    MM COURSE: IM MATERIAL MVT

    Page | 1

    BSNL

    USER MANUA L : IM Ma t er i a l Movemen t s

    Version:1.0

    01/09/2010

  • 8/10/2019 5.MM-IM Material Movements

    2/226

    MM COURSE: IM MATERIAL MVT

    Page | 2

    Table of Contents

    FLOWCHART ................................................................................................................................................................... 4

    1. Goods Receipt .......................................................................................................................................................... 5

    1. MM-MIGO-GR-Goods Receipt against Outbound Delivery .................................................................................. 5

    2. MM-MIGO-GR-Goods Receipt against PO-Direct Consumption .......................................................................... 9

    3. MM-MIGO-GR-Goods Receipt against PO-Non-Valuated Materials .................................................................. 13

    4. MM-MIGO-GR-Goods Receipt against PO-Project Stock ................................................................................... 18

    5. MM-MIGO-GR-Goods Receipt against PO-Stock ................................................................................................ 23

    6. MM-MIGO-GR-Goods Receipt against PO-towards direct Capital ..................................................................... 27

    7. MM-MIGO-GR-Goods Receipt against PO-towards Project Stock Capital ......................................................... 32

    8. MM-MIGO-GR-Goods Receipt against PO-towards Subcontracting & Repair ................................................... 37

    9. MM-MIGO-GR-Goods Receipt against PO-with Account Assignment ............................................................... 41

    10. MM-MIGO-GR-Return delivery to Vendor against Rejection ......................................................................... 46

    11. MM-ZMMP_SFGS-Goods Movement of Serialized Material .......................................................................... 50

    12. MM-MB90 GR note print out ......................................................................................................................... 50

    13. MM-MIGO-GR-Goods Receipt in case of Excisable Subcontracting Challan .................................................. 55

    2. Reservation ............................................................................................................................................................. 64

    1. MM-MB21-Create Reservation for Revenue Consumption ............................................................................... 64

    2. MM-MB21-Create Reservation for Transfer posting Mvt-913 ........................................................................... 69

    3. MM-MB21-Create Reservation for Transfer posting Mvt-915 ........................................................................... 74

    4. MM-MB22-Change Reservations ....................................................................................................................... 79

    5. MM-MB23-Display Reservations ........................................................................................................................ 83

    6. MM-ZMMF_RES- Reservation Output ................................................................................................................ 86

    3. Transfer Posting ..................................................................................................................................................... 88

    1. MM-MIGO-TP-One-Step Transfer posting between Slocs ................................................................................. 88

    2. MM-MIGO-TP-Transfer Posting Between Two Project Stocks ........................................................................... 94

    3. MM-MIGO-TP-Transfer Posting from Project to Revenue Stock ....................................................................... 99

    4. MM-MIGO-TP-TransferPosting Between Revenue to Project Stocks ............................................................. 104

    5. MM-MIGO-TP-Two-Step Stock Transfer between Slocs .................................................................................. 109

    6. MM-MB1B-TP-Transfer Posting of Input Material for Subcontracting Vendor End Mvt-541 ......................... 115

    7. MM-MB90 STO issue note print out ................................................................................................................ 120

  • 8/10/2019 5.MM-IM Material Movements

    3/226

    MM COURSE: IM MATERIAL MVT

    Page | 3

    4. Goods Issue .......................................................................................................................................................... 125

    1. MM-MIGO-GI- Goods Issue to Project from Project Stock .............................................................................. 125

    2. MM-MIGO-GI- Return Partial Qty. against reservation .................................................................................... 131

    3. MM-MIGO-GI- Reversal of Project Stocks to Project ...................................................................................... 135

    4. MM-MIGO-GI-Goods Issue for Own Consumption .......................................................................................... 138

    5. MM-MB90 GI note print out ............................................................................................................................ 145

    5. Goods Movement - Others ................................................................................................................................... 150

    1. MM-MB02-Change Material Document ........................................................................................................... 150

    2. MM-MB90-Processing of Material Document ................................................................................................. 153

    3. MM-ZMMP_SMO01_Slow moving_Non moving_Obsolete............................................................................. 158

    6. Outbound Delivery ................................................................................................................................................ 162

    1. MM-MIGO-VL10B & VL02N-Create Outbound Delivery & PGI ........................................................................ 162

    7. Returnable Gatepass (RGP) ................................................................................................................................ 170

    1. MM-ZMMP-RGP01-(With Material Document) ............................................................................................... 170

    2. MM-ZMMP-RGP01-(Without Material Document) .......................................................................................... 182

    3. MM-ZMMP_RGP02-Change Returnable Gate Pass .......................................................................................... 194

    4. MM-ZMMP_RGP03-Display Returnable Gate Pass .......................................................................................... 197

    5. MM-ZMMF_RGP-Returnable Gate Pass Output .............................................................................................. 199

    6. MM-ZMMP_RGPRET01-RGP - Return Material Gate Pass ............................................................................... 202

    7. MM-ZMMP_RGPRET02-RGP return change ..................................................................................................... 205

    8. MM-ZMMP_RGPRET03-RGP - Return display .................................................................................................. 209

    8. Non Returnable Gatepass (NRGP) ...................................................................................................................... 213

    1. MM-MIGO-NRGP-Non Returnable Gatepass ................................................................................................... 213

    2. MM-ZMMF_NRGP- Non Returnable Gate Pass print out ................................................................................. 217

    9. Physical Verification .............................................................................................................................................. 220

    1. MM-MIGO-Physical Inventory Verification ...................................................................................................... 220

  • 8/10/2019 5.MM-IM Material Movements

    4/226

    MM COURSE: IM MATERIAL MVT

    Page | 4

    FLOWCHART

  • 8/10/2019 5.MM-IM Material Movements

    5/226

    MM COURSE: IM MATERIAL MVT

    Page | 5

    1. Goods Receipt

    1. MM-MIGO-GR-Goods Receipt against Outbound Delivery

    Overview

    In Case of Stock Transfer Order Goods Receipt will be done against Outbound Delivery

    Make Goods Receipt w.r.t. to Outbound Delivery

    Access Transaction byTransaction Code Activity

    MIGO Goods Receipt against Outbound Delivery

    In the Screen Goods Receipt Outbound Delivery enter the following Entry:

    Field Name Description R/O/

    C

    User Action and Values Comments

    Executable Action Enter the Executable

    Action as Goods Receipt

    R Enter the Executable Action

    as Goods Receipt

    Reference Document Select Outbound

    Deliveryas ReferenceDocument

    R Select Outbound Delivery

    as Reference Document

    Movement Type Use Movement Type -101 R Use Movement Type -101

  • 8/10/2019 5.MM-IM Material Movements

    6/226

    MM COURSE: IM MATERIAL MVT

    Page | 6

    Select Good

    Receipt

    Select Outbound

    Delivery

    Enter the Outbound

  • 8/10/2019 5.MM-IM Material Movements

    7/226

    MM COURSE: IM MATERIAL MVT

    Page | 7

    Enter the Quantit

  • 8/10/2019 5.MM-IM Material Movements

    8/226

    MM COURSE: IM MATERIAL MVT

    Page | 8

  • 8/10/2019 5.MM-IM Material Movements

    9/226

    MM COURSE: IM MATERIAL MVT

    Page | 9

    2. MM-MIGO-GR-Goods Receipt against PO-Direct Consumption

    Overview

    Deliveries of Direct Charge-Revenue category material is required to be received from Vendors as a part of external

    procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    Direct Charge-Revenue material is required to be received from Vendors against Purchase Order placedby the company. A goods movement is entered into the system referencing others accordingly goodsreceipt material document is posted. Appropriate general ledger accounts-Company Stock Accounts arealso posted. On receipt there shall not be Stock in the system as the material of the Direct Charge

    category shall be treated as Consumed.

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-Following Fields are required to be maintained-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Receipt w.r.t. PO)Delivery Note Vendors Invoice Number

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any Remarks

    OutputResults CommentsThe output is a material documentwhich can contain accounting, profitcenter, and other financial postings.

    Each time an inventory movement is posted a Material document isby the system. If the movement has a financial impact an Accountidocument is also created.

    Tips and Tricks

    1.When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for thistransaction.

  • 8/10/2019 5.MM-IM Material Movements

    10/226

    MM COURSE: IM MATERIAL MVT

    Page | 10

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory Management

    Goods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the

    fields as specified in the below table:

    Fill the below data in details,

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    Select goods receipt

    Select Purchase

  • 8/10/2019 5.MM-IM Material Movements

    11/226

    MM COURSE: IM MATERIAL MVT

    Page | 11

    Posting

    Date

    Default is current system

    date

    R No user input Todays date

    defaults in

    DeliveryNote

    Delivery Note number-Vendor Invoice Number.

