Transcript
REGIONAL INVESTMENT POTENTIAL EXHIBITION
SOUTHEAST SULAWESI
REGIONAL INVESTMENT BOARD OF SOUTHEAST SULAWESI
JL. MAYJEN S.PARMAN NO. 02 PHONE: (0401) 3126053 FAX. (0401) 3126182 KENDARI 93121
2
SOUTHEAST SULAWESICAPITAL CITY : KENDARI.
3 ° LS – 6 ° LS AND 120 °45’ BT-124° 6’ BT.
PROFILE OF SOUTHEAST SULAWESI
I. GENERAL INFORMATION:A. Area : 153.018,93 Km2.
a. Land Area : 38.139,98 Km2 b. Sea Area: 114.879 Km2.
B. Consist of 10 Regencies and 2 Municipalities.C. Population: 2. 031.532 People.D. Economic Condition:
a. Economic Growth: 7,96% (2007).b. GRDP : Rp. 17.953.07 Billion Rupiah. (2007).c. Per Capita income: Rp. 8.837.209.76 .
E. Man Power:a. Number of Employee is 9769.256 from total
number of working age (2008).
b. Number of Unemployed: is 407.094, from total number of working age (2008).
II. InfrastructureA. Airport :
a Haluoleo Airport (Kendari City)b. Matahora Airport (Wakatobi Regency)c. Saniban Airport (Kolaka Regency).d. Sugimanuru Airport (Muna Regency).e. Betoambari Airport (Bau-Bau City).
B. Seaport: a. 3rd class seaport: Kendari and Bau-Bau Seaport,b. 4th class seaport: Pomalaa seaport, Kolaka Regency.c. 5th class seaport: Kolaka , Raha, and Langara seaport.
C. Length of Road: 8.422.77 Km. a. National Road : 1.328.92 Km,
b. Province Road : 489 Km.c. Regencies Road : 8.422.77 Km.
D. Power supply:Instaled Capacuty : 480.375.318 KW.
PROFILE OF SOUTHEAST SULAWESI
INVESTMENT POTENTIAL IN SOUTHEAST SULAWESI
N I C K E L
G O L D
A S P H A L T
POWER PLAN
LOCATED IN BOMBANA REGENCY, KOLAKA REGENCY, BUTON REGENCY, NORTH KOLAKA REGENCY, NORTH KONAWE REGENCY, SOUTH KONAWE REGENCY , KONAWE REGENCY .
NICKLE DEPOSITE = 97,4 BILLION TONS
LOCATED IN NORTH KOLAKA REGENCY, KOLAKA REGENCY, KONAWE REGENCY, SOUTH KONAWE REGENCY, AND BOMBANA REGENCY.
GOLD DEPOSITE = 1,125 MILLION TONS
LOCATED IN BUTON ISLAND INCLUDE NORTH BUTON REGENCY, BUTON REGENCY, AND BAU-BAU MUNICIPALITY.
ASPHALT DEPOSITE = 680.747.000 TONS.
ASPHALT BUTON UTILIZATION IN OTHER PROVINCES IN INDONESIA
MAJALENGKA-WEST JAVA
TOMO-WEST JAVA
GORONTALO
SOURCE : Drs. Madi Hermadi, Ssi, MMRoad and river Research and Development Centre.
QUARTZ : 5 BILLION TONS
MARMBLE : 206 BILLIOM M3
CLAY : 884 BILLION M3
ONIX : 547 THOUSAND
M3
GAMPING STONE : 1,6 BILLION M3
MANGANESSE : 6.000 HA IN BUTON
REGENCY
IRON SAND : IN BUTON REGENCY,
NORTH KONAWE, KONAWE
AND BOMBANA REGENCIES
PHOSPAT : IN BUTON
REGENCY
CRHOMITES : 2.000 – 2.500 HA IN
BUTON REGENCY.
MAGNESITE : NORTH KOLAKA,
KOLAKA, KONAWE AND
BOMBANA REGENCIES.
MINING POTENTIAL FOUND IN SOUTHEAST SULAWESI
THE POTENTIAL OF ELECTRICITY ENERGY RESOURCES
HYDRO POWER POTENTIAL
LASOLO RIVER 90 MW
KONAWEHA RIVER24 MW
TAMBOLI RIVER25,8 MW
LALINDU RIVER100 MW
GEO THERMAL POTENTIAL
LAINEA60 MWE
MANGOLO50 MWE
Prediction of electricity demand in southeast sulawesi in order to be a centre of mining industries indonesia : For smelter dan refinery is 640 MG. For stainles steel fabrique is 230 MW.
NO RIVER REGENCYDEBIT
(M3/DET)
CAPACITY
(KW)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Lasolo.
Lalindu.
Mosolo.
Lampeapi.
Lawei Roraya.
Ngari-ngari.
Winto wining.
Lakalawa.
Ronta
Towor
Lantowu.
Alawatu.
Tamboli.
Mangolo.
Oko-oko
North Konawe
North Konawe
Konawe
Konawe
Konawe
South Konawe
Buton
Buton
North Buton
North Buton
Muna
North Kolaka
North Kolaka
North Kolaka
Kolaka
124,000
413,000
5,300
13,890
12,300.
0,350
12,300
0,280
0,230
8,000
3,270
26,290
7,000
1,480
2,530
100.000,00
200.000,00
7.950,00
10.420,00
1.412,0
10.500,00
1.600,00
13.050,00
520,00
489,00
3.677,00
2.953,00
788,00
222,00
1,00
Source : Dinas Energi dan Sumber Daya Mineral Prov. sultra 2008
SOME OF AREAS IN SOUTHEAST SULAWESI POTENTIAL TO BE ELECTRICITY RESOURCES
Electricity
Condition
Company : PT. PLN (Persero).Installed Capacity : 89,17 MW.Peak Load : 69,52 MWCustomer : 141.774 (415.043 Family).Customer Development : 10,19 % a year.Ratio of electrification : 34,14 %.Installed Villages : 1.348 Villages among 2.000 Villages (67,4 %).
SOUTH EAST SULAWESI EXPLORE THE HIDDEN
MIRACLE
THANK YOU
top related