Aldo Bergsma/ John Stuiver 01-02-2010Centre for Geo InformationCentre for Geo-information 1 Light rail Application Interactive user (re)design.

Post on 27-Dec-2015

214 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

Transcript

01-02-2010 Centre for Geo InformationCentre for Geo-information

1

Aldo Bergsma/John Stuiver

Light rail Application

Interactive user (re)design

Centre for Geo Information2

Spatial Application Building

Centre for Geo Information3

Spatial Application Componentsa) Spatial & Tabular data preparation (Pre-

processing).b) Automatic computation of the most desirable

light rail route and corridor.c) Interactive user (re)design of the Light Rail d) Fulfilling project criterion (reach light rail

within 5 to 10 minutes walk)e) Calculation of the approximate costs of the Light

Railf) Map presentation for stakeholders

Centre for Geo Information4

Light rail route and corridor.

Light Rail Route Light Rail Corridor

Centre for Geo Information5

Component c: Interactive user (re)design

• Automatic generated path and corridor• Based on land use as main criteria for

suitability factors.• User determined criteria (political, usability,

etc.)

• Included in (re)design

Centre for Geo Information6

User (re)design

70% of the population must live in a walking distance of 5-10 minutes

Centre for Geo Information7

Examples of where user decisions must be made

Wageningen

Bennekom

Centre for Geo Information8

Handy Background Layers during (re)design Route

• Weight factors determining the corridor • Light Rail Corridor: degrees of freedom

more in non-buildup areas• Computed Light Rail Route

Centre for Geo Information9

(Re)Design Route

• Data exploration in ArcCatalog• Data viewing ArcCatalog (single datasets) /

ArcMap (Multiple datasets)

• Editing– ArcCatalog (Creation of new empty

datasets)– ArcMap (Filling datasets by digitizing)

Centre for Geo Information1

0

Digitizing1. Create new datasets in ArcCatalog

• Adding a map coordinate system and user-defined attributes to a geo-dataset

2. Preparing the digitising environment in ArcMap

3. Adding data to a spatial dataset in ArcMap (Digitizing)

Centre for Geo Information1

1

Map coordinate systems

• Principle in ArcGIS– Each dataset must have a coordinate

system defined

• Dutch National grid– “Rijksdriehoekstelsel New”

• Reference data for digitizing (background layers)

Centre for Geo Information1

2

Presentation reference dataDatasets concerning

• Weight factors• Light Rail Corridor• Light Rail Route• Infrastructure• Etc.

Centre for Geo Information1

3

Task Settings

• Tasks– Create new features– Modify features

Centre for Geo Information1

4

Target Settings

• Select the Edit layer

Centre for Geo Information1

5

Snap Settings

• Snap to reference layers

top related