    R Enter details of VendorsInvoice/Challan number.

    Bill oflading

    Number of the bill of ladingissued by the sender.

    O Enter bill of lading number ifavailable.

    Not Required

    Notes Document header text.Contains explanations ornotes which apply to thedocument as a whole.

    O Use for Any remarks

    Movement

    type

    Goods movement type

    automatically from PO

    Auto Movement Type number shall

    automatically come to 101 ifGR is against PO & stock

    TypeUnrestricted

    Movement

    type is 101forgoods receipt

    against PO

    In the Material TABMaterial Material Code/number Auto Automatically from PO

    In the Quantity Tab

    Quantity Quantity received R Automatically from PO,However check it if it need to

    be changed at the time of

    receipt depending on partialquantity.

    QuantityInDelivery

    Note

    Quantity as per VendorChallan Number

    R Quantity as per VendorsChallan number to trackOver/Shortage Report.

    No ofContainers

    Number of ContainersReceived

    O Optional in case to track no.of containers received fromVendors.

    In the Where Tab

    Plant Plant number. AutofromPO

    Shall be automatically comefrom PO.

    If the plant isleft blank, itwill be

    picked upfrom the

    purchaseorder.

    Storagelocation Storage location R Enter or select a storagelocation if not entered in the

    PO

    Goods

    Recipient

    Name of person receiving

    Goods

    O Name of person/Say Stock

    Receiver

    Unloading

    Point

    Unloading Point name O The place in the Storage

    Location/Receipt Bay

    Text Any Remarks for material O Write any notes for material if

    required.

    In the Information related to PO Press the tab to view the same

  • 8/10/2019 5.MM-IM Material Movements

    12/226

    MM COURSE: IM MATERIAL MVT

    Page | 12

    Purchase

    Order

    TAB

    shall appear.

    In thePartner

    Tab

    Vendor Name shall appear. Press the tab to view the same

    In the

    AccountAssignment Tab

    G/L Account

    Cost Center field shall beappeared. Values shall beautomatically picked from

    Account Assignment.

    Press the tab to view the same

    Finally Check on the Item OK button to ensure selecting the Item.

    (Note: On the above table, in column R/O/C; R = required, O = Optional, C = Conditional)

    Note-

    1. Before Saving the document, Click on the Check Button to check the completeness of the document.

    2. System shall give the messageDocument is OK

    3. Now Save the transaction

    Result: Document posted. (Material document number shall be generated and also accounting document shall

    also be generated in the background. On display, in Doc. Information; accounting document can be seen.

  • 8/10/2019 5.MM-IM Material Movements

    13/226

    MM COURSE: IM MATERIAL MVT

    Page | 13

    3. MM-MIGO-GR-Goods Receipt against PO-Non-Valuated Materials

    Overview

    Deliveries of NonValuated material is required to be received from Vendors as a part of external procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    NonValuated material is required to be received from Vendors against Purchase Order placed by thecompany. A goods movement is entered into the system referencing Purchase Order accordingly goodsreceipt material document is posted. Appropriate general ledger accounts-Company Stock Accounts/Consumption Accounts as applicable are also posted.

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-

    Following Fields-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Receipt w.r.t. PO)

    Delivery Note Vendors Invoice Number

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any Remarks

    Tips and Tricks

    When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for thistransaction.

    In case of any problem in the material found at the time of receiving after creating material document bymovement type 101 , simply reverse the material document by following transactions-

    Go to Transaction code-MBST or follow the menu path:Logistics Material Management Inventory

    ManagementMaterial Document Cancel/ReverseEnter- Posting date, Material document Number and Material document year and proceed further byentering followed by saving.

  • 8/10/2019 5.MM-IM Material Movements

    14/226

    MM COURSE: IM MATERIAL MVT

    Page | 14

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory Management

    Goods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the

    fields as specified in the below table:

    Select GR purchase

    order

  • 8/10/2019 5.MM-IM Material Movements

    15/226

    MM COURSE: IM MATERIAL MVT

    Page | 15

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    PostingDate

    Default is current systemdate

    R No user input Todays datedefaults in

    Delivery

    Note

    Delivery Note number-

    Vendor Invoice Number.

    R Enter details of Vendors

    Invoice/Challan number.

    Bill oflading

    Number of the bill of ladingissued by the sender.

    O Enter LR No.

    Notes Document header text.

    Contains explanations ornotes which apply to the

    document as a whole.

    O Use for Any remarks

    Movementtype

    Goods movement type.-Automatically if GR isagainst PO

    Auto Movement Type number shallautomatically come to 101 ifGR is against PO & stock

    TypeUnrestricted

    Movementtype is101for goods

    receiptagainst PO

    In the Material TAB

    Material Material Code/number Auto Automatically from PO

  • 8/10/2019 5.MM-IM Material Movements

    16/226

    MM COURSE: IM MATERIAL MVT

    Page | 16

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    In the quantity tab

    Quantityin Unit of

    entry

    Quantity received R Automatically from PO,However check it if it need to

    be changed at the time ofreceipt depending on partialquantity.

    Quantity

    InDelivery

    Note

    Quantity as per Vendor

    Challan Number

    R Quantity as per Vendors

    Challan number to trackOver/Shortage Report.

    No ofContainers

    Number of ContainersReceived

    O Optional in case to track no.of containers received fromVendors.

    In theWhereTab

    Plant Plant number. AutofromPO

    Shall be automatically comefrom PO.

    If the plant isleft blank, itwill be

    picked up

    from thepurchase

    order.Storage

    location

    Storage location R Enter or select a storage

    location as ONMR

    GoodsRecipient

    Name of person receivingGoods

    O Name of person/Say StockReceiver

    UnloadingPoint

    Unloading Point name O The place in the StorageLocation/Receipt Bay

    Text Any Remarks for material O Write any notes for material ifrequired.

    In thePurchaseOrder

    TAB

    Information related to POshall appear.

    In the

    PartnerTab

    Vendor Name shall appear.

    Finally Check on the Item OK button to ensure selecting the Item.

  • 8/10/2019 5.MM-IM Material Movements

    17/226

    MM COURSE: IM MATERIAL MVT

    Page | 17

    Before Saving the document, Click on the Check Button to check the completeness of the

    document.Note-After clicking on check button a message will be displayed for entering the excise detail. This message will

    appear when the Purchase Order has the relevant Tax code for Excise i.e. when the vendor is charging ED

    separately and prices are not inclusive of ED. In such cases Go to the Excise Tab and select the ONLY PART-1

    entry. However, in case the Plant is not availing CENVAT, then always select NO EXCISE ENRTY Despite the tax

    code for Excise in PO.

    System shall give the messageDocument is OK

    Now Save the transaction.

    Result: Document posted. (Material document number shall be generated and also Accounting document shall

    also be generated in the background. On display, in Doc. Information; Accounting document can be seen.

  • 8/10/2019 5.MM-IM Material Movements

    18/226

    MM COURSE: IM MATERIAL MVT

    Page | 18

    4. MM-MIGO-GR-Goods Receipt against PO-Project Stock

    Overview

    Deliveries of Project Stock Capital material is required to be received from Vendors as a part of external

    procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    Project Capital material is required to be received from Vendors against Purchase Order placed by thecompany. A goods movement is entered into the system referencing others accordingly goods receiptmaterial document is posted. Appropriate general ledger accounts-Company Stock Accounts are also

    posted. On receipt of the Project Capital Material,

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-Following Fields are required to be maintained-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Receipt w.r.t. PO)Delivery Note Vendors Invoice Number

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any RemarksExcise Invoice Select Only Part1

    Tips and Tricks

    When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for this

    transaction.

    In case of any problem in the material found at the time of receiving after creating material document by

    movement type 101 , simply reverse the material document by following transactions-

    Go to Transaction code-MBST or follow the menu path:Logistics Material Management Inventory

    ManagementMaterial Document Cancel/ReverseEnter- Posting date, Material document Number and Material document year and proceed further by

    entering followed by saving.

  • 8/10/2019 5.MM-IM Material Movements

    19/226

    MM COURSE: IM MATERIAL MVT

    Page | 19

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory Management

    Goods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the

    fields as specified in the below table:

    Select ood recei t

    Select purchase order

    Enter purchase order

  • 8/10/2019 5.MM-IM Material Movements

    20/226

    MM COURSE: IM MATERIAL MVT

    Page | 20

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    PostingDate

    Default is current systemdate

    R No user input Todays datedefaults in

    DeliveryNote

    Delivery Note number-Vendor Invoice Number.

