ETSAB - Studio VIIProfessors Conxita BalcellsGROSS FLOOR AREA: 4470 m
33
CONSERVATORY OF MUSIC IN BARCELONA, SPAIN (2006)
North-East View
South-East View
View from the street
01 Viga dacer peraltada de 20x45 cm, permet el pas dinstalacions02 Forjat chapa collaborant.03 Pilar dacer de 15x20cm.04 Ma cermic 9x14x29 cm.05 Paviment. Parquet de pees de 10 cm06 Paviment. Pedra grantica fosca de 30x30 cm.07 Capa de 15 mm de sorra.08 Capa de morter de 30 mm.
09 Fals sostre suspes de forjat10 Faana aplacada amb taulers de resinas termoestables TRESPA de 10 mm. Penjades a lestructura de sujecci formada per un perfil en L, un altre en T (dalumini) i unes guies horizontals. Aquesta est fixada als maons mitjancant tacs dexpansi.11 Aillant trmic de poliestir extrut.12 Finestra. Marcs dalumini i vidre climatit
amb cambra, millorant les condicions trmiques i acstiques de la sala13 Lames horitzontals de fusta de teca sujectades per perfils de secci circular de 1 cm de dimetre anclats als forjats14 Panel Knauf de 15 mm.15 doble Montant Knauf amb riostres de 70mm dacer inox.16 doble Travesao Knauf 70mm dacer inoxidable.
17 Lana mineral 45 mm.18 Env aplacat amb taulers de resinas termoestables TRESPA de 10 mm. Penjades a lestructura de sujecci de rastrels de fusta de 40x35 mm.
ESPECIFICACIONS TCNIQUES
Windows. Detailed Cross-Section
34
HANS CHRISTIAN ANDERSEN MUSEUM, ODENSE, DENMARK (2013)
The concept of the project is based on a spatial interpretation of an idea behind all Hans Christian Andersens fairy tales. In his stories the world is divided in 2: the real & the fantastic.
In our project, the real world is at the surface-level and is represented by the existing buildings, the park and the entrance to the museum. The fantastic world, is underground and hosts the exhibition spaces.
To enter the museum and begin their journey the traveler must go through the lake by descing a ramp. As in HCAs stories, nature is the interface between the 2 worlds and water is the gateway. In our proposal vegetation, water & light are key elements in the visitors experience. These are an intrinsic part of the museum and in combination with several types of Artifacts scattered through the site they help visitors to be aware of this dual world.
At the end of the journey, travelers go into the Moral Space, which returns them back to reality while revealing new knowledge about some aspect of human complexity.
In partnership with T. SANTS, T. ORAMAS, G. LOPEZ, F. RUSSO, A. SIMELIO, S. JAVERAArchitectural CompetitionGROSS FLOOR AREA: 3,697.541 m
Exhibition Spaces Concept
Conceptual Cross-Section
The Proposal
35
HANS CHRISTIAN ANDERSEN MUSEUM, ODENSE, DENMARK (2013)
The Moral SpaceSaxophone
The Storyteller
The Canopy
ARTIFACTS
The Voyeur
The Lantern
36
Geometry
Carcass
Kokedama Holder Design
Holder Design Process
Porosity Permeability
Transpiration
Product
p
Plant
Bonsai Soil
Moss
Kokedama Assembly Process
Soil Ball
Moss Wrap Kokedama
KOKEDAMA HOLDER DESIGN (2015)
The Kokedama Holder is a personal exploration into product design using Rhino + Grasshopper & 3D printing. This exploration is an open project because I continue to modify the design algorithm and produce different results.
Regarding my future goals on this project, I would like to experiment with other materials more suitable for holding plants such as ceramic or biodegradable materials, and to continue the design exploration between vegetation and geometry. These two goals combined are highly challenging because often the plant needs and the structural requirements of these materials are contradictory.
Product DesignInside 2015 Morpholio Competition Honorable Mention
Kokedama Holder Design Process
Kokedama Assembly Process
37
KOKEDAMA HOLDER DESIGN (2015)
Product Rendering Product Image
3D Printing Result
38
Portfolio 2015 V1 0-14Portfolio 2015 V1 15-30Portfolio 2015 V1 31-38
top related