    R Enter details of VendorsInvoice/Challan number.

    Bill oflading

    Number of the bill of ladingissued by the sender.

    O Enter bill of lading number ifavailable.

    Not Required

    Notes Document header text.

    Contains explanations ornotes which apply to the

    document as a whole.

    O Use for Any remarks

    ExciseInvoice

    Excise Invoice, date, excisegroup.

    R Select Only Part1, Excise Group63 defaults

    in

    Movement

    type

    Goods movement type. Auto

    matically

    Movement Type number shall

    automatically come to 101 ifGR is against PO & stockTypeQ in case of ProjectCapital Stock.

    Movement

    type is 101with StockType Q forgoods receipt

    against POfor ProjectCapital.

    In theMaterial

    TAB

    Material Material Code/number Auto Automatically from PO

    In theQuantityTab

    (Note: On the above table, in column R/O/C; R = required, O = Optional, C = Conditional)

    Press the ENTER button.

  • 8/10/2019 5.MM-IM Material Movements

    21/226

    MM COURSE: IM MATERIAL MVT

    Page | 21

    On screen Goods Receipt: Selection Screen

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    Quantity Quantity received R Automatically from PO,

    However check it if it need tobe changed at the time ofreceipt depending on partial

    quantity.

    QuantityInDelivery

    Note

    Quantity as per VendorChallan Number

    R Quantity as per VendorsChallan number to trackOver/Shortage Report.

    No of

    Containers

    Number of Containers

    Received

    O Optional in case to track no.

    of containers received fromVendors.

    In theWhere

    Tab

    Plant Plant number. Auto

    fromPO

    Shall be automatically come

    from PO.

    If the plant is

    left blank, itwill be

    picked upfrom the

    purchaseorder.

    Storage

    location

    Storage location R Enter or select a storage

    location if not entered in thePO

    GoodsRecipient

    Name of person receivingGoods

    O Name of person/Say StockReceiver

    UnloadingPoint

    Unloading Point name O The place in the StorageLocation/Receipt Bay

    Text Any Remarks for material O Write any notes for material ifrequired.

    In the

    PurchaseOrderTAB

    Information related to PO

    shall appear.

    Press the tab to view the same

    In thePartner

    Tab

    Vendor Name shall appear. Press the tab to view the same

  • 8/10/2019 5.MM-IM Material Movements

    22/226

    MM COURSE: IM MATERIAL MVT

    Page | 22

    In the

    Account

    Assignment Tab

    G/L Account &

    WBS Element field shall be

    appeared. Values shall beautomatically picked fromAccount Assignment andProject PO

    Press the tab to view the same

    Finally Check on the Item OK button to ensure selecting the Item.

    Before Saving the document, Click on the Check Button to check the completeness of the

    document.

    Note-System shall give the messageDocument is OK

    Now Save the transaction.

    Result: Document posted. (Material document number shall be generated and also accounting document shall

    also be generated in the background. On display, in Doc. Information; accounting document can be seen.

  • 8/10/2019 5.MM-IM Material Movements

    23/226

    MM COURSE: IM MATERIAL MVT

    Page | 23

    5. MM-MIGO-GR-Goods Receipt against PO-Stock

    Overview

    Deliveries of Valuated material are required to be received from Vendors as a part of external procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    Valuated stock material is required to be received from Vendors against Purchase Order placed by thecompany. A goods movement is entered into the system referencing Purchase Order accordingly goodsreceipt material document is posted. Appropriate general ledger accounts-Company Stock Accounts arealso posted.

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-

    Following Fields-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Receipt w.r.t. PO)

    Delivery Note Vendors Invoice Number

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any Remarks

    Tips and Tricks

    When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for thistransaction.

    In case of any problem in the material found at the time of receiving after creating material document bymovement type 101 , simply reverse the material document by following transactions-

    Go to Transaction code-MBST or follow the menu path:Logistics Material Management Inventory

    ManagementMaterial Document Cancel/ReverseEnter- Posting date, Material document Number and Material document year and proceed further byentering followed by saving.

  • 8/10/2019 5.MM-IM Material Movements

    24/226

    MM COURSE: IM MATERIAL MVT

    Page | 24

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory Management

    Goods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the

    fields as specified in the below table:

    Fill the following for more details-

    Select GR purchase

    Movement

    t e101

  • 8/10/2019 5.MM-IM Material Movements

    25/226

    MM COURSE: IM MATERIAL MVT

    Page | 25

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    PostingDate

    Default is current systemdate

    R No user input Todays datedefaults in

    DeliveryNote

    Delivery Note number-Vendor Invoice Number.

    R Enter details of VendorsInvoice/Challan number.

    Bill oflading

    Number of the bill of ladingissued by the sender.

    O Enter bill of lading number ifavailable.

    Not Required

    Notes Document header text.Contains explanations or

    notes which apply to thedocument as a whole.

    O Use for Any remarks

    Movementtype

    Goods movement type.-Automatically if GR isagainst PO

    Auto Movement Type number shallautomatically come to 101 ifGR is against PO & stock

    TypeUnrestricted

    Movementtype is 101forgoods receipt

    against PO

    In the Material TAB

    Material Material Code/number Auto Automatically from PO

    In quantity tab

    Quantity Quantity received R Automatically from PO,However check it if it need to

    be changed at the time ofreceipt depending on partialquantity.

    QuantityIn

    DeliveryNote

    Quantity as per VendorChallan Number

    R Quantity as per VendorsChallan number to track

    Over/Shortage Report.

    No ofContainers

    Number of ContainersReceived

    O Optional in case to track no.of containers received from

    Vendors.

    In the Where Tab

    Plan Plant number. Autofrom

    PO

    Shall be automatically comefrom PO.

    If the plant isleft blank, it

    will bepicked up

  • 8/10/2019 5.MM-IM Material Movements

    26/226

    MM COURSE: IM MATERIAL MVT

    Page | 26

    Before Saving the document, Click on the Check Button to check the completeness of the

    document.

    Note-System shall give the messageDocument is OK

    Now, Save the transaction.

    Result: Document posted. (Material document number shall be generated and also Accounting document shall

    also be generated in the background. On display, in Doc. Information; Accounting document can be seen.

    from the

    purchase

    order.Storagelocation

    Storage location R Enter or select a storagelocation if not entered in the

    PO

    Goods

    Recipient

    Name of person receiving

    Goods

    O Name of person/Say Stock

    Receiver

    UnloadingPoint

    Unloading Point name O The place in the StorageLocation/Receipt Bay

    Text Any Remarks for material O Write any notes for material if

    required.

    In thePurchase

    OrderTAB

    Information related to POshall appear.

    In the

    PartnerTab

    Vendor Name shall appear.

    Finally Check on the Item OK button to ensure selecting the Item.

  • 8/10/2019 5.MM-IM Material Movements

    27/226

    MM COURSE: IM MATERIAL MVT

    Page | 27

    6. MM-MIGO-GR-Goods Receipt against PO-towards direct Capital

    Overview

    Deliveries of Direct Charge-Capital material is required to be received from Vendors as a part of external

    procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    Capital material is required to be received from Vendors against Purchase Order placed by the company.A goods movement is entered into the system referencing others accordingly goods receipt materialdocument is posted. Appropriate general ledger accounts-Company Stock Accounts are also posted. Onreceipt there shall not be Stock in the system as the material of the Direct Charge category shall be treated

    as Capitalized.

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-Following Fields are required to be maintained-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Receipt w.r.t. PO)Delivery Note Vendors Invoice Number

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any Remarks

    Excise Invoice Select Only Part1

    OutputResults CommentsThe output is a material documentwhich can contain accounting

    documents.

    This document number can be used for further processing.

    Tips and Tricks

    When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for thistransaction.

  • 8/10/2019 5.MM-IM Material Movements

    28/226

    MM COURSE: IM MATERIAL MVT

    Page | 28

    In case of any problem in the material found at the time of receiving after creating material document bymovement type 101 , simply reverse the material document by following transactions-

    Go to Transaction code-MBST or follow the menu path:Logistics Material Management InventoryManagementMaterial Document Cancel/ReverseEnter- Posting date, Material document Number and Material document year and proceed further byentering followed by saving.

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory ManagementGoods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the

    fields as specified in the below table:

  • 8/10/2019 5.MM-IM Material Movements

    29/226

    MM COURSE: IM MATERIAL MVT

    Page | 29

    FieldName

    Description R/O/C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    PostingDate

    Default is current systemdate

    R No user input Todays datedefaults in

    DeliveryNote

    Delivery Note number-Vendor Invoice Number.

    R Enter details of VendorsInvoice/Challan number.

    Bill oflading

    Number of the bill of ladingissued by the sender.

    O Enter bill of lading number ifavailable.

    Not Required

    Notes Document header text.Contains explanations or

    notes which apply to thedocument as a whole.

    O Use for Any remarks

    ExciseInvoice

    Excise Invoice, date, excisegroup.

    R Select Only Part1, Excise Group63 defaultsin

    Movement

    type

    Goods movement type.-

    automatically from PO

    Auto Movement Type number shall

    automatically come to 101 ifGR is against PO

    Movement

    type is 101forgoods receipt

    Select GR purchase

    Movement

  • 8/10/2019 5.MM-IM Material Movements

    30/226

    MM COURSE: IM MATERIAL MVT

    Page | 30

    against PO

    In the Material TAB

    Material Material Code/number Auto Automatically from PO

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    In the quantity tab

    Quantity Quantity received R Automatically from PO,

    However check it if it need tobe changed at the time of

    receipt depending on partialquantity.

    Quantity

    InDelivery

    Note

    Quantity as per Vendor

    Challan Number

    R Quantity as per Vendors

    Challan number to trackOver/Shortage Report.

    No ofContainers

    Number of ContainersReceived

    O Optional in case to track no.of containers received fromVendors.

    In the Where Tab

    Plant Plant number. AutofromPO

    Shall be automatically comefrom PO.

    If the plant isleft blank, itwill be

    picked upfrom the

    purchaseorder.

    Storagelocation

    Storage location R Enter or select a storagelocation if not entered in thePO

    Goods

    Recipient

    Name of person receiving

    Goods

    O Name of person/Say Stock

    Receiver

    UnloadingPoint

    Unloading Point name O The place in the StorageLocation/Receipt Bay

    Text Any Remarks for material O Write any notes for material if

    required.

    In thePurchaseOrder

    TAB

    Information related to POshall appear.

    Press the tab to view the same

  • 8/10/2019 5.MM-IM Material Movements

    31/226

    MM COURSE: IM MATERIAL MVT

    Page | 31

    (Note: On the above table, in column R/O/C; R = required, O = Optional, C = Conditional)

    Before Saving the document, Click on the Check Button to check the completeness of the

    document.

    Note- System shall give the messageDocument is OK

    Now Save the transaction.

    Result: Document posted. (Material document number shall be generated and also Accounting document shall

    also be generated in the background. On display, in Doc. Information; Accounting document can be seen.

    In the

    Partner

    Tab

    Vendor Name shall appear. Press the tab to view the same

    In theAccount

    Assignment Tab

    G/L Account &Asset number field shall be

    appeared. Values shall beautomatically picked fromAccount Assignment.

    Press the tab to view the same

    Finally Check on the Item OK button to ensure selecting the Item.

  • 8/10/2019 5.MM-IM Material Movements

    32/226

    MM COURSE: IM MATERIAL MVT

    Page | 32

    7. MM-MIGO-GR-Goods Receipt against PO-towards Project Stock Capital

    Overview

    Deliveries of Project Stock Capital material is required to be received from Vendors as a part of external

    procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    Project Capital material is required to be received from Vendors against Purchase Order placed by thecompany. A goods movement is entered into the system referencing others accordingly goods receiptmaterial document is posted. Appropriate general ledger accounts-Company Stock Accounts are also

    posted. On receipt of the Project Capital Material, project stock will be increased.

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-Following Fields are required to be maintained-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Q Receipt w.r.t. PO)Delivery Note Vendors Invoice Number

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any RemarksExcise Invoice Select Only Part1

    Tips and Tricks

    When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for this

    transaction.

    In case of any problem in the material found at the time of receiving after creating material document by

    movement type 101 , simply reverse the material document by following transactions-

    Go to Transaction code-MBST or follow the menu path:Logistics Material Management Inventory

    ManagementMaterial Document Cancel/ReverseEnter- Posting date, Material document Number and Material document year and proceed further by

    entering followed by saving.

  • 8/10/2019 5.MM-IM Material Movements

    33/226

    MM COURSE: IM MATERIAL MVT

    Page | 33

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory Management

    Goods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in thefields as specified in the below table:

    Movement type-

    101Q

    Select GR-

    Enter only qty and storage

    location other data will be

  • 8/10/2019 5.MM-IM Material Movements

    34/226

    MM COURSE: IM MATERIAL MVT

    Page | 34

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    PostingDate

    Default is current systemdate

    R No user input Todays datedefaults in

    DeliveryNote

    Delivery Note number-Vendor Invoice Number.

    R Enter details of VendorsInvoice/Challan number.

    Bill oflading

    Number of the bill of ladingissued by the sender.

    O Enter bill of lading number ifavailable.

    Not Required

    Notes Document header text.Contains explanations or

    notes which apply to thedocument as a whole.

    O Use for Any remarks

    ExciseInvoice

    Excise Invoice, date, excisegroup.

    R Select Only Part1, Excise Group63 defaultsin

    Movementtype

    Goods movement type. Automatic

    ally

    Movement Type number shallautomatically come to 101 if

    GR is against PO & stockTypeQ in case of ProjectCapital Stock.

    Movementtype is 101

    with StockType Q forgoods receiptagainst PO

    for ProjectCapital.

    In theMaterialTAB

    Material Material Code/number Auto Automatically from PO

    (Note: On the above table, in column R/O/C; R = required, O = Optional, C = Conditional)

    Press the ENTER button.

  • 8/10/2019 5.MM-IM Material Movements

    35/226

    MM COURSE: IM MATERIAL MVT

    Page | 35

    On screen Goods Receipt: Selection Screen

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    In the quantity tab

    Quantity Quantity received R Automatically from PO,However check it if it need to

    be changed at the time ofreceipt depending on partialquantity.

    QuantityIn

    DeliveryNote

    Quantity as per VendorChallan Number

    R Quantity as per VendorsChallan number to track

    Over/Shortage Report.

    No of

    Containers

    Number of Containers

    Received

    O Optional in case to track no.

    of containers received fromVendors.

    In the Where Tab

    Plant Plant number. Auto

    fromPO

    Shall be automatically come

    from PO.

    If the plant is

    left blank, itwill be

    picked up

    from thepurchase

    order.Storage

    location

    Storage location R Enter or select a storage

    location if not entered in thePO

    GoodsRecipient

    Name of person receivingGoods

    O Name of person/Say StockReceiver

    UnloadingPoint

    Unloading Point name O The place in the StorageLocation/Receipt Bay

    Text Any Remarks for material O Write any notes for material ifrequired.

    In thePurchase

    OrderTAB

    Information related to POshall appear.

    Press the tab to view the same

    In thePartner

    Tab

    Vendor Name shall appear. Press the tab to view the same

  • 8/10/2019 5.MM-IM Material Movements

    36/226

    MM COURSE: IM MATERIAL MVT

    Page | 36

    In the

    Account

    Assignment Tab

    G/L Account &

    WBS Element field shall be

    appeared. Values shall beautomatically picked fromAccount Assignment andProject PO

    Press the tab to view the same

    Finally Check on the Item OK button to ensure selecting the Item.

    Before Saving the document, Click on the Check Button to check the completeness of the

    document.

    System shall give the messageDocument is OK

    Now Save the transaction.

    Result: Document posted. (Material document number shall be generated and also Accounting document shall

    also be generated in the background. On display, in Doc. Information; Accounting document can be seen.

  • 8/10/2019 5.MM-IM Material Movements

    37/226

    MM COURSE: IM MATERIAL MVT

    Page | 37

    8. MM-MIGO-GR-Goods Receipt against PO-towards Subcontracting & Repai

    Overview

    Deliveries of subcontracting material are required to be received from Vendors as a part of subcontracting

    procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    Subcontracting material is required to be received from Vendors against Purchase Order placed by thecompany. A goods movement is entered into the system referencing others accordingly goods receiptmaterial document is posted. During the Receipt of the subcontracting material, Inputted material as sentto vendor for subcontracting automatically gets credited / reconciled.

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-Following Fields are required to be maintained-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Receipt w.r.t. PO)Delivery Note Vendors Invoice Number

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any RemarksExcise Invoice Select Only Part1

    Tips and Tricks

    When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for this

    transaction.

    In case of any problem in the material found at the time of receiving after creating material document by

    movement type 101 , simply reverse the material document by following transactions-

    Go to Transaction code-MBST or follow the menu path:Logistics Material Management Inventory

    ManagementMaterial Document Cancel/ReverseEnter- Posting date, Material document Number and Material document year and proceed further by

    entering followed by saving.

  • 8/10/2019 5.MM-IM Material Movements

    38/226

    MM COURSE: IM MATERIAL MVT

    Page | 38

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory Management

    Goods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the

    fields as specified in the below table:

    Enter the

    reci ient name

    Enter the text.

  • 8/10/2019 5.MM-IM Material Movements

    39/226

    MM COURSE: IM MATERIAL MVT

    Page | 39

    Fill the following data for detail.

    FieldName

    Description R/O/C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    PostingDate

    Default is current systemdate

    R No user input Todays datedefaults in

    DeliveryNote

    Delivery Note number-Vendor Invoice Number.

    R Enter details of VendorsInvoice/Challan number.

    Bill oflading

    Number of the bill of ladingissued by the sender.

    O Enter bill of lading number ifavailable.

    Not Required

    Notes Document header text.

    Contains explanations ornotes which apply to thedocument as a whole.

    O Use for Any remarks

    ExciseInvoice

    Excise Invoice, date, excisegroup.

    R Select Only Part1, Excise Group63 defaults

    in

    Movement

    type

    Goods movement type-

    automatically from PO

    Auto Movement Type number shall

    automatically come to 101 ifGR is against PO & stockTypeUnrestricted

    Movement

    type is 101forgoods receiptagainst PO

    In the Material TAB

    Material Material Code/number-

    Output Material

    Auto Automatically from PO

    Input Material-Automaticallycredited/reconciled.

    In the Quantity Tab

    Quantity Quantity received R Automatically from PO,However check it if it need to

    be changed at the time ofreceipt depending on partialquantity.

    QuantityInDelivery

    Note

    Quantity as per VendorChallan Number

    R Quantity as per VendorsChallan number to trackOver/Shortage Report.

    No ofContainers

    Number of ContainersReceived

    O Optional in case to track no.of containers received from

    Vendors.

    In theWhere

  • 8/10/2019 5.MM-IM Material Movements

    40/226

    MM COURSE: IM MATERIAL MVT

    Page | 40

    Before Saving the document, Click on the Check Button to check the completeness of the

    document.

    System shall give the messageDocument is OK

    Now Save the transaction.

    Result: Document posted. (Material document number shall be generated and also Accounting document shall

    also be generated in the background. On display, in Doc. Information; Accounting document can be seen.

    Tab

    Plant Plant number. Auto

    fromPO

    Shall be automatically come

    from PO.

    If the plant is

    left blank, itwill be

    picked up

    from thepurchaseorder.

    Storage

    location

    Storage location R Enter or select a storage

    location if not entered in thePO

    GoodsRecipient

    Name of person receivingGoods

    O Name of person/Say StockReceiver

    Unloading

    Point

    Unloading Point name O The place in the Storage

    Location/Receipt BayText Any Remarks for material O Write any notes for material if

    required.

    In thePurchase

    OrderTAB

    Information related to POshall appear.

    Press the tab to view the same

    In thePartner

    Tab

    Vendor Name shall appear. Press the tab to view the same

    Finally Check on the Item OK button to ensure selecting the Item.

  • 8/10/2019 5.MM-IM Material Movements

    41/226

    MM COURSE: IM MATERIAL MVT

    Page | 41

    9. MM-MIGO-GR-Goods Receipt against PO-with Account Assignment

    Overview

    Deliveries of Direct Charge-Revenue material is required to be received from Vendors as a part of external

    procurement.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    Direct Charge material is required to be received from Vendors against Purchase Order placed by thecompany. A goods movement is entered into the system referencing others accordingly goods receiptmaterial document is posted. On receipt there shall not be Stock in the system as the material of theDirect Charge category shall be treated as Consumed.

    InputRequired Fields Field Values/CommentsPurchase Order Number PO number

    After Pressing Execute Button-Following Fields are required to be maintained-

    Document Date (MM/DD/YY) Date that the document is entered

    Posting Date (MM/DD/YY) Date that the document is posted

    Movement Type Movement type to be used (101-Receipt w.r.t. PO)Delivery Note Vendors InvoiceNumber

    Bill of Lading Bill of Lading in case of Imports, otherwise leave blank

    Notes Any Remarks

    OutputResults CommentsThe output is a material document

    which can contain accountingdocuments.

    Tips and Tricks

    When a receipt is entered in SAP, it must reference to Purchase Order Only

    To reverse by material document follow the menu path:Logistics Material Management Inventory

    Management Material Document Cancel/Reverse. The material document is needed for this

    transaction.

    In case of any problem in the material found at the time of receiving after creating material document by

  • 8/10/2019 5.MM-IM Material Movements

    42/226

    MM COURSE: IM MATERIAL MVT

    Page | 42

    movement type 101 , simply reverse the material document by following transactions-

    Go to Transaction code-MBST or follow the menu path:Logistics Material Management InventoryManagementMaterial Document Cancel/ReverseEnter- Posting date, Material document Number and Material document year and proceed further byentering followed by saving.

    Procedural Steps

    Access transaction by:

    Via Menus LogisticsMaterial Management Inventory ManagementGoods Movement MIGO

    Via Transaction Code MIGO

    On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the

    fields as specified in the below table:

  • 8/10/2019 5.MM-IM Material Movements

    43/226

    MM COURSE: IM MATERIAL MVT

    Page | 43

    FieldName

    Description R/O/C

    User Action and Values Comments

    DocumentDate

    Default is current systemdate

    R Date of the actual vendordelivery (physical delivery).

    Todays datedefaults in

    PostingDate

    Default is current systemdate

    R No user input Todays datedefaults in

    DeliveryNote

    Delivery Note number-Vendor Invoice Number.

    R Enter details of VendorsInvoice/Challan number.

    Bill of

    lading

    Number of the bill of lading

    issued by the sender.

    O Enter bill of lading number if

    available.

    Not Required

    Notes Document header text.

    Contains explanations ornotes which apply to thedocument as a whole.

    O Use for Any remarks

    Movementtype

    Goods movement typeautomatically from PO

    Auto Movement Type number shallautomatically come to 101 ifGR is against PO & stockTypeUnrestricted

    Movementtype is 101forgoods receiptagainst PO

    In the Material TAB

    Material Material Code/number Auto Automatically from PO

    In the Quantity Tab

    (Note: On the above table, in column R/O/C; R = required, O = Optional, C = Conditional)

    FieldName

    Description R/O/C

    User Action and Values Comments

    Quantity Quantity received R Automatically from PO,However check it if it need to

    be changed at the time ofreceipt depending on partial

    quantity.

    QuantityInDelivery

    Note

    Quantity as per VendorChallan Number

    R Quantity as per VendorsChallan number to trackOver/Shortage Report.

    No ofContainers

    Number of ContainersReceived

    O Optional in case to track no.of containers received fromVendors.

    In theWhere

    Tab

  • 8/10/2019 5.MM-IM Material Movements

    44/226

    MM COURSE: IM MATERIAL MVT

    Page | 44

    Plant Plant number. Auto

    from

    PO

    Shall be automatically come

    from PO.

    If the plant is

    left blank, it

    will bepicked upfrom the

    purchase

    order.

    Storagelocation

    Storage location R Enter or select a storagelocation if not entered in thePO

    GoodsRecipient

    Name of person receivingGoods

    O Name of person/Say StockReceiver

    UnloadingPoint

    Unloading Point name O The place in the StorageLocation/Receipt Bay

    Text Any Remarks for material O Write any notes for material ifrequired.

    In the

    PurchaseOrderTAB

    Information related to PO

    shall appear.

    Press the tab to view the same

    In thePartner

    Tab

    Vendor Name shall appear. Press the tab to view the same

    In theAccount

    Assignment Tab

    G/L AccountCost Center field shall be

    appeared. Values shall beautomatically picked fromAccount Assignment.

    Press the tab to view the same

    Finally Check on the Item OK button to ensure selecting the Item.

    Before Saving the document, Click on the Check Button to check the completeness of the

    document.

  • 8/10/2019 5.MM-IM Material Movements

    45/226

  • 8/10/2019 5.MM-IM Material Movements

    46/226

    MM COURSE: IM MATERIAL MVT

    Page | 46

    10. MM-MIGO-GR-Return delivery to Vendor against Rejection

    Overview

    When Rejected goods are required to send back to the Supplier.

    BUSINESS PROCESS PROCEDURE OVERVIEW

    The Rejected materials posted to blocked stock in a Storage Location have to be cleared and returned to

    Vendors as soon as possible as the blocked stock are the valuated stock of the plant and dont reflect in

    PO open quantity. Purchase department and Stores should periodically (max weekly) review the blockedstock and take action to return them back to vendors.

    InputRequired Fields Field Values/Comments

    Document Date (MM/DD/YY)

    Posting Date (MM/DD/YY)Movement TypePlant

    Storage locationMaterial

    QuantityUnEPurchase Order

    Reason for Movement

    Date that the document is entered.

    Date that the document is posted.Movement type to be used.The plant of manufacture.

    Location from which material will be issued.Material to be issued to the manufacturing order.

    Quantity of material to be issued.Unit of measure for material to be issued.Purchase Order Number

    Reason for Movement

    Vendor Vendor Number to which the goods need to be issued.

    Output - Results CommentsThe output is a material document. Each time an inventory movement is posted a Material document

    is created by the system. If the movement has a financial impactan Accounting document is also created.

    Tips and Tricks

    It is sometimes necessary to reverse a goods issue due to user error. For example, an incorrect quantity is entered

    or the wrong Reservation was chosen. Within SAP, there are two different ways to reverse a goods movement. One

  • 8/10/2019 5.MM-IM Material Movements

    47/226

    MM COURSE: IM MATERIAL MVT

    Page | 47

    is done via a material document. Another is done through a movement type. Reversing goods movements using

    movement types are the same as the initial movement types +1.

    Procedural Steps

    Access transaction by:

    Via Menus a) Logistics > Material Management > InventoryManagement> Goods Movement > MaterialDocument>Return Delivery

    Via Transaction Code MIGO

    Choose Return Delivery from the Drop-Down Menu and we will get Return Delivery

    Material Document Screen...

    On screen Return Delivery Material Document,fill in the following fields:

    Select Return Delivery

    Select Material Document

    Enter the Material Document

  • 8/10/2019 5.MM-IM Material Movements

    48/226

    MM COURSE: IM MATERIAL MVT

    Page | 48

    Please note, the fields that appear and those that are required are completely dependent

    upon the movement type selected by the user.

    Field

    Name

    Description R/O/

    C

    User Action and Values Comments

    Moveme

    nt type

    Defines type of movement to

    be performed by thetransaction

    View Enter Mvt type -122

    Document Date

    Current /System Date Default

    PostingDate

    Current Date-Change as perrequirement

    R Date of actual Goods Returnposting. This determines the

    Accounting posting date.

    Doc

    HeaderText

    Text as per requirement O Enter any Text information

    PurchaseOrder

    Purchase Order Number R Enter PO number

    Sloc Storage location R Defaults from previousscreen.

    Plant Plant location. R Defaults from previousscreen.

    Material Material to be issued R Enter material issued.

    Quantity Quantity of material to be

    issued

    R Enter rejected quantity of

    material.StockType

    Type of Stock-Blockedwhere rejected material is

    lying

    R SBlocked Stock.

    You must be more carefulhere. By mistake had you putX your Un-restricted Stockwill get reduced instead ofBlocked stock as SAP

    provides flexibility. We willhave to ensure that onlycorrect stock type is enteredhere.

    Reasonfor

    Movement

    Reason for Rejection R Choose from available option

    Text Short Text if you want toenter specifically about thistransaction

    O

  • 8/10/2019 5.MM-IM Material Movements

    49/226

    MM COURSE: IM MATERIAL MVT

    Page | 49

    Press the ENTER button or select the green checkmark icon.

    Save the transaction using the Save button or press Control S.

    Note-System shall generate Material Document number.

  • 8/10/2019 5.MM-IM Material Movements

    50/226

    MM COURSE: IM MATERIAL MVT

    Page | 50

    11. MM-ZMMP_SFGS-Goods Movement of Serialized Material---------------------------------------------------------------------------------------------------------------------------------------------------------

    12. MM-MB90 GR note print out

    Overview

    A Goods receipts note needs to be printed

    Business Process Procedure Overview

    This procedure details how to print a GR note created in R/3 by T code MB90

    InputRequired Fields Field Value/Comments

    Message Data Details the type of message to print.

    Output - Results Comments

    A successfully printed GR note

    Procedural Steps

    Access transaction by:

    Via Transaction Code MB90

  • 8/10/2019 5.MM-IM Material Movements

    51/226

    MM COURSE: IM MATERIAL MVT

    Page | 51

    On screen out put for goods movement, enter information in the fields as specified in

    the table below:

    Select output type ZGR

    Enter material

    document number

    Select transmission

    medium,sort order.

  • 8/10/2019 5.MM-IM Material Movements

    52/226

    MM COURSE: IM MATERIAL MVT

    Page | 52

    Select the proper document number and click execute

    Select proper printer and click on print

    Select the proper document.

  • 8/10/2019 5.MM-IM Material Movements

    53/226

    MM COURSE: IM MATERIAL MVT

    Page | 53

    Press Enter

    GR note will be as below.

    Click print

    Print preview can be

    seen from here

    Select the printer

  • 8/10/2019 5.MM-IM Material Movements

    54/226

    MM COURSE: IM MATERIAL MVT

    Page | 54

  • 8/10/2019 5.MM-IM Material Movements

    55/226

    MM COURSE: IM MATERIAL MVT

    Page | 55

    13. MM-MIGO-GR-Goods Receipt in case of Excisable Subcontracting Challan

    Overview

    Goods receipt when material comes after subcontracting

    Business Process Description Overview

    You follow this procedure if you want to take the Print Output of Excisable Subcontracting Challan

    Input - Required Fields Field Value / Comments

    Purchase Order Number Required

    Challan Number Required

    Challan Year Required

    Output - Results CommentsSubcontracting Challan Print Output

    Procedure Steps

    Access transaction by:

    Via Menus Logistics Materials Management InventoryManagement Goods Movement Goods Receipt

    Via Transaction CodeMIGO

    On screen Goods Receipt Purchase Order, type the values as per table below.

  • 8/10/2019 5.MM-IM Material Movements

    56/226

    MM COURSE: IM MATERIAL MVT

    Page | 56

    Field Name Description R/O/C User Action and Values Comments

    PurchaseOrder Number

    Enter the Purchase OrderNumber

    R Enter Subcontracting PurchaseOrder

    As soon as you press Enter system will show the complete Subcontracting PO DataBy Default you will find the material which will come

    You will come to know the input material consumed by clicking on the .

    First enter the quantity of the Material which is comingthen click on the tab by doing this system willautomatically show you the quantity of Input Material in correct ratio.

    If you click on the tab first then enter the quantity of material which come then you have to enter thequantity of Input material consumed manually.

    Enter Purchase Order

  • 8/10/2019 5.MM-IM Material Movements

    57/226

    MM COURSE: IM MATERIAL MVT

    Page | 57

    Details of Material which comes

    Tick here to receive the material

    after subcontracting

  • 8/10/2019 5.MM-IM Material Movements

    58/226

    MM COURSE: IM MATERIAL MVT

    Page | 58

    Now we have to refer the Subcontracting Challan (on which we send the input material to subcontractor) duringGoods Receipt. Excise tab will come by default if following prerequisites are fulfilled:

    1. Chapter ID/ Excise Tariff Code is maintained in the Material Master in the Foreign Trade Import view for theinput material

    2. Material is declared for Subcontracting in the Material Master in the Foreign Trade Import view

    3. Output material is defined for the input material in the Material Master in the foreign Trade Import View4. Plant Excise data, Excise Group, Series Group is maintained

    Material which is coming from

    Input Material which will be

    Tick here to consume the input

  • 8/10/2019 5.MM-IM Material Movements

    59/226

    MM COURSE: IM MATERIAL MVT

    Page | 59

    Select the option - Refer

  • 8/10/2019 5.MM-IM Material Movements

    60/226

    MM COURSE: IM MATERIAL MVT

    Page | 60

    Click here to refer the

  • 8/10/2019 5.MM-IM Material Movements

    61/226

    MM COURSE: IM MATERIAL MVT

    Page | 61

    Enter Challan Number and Year

    After entering Challan Number

    and Year ress this button

  • 8/10/2019 5.MM-IM Material Movements

    62/226

    MM COURSE: IM MATERIAL MVT

    Page | 62

    Tick on Collective slip to take the

    Print of Goods Recei t

    After that press Check and Post

  • 8/10/2019 5.MM-IM Material Movements

    63/226

    MM COURSE: IM MATERIAL MVT

    Page | 63

    After Posting you will get

    material document number

  • 8/10/2019 5.MM-IM Material Movements

    64/226

    MM COURSE: IM MATERIAL MVT

    Page | 64

    2. Reservation

    1. MM-MB21-Create Reservation for Revenue Consumption

    Overview

    In case of any material is required by the users, a reservation will be created by the user in the system if stock isavailable in the store.

    Business Process Procedure OverviewA Reservation will be created by user whenever goods have to be withdrawn / issued from Stores. User

    will create reservation manually or automatically depending upon nature of issue. Manual Reservation

    will be created by user for issue of items which are not required for specific job; rather these items are

    of common nature like marking cloth, cotton waste, adhesives, miscellaneous items, stationery etc.

    However, for equipment and parts, Reservation will be created automatically from PS-Projects; and for

    spares, Reservation will be created automatically through PM order by maintenance group.

    A reservation document serves as purpose of Material Issue Requisition.

    SAP supports manual and automatic reservations. Manual reservations are entered directly by the

    user.

    Check the availability of materials through stock overview screen at the time of creating

    reservations. However, the system also conducts a dynamic availability check at the time of

    reservation creation and correspondingly issues a warning message in case of unavailability of stock

    for desired date.

    In the material master record, total stock and unrestricted-use stock of the material remain

    unchanged. Reserved stock is increased by the reserved quantity.

    Input Required Fields Field Value/Comments

    Base Date Enter the date (default)

    Movement Type 201-For Cost Center Consumption

    Plant Plant where the reservation will occur.

  • 8/10/2019 5.MM-IM Material Movements

    65/226

    MM COURSE: IM MATERIAL MVT

    Page | 65

    Material Material of requirement.

    Quantity Qty required.Storage Location Issuing storage location.

    Cost Centre Put the relevant cost center

    Requisitioner Put the name / initials of User

    Header Text Put the name of dept.

    Tips and Tricks

    Depending on the users movement type, the system may ask the user for the cost center for the reservation to be

    made.

    Procedural Steps

    Access transaction by:

    Via Menus a) Logistics > Materials Management > Inventory Management>Reservations > Create

    b) Logistics > Production> DRP > Execution > Reservation >Create

    c) Logistics > Sales & Distribution Foreign Trade/CustomsGeneral Foreign Trade Processing > Environment> Purchase

    Import > Inventory Management >Reservations > Create

    Via Transaction Code MB21

    OutputResults Comments

    Creation of a reservation Creation of a reservation.

  • 8/10/2019 5.MM-IM Material Movements

    66/226

    MM COURSE: IM MATERIAL MVT

    Page | 66

    On screen Create Reservation: Initial Screen, enter the below information:

    Field Name Description R/O/C User Action and Values Comments

    Base Date Date for which the goodsmovement is planned

    R Current date is defaulted.

    MovementType

    Goods movement R Use drop-down menu to makethe choice of the applicable

    movement type.

    Plant Plant number R Use the drop-down menu to

    make the choice of theappropriate plant

    Reservation Reservation number from

    which reservation will becopied with reference to

    O

    Reference Section Heading

    G/Laccount

    No of the G/L account towhich the movement isassigned.

    O Use the drop-down menu tomake the choice of theappropriate G/L account.

    Cost center Cost center for the materialaccounting

    R Use the drop-down menu tomake the choice of theappropriate cost center.

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    Enter movement type 201

  • 8/10/2019 5.MM-IM Material Movements

    67/226

    MM COURSE: IM MATERIAL MVT

    Page | 67

    Press

    On screen Create Reservation: New Items, enter the below information:

    (Note: Some of the data on this screen depends upon the movement type that was specified on the initial

    screen).

    Enter the G/L account

    Enter the cost center

    Deselect if

    material

    movement is to

  • 8/10/2019 5.MM-IM Material Movements

    68/226

    MM COURSE: IM MATERIAL MVT

    Page | 68

    Field Name Description R/O/C User Action and Values Comments

    Material Material number R Enter the material identifier. Pull down table

    access.Quantity Material quantity R Enter the quantity of the

    material to be moved.

    The quantity is

    automaticallyconverted tostock-keeping

    units.

    UnE The unit of measure in whichthe goods movement is

    entered.

    O Enter the unit of measure ifdifferent than the default.

    Pull down tableaccess. The

    system will usethe default unitofmeasure (entry)

    if this field isleft blank.

    Plant Plant number C Defaults from the initial screen

    SLoc The storage location wherethe material is currentlystored.

    R Enter the storage location - ifnot entered on initial screen.

    Pull down tableaccess.

    M Indicator: Goods movementfor reservation allowed -

    Indicator specifying thatmovements are allowed in

    respect of the reservationitem.

    If the user wants toprevent a goodsmovement in respect of

    this reservation item, theuser must deselect thefield.If the user wants to allowa goods movement in

    respect of this reservationitem, select the field.

    O The default setting is to havethis indicator checked.

    Save the reservation. (Click on yellow file folder icon, or F11)

    Message Reservation XXXXXXXXXX createdis displayed in the status bar at bottom of

    screen.

    Exit Reservation processing. (Click on yellow up-facing arrow icon, or Shift-F3)

  • 8/10/2019 5.MM-IM Material Movements

    69/226

    MM COURSE: IM MATERIAL MVT

    Page | 69

    2. MM-MB21-Create Reservation for Transfer posting Mvt-913

    Overview

    In case of any material is required by the users, a reservation will be created by the user in the system if stock isavailable in the store.

    Business Process Procedure Overview

    A Reservation will be created by user whenever goods have to be withdrawn / issued from Stores. User

    will create reservation manually or automatically depending upon nature of issue. Manual Reservation

    will be created by user for issue of items which are not required for specific job; rather these items are

    of common nature like marking cloth, cotton waste, adhesives, miscellaneous items, stationery etc.

    However, for equipment and parts, Reservation will be created automatically from PS-Projects; and for

    spares, Reservation will be created automatically through PM order by maintenance group.

    A reservation document serves as purpose of Material Issue Requisition.

    SAP supports manual and automatic reservations. Manual reservations are entered directly by the

    user.

    Check the availability of materials through stock overview screen at the time of creating

    reservations. However, the system also conducts a dynamic availability check at the time of

    reservation creation and correspondingly issues a warning message in case of unavailability of stock

    for desired date.

    In the material master record, total stock and unrestricted-use stock of the material remain

    unchanged. Reserved stock is increased by the reserved quantity.

    Input Required Fields Field Value/Comments

    Base Date Enter the date (default)Movement Type 913

    Plant Plant where the reservation will occur.

    Material Material of requirement.

    Quantity Qty required.

    Storage Location Issuing storage location.

  • 8/10/2019 5.MM-IM Material Movements

    70/226

    MM COURSE: IM MATERIAL MVT

    Page | 70

    Header Text Put the name of dept.

    Procedural Steps

    Access transaction by:

    Via Menus d) Logistics > Materials Management > Inventory Management>Reservations > Create

    e) Logistics > Production> DRP > Execution > Reservation >Create

    f) Logistics > Sales & Distribution Foreign Trade/CustomsGeneral Foreign Trade Processing > Environment> Purchase

    Import > Inventory Management >Reservations > Create

    Via Transaction Code MB21

    On screen Create Reservation: Initial Screen, enter the below information:

    Output - Results Comments

    Creation of a reservation Creation of a reservation.

  • 8/10/2019 5.MM-IM Material Movements

    71/226

    MM COURSE: IM MATERIAL MVT

    Page | 71

    Field Name Description R/O/C User Action and Values Comments

    Base Date Date for which the goodsmovement is planned

    R Current date is defaulted.

    MovementType

    Goods movement R Use drop-down menu to makethe choice of the applicablemovement type.

    Plant Plant number R Use the drop-down menu tomake the choice of theappropriate plant

    Reservation Reservation number fromwhich reservation will becopied with reference to

    O

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C= Conditional)

    Press

    On screen Create Reservation: New Items, enter the below information:

    Enter the Movement Type

    Enter the Plant

  • 8/10/2019 5.MM-IM Material Movements

    72/226

    MM COURSE: IM MATERIAL MVT

    Page | 72

    (Note: Some of the data on this screen depends upon the movement type that was specified on the initial screen).

    Field Name Description R/O/C User Action and Values Comments

    Material Material number R Enter the material identifier. Pull down tableaccess.

    Quantity Material quantity R Enter the quantity of thematerial to be moved.

    The quantity isautomaticallyconverted to

    stock-keepingunits.

    UnE The unit of measure in whichthe goods movement isentered.

    O Enter the unit of measure ifdifferent than the default.

    Pull down tableaccess. Thesystem will usethe default unitof

    measure (entry)if this field is

    left blank.Plant Plant number C Defaults from the initial screen

    SLoc The storage location wherethe material is currentlystored.

    R Enter the storage location - ifnot entered on initial screen.

    Pull down tableaccess.

    M Indicator: Goods movementfor reservation allowed -Indicator specifying that

    movements are allowed in

    O The default setting is to havethis indicator checked.

    Enter the Receiving Sloc.

    Enter the material code &

    Qty

    Enter the Issuing SLoc.

  • 8/10/2019 5.MM-IM Material Movements

    73/226

    MM COURSE: IM MATERIAL MVT

    Page | 73

    respect of the reservation

    item.

    If the user wants toprevent a goodsmovement in respect ofthis reservation item, the

    user must deselect thefield.

    If the user wants to allowa goods movement inrespect of this reservationitem, select the field.

    Save the reservation. (Click on yellow file folder icon, or F11)

    Message Reservation XXXXXXXXXX createdis displayed in the status bar at bottom of

    screen.

    Exit Reservation processing. (Click on yellow up-facing arrow icon, or Shift-F3)

  • 8/10/2019 5.MM-IM Material Movements

    74/226

    MM COURSE: IM MATERIAL MVT

    Page | 74

    3. MM-MB21-Create Reservation for Transfer posting Mvt-915

    Overview

    In case of any material is required by the users, a reservation will be created by the user in the system if stock isavailable in the store.

    Business Process Procedure Overview

    A Reservation will be created by user whenever goods have to be withdrawn / issued from Stores. User

    will create reservation manually or automatically depending upon nature of issue. Manual Reservation

    will be created by user for issue of items which are not required for specific job; rather these items are

    of common nature like marking cloth, cotton waste, adhesives, miscellaneous items, stationery etc.

    However, for equipment and parts, Reservation will be created automatically from PS-Projects; and for

    spares, Reservation will be created automatically through PM order by maintenance group.

    A reservation document serves as purpose of Material Issue Requisition.

    SAP supports manual and automatic reservations. Manual reservations are entered directly by the

    user.

    Check the availability of materials through stock overview screen at the time of creating

    reservations. However, the system also conducts a dynamic availability check at the time of

    reservation creation and correspondingly issues a warning message in case of unavailability of stock

    for desired date.

    In the material master record, total stock and unrestricted-use stock of the material remain

    unchanged. Reserved stock is increased by the reserved quantity.

    Input Required Fields Field Value/Comments

    Base Date Enter the date (default)Movement Type 915

    Plant Plant where the reservation will occur.

    Material Material of requirement.

    Quantity Qty required.

    Storage Location Issuing storage location.

  • 8/10/2019 5.MM-IM Material Movements

    75/226

    MM COURSE: IM MATERIAL MVT

    Page | 75

    Header Text Put the name of dept.

    Procedural Steps

    Access transaction by:

    Via Menus g) Logistics > Materials Management > Inventory Management>Reservations > Create

    h) Logistics > Production> DRP > Execution > Reservation >Create

    i) Logistics > Sales & Distribution Foreign Trade/CustomsGeneral Foreign Trade Processing > Environment> Purchase

    Import > Inventory Management >Reservations > Create

    Via Transaction Code MB21

    On screen Create Reservation: Initial Screen, enter the below information:

    Output - Results Comments

    Creation of a reservation Creation of a reservation.

  • 8/10/2019 5.MM-IM Material Movements

    76/226

    MM COURSE: IM MATERIAL MVT

    Page | 76

    Field Name Description R/O/C User Action and Values Comments

    Base Date Date for which the goodsmovement is planned

    R Current date is defaulted.

    Movement

    Type

    Goods movement R Use drop-down menu to make

    the choice of the applicablemovement type.

    Plant Plant number R Use the drop-down menu to

    make the choice of theappropriate plant

    Reservation Reservation number fromwhich reservation will becopied with reference to

    O

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    Press

    On screen Create Reservation: New Items, enter the below information:

    Enter the Movement

    Enter the Plant

  • 8/10/2019 5.MM-IM Material Movements

    77/226

    MM COURSE: IM MATERIAL MVT

    Page | 77

    (Note: Some of the data on this screen depends upon the movement type that was specified on the initial screen).

    Field Name Description R/O/C User Action and Values Comments

    Material Material number R Enter the material identifier. Pull down tableaccess.

    Quantity Material quantity R Enter the quantity of thematerial to be moved.

    The quantity isautomatically

    converted tostock-keeping

    units.

    UnE The unit of measure in which

    the goods movement isentered.

    O Enter the unit of measure if

    different than the default.

    Pull down table

    access. Thesystem will use

    the default unitofmeasure (entry)

    if this field isleft blank.

    Plant Plant number C Defaults from the initial screen

    SLoc The storage location wherethe material is currentlystored.

    R Enter the storage location - ifnot entered on initial screen. Pull down tableaccess.

    M Indicator: Goods movementfor reservation allowed -

    Indicator specifying thatmovements are allowed in

    respect of the reservationitem.If the user wants to

    O The default setting is to havethis indicator checked.

  • 8/10/2019 5.MM-IM Material Movements

    78/226

  • 8/10/2019 5.MM-IM Material Movements

    79/226

    MM COURSE: IM MATERIAL MVT

    Page | 79

    4. MM-MB22-Change Reservations

    Overview

    User wishes to change a reservation.

    Business Process Procedure Overview

    This process describes the method to change a reservation within the R/3 system

    Input Required Fields Field Value/Comments

    Reservation number Enter the reservation number that you wants to change.

    Output - Results Comments

    Change the reservation Change the reservation

    Procedural Steps

    Access transaction by:

    Via Menus a) Logistics > Materials Management> Inventory Management >Reservations > Change

    b) Logistics > Production > DRP> Execution> Reservation >Change

    1 Logistics > Sales and Distribution > Foreign Trade /Customs >

    General Foreign Trade Processing >Environment> Purchase-

    Import> Inventory Management Reservation> Change

  • 8/10/2019 5.MM-IM Material Movements

    80/226

    MM COURSE: IM MATERIAL MVT

    Page | 80

    Via Transaction Code MB22

    On screen Change Reservation: Initial Screen, enter the below information:

    Field Name Description R/O/C User Action and Values Comments

    Reservation Reservation number R If number is unknown, conducta matchcode search for this

    number

    (Note: On above table, in column R/O/C; R= Required, O = Optional, C = Conditional)

    Press

    On screen Change Reservation #####: Collective Processing, enter the below

    information:

    Enter the Reservation

  • 8/10/2019 5.MM-IM Material Movements

    81/226

    MM COURSE: IM MATERIAL MVT

    Page | 81

    To add more items to the reservation:

    Click on the Create button

    Add all necessary additional information

    Press SAVE

    To change the date of the reservation:

    Click on the line item that needs to be changed

    Click on the radio button Details from. item

    Change the date

    Press SAVE

    You can Change the required

  • 8/10/2019 5.MM-IM Material Movements

    82/226

    MM COURSE: IM MATERIAL MVT

    Page | 82

    Save the reservation. (Click on yellow file folder icon, or F11)

    Message DocumentXXXXXXXXXX postedis displayed in the status bar at bottom of

    screen.

    Exit Reservation processing. (Click on yellow up-facing arrow icon, or Shift-F3)

  • 8/10/2019 5.MM-IM Material Movements

    83/226

    MM COURSE: IM MATERIAL MVT

    Page | 83

    5. MM-MB23-Display Reservations

    Overview

    User wishes to display a reservation.

    Business Process Procedure Overview

    This process describes the method to display a reservation within the R/3 system.

    The exact process for displaying a reservation will be slightly different depending upon which goodsmovement is being designated.

    This process describes the method to display a reservation within the R/3 system.

    Input - Required Fields Field Value/Comments

    Reservation number Enter the reservation number that you want to display.

    Output - Results CommentsDisplay the reservation Only display can be possible.

    Procedural Steps

    Access transaction by:

    Via Menus a) Logistics > Materials Management >Inventory Management> Reservations > Display

    b) Logistics > Production > DRP> Execution> Reservation >Display

    c) Logistics > Sales and Distribution > Foreign Trade /Customs

    > General Foreign Trade Processing >Environment>Purchase-Import> Inventory Management Reservation>Display

    Via Transaction Code MB23

    On screen Display Reservation: Initial Screen, enter the below information:

  • 8/10/2019 5.MM-IM Material Movements

    84/226

    MM COURSE: IM MATERIAL MVT

    Page | 84

    Field Name Description R/O/C User Action and Values Commen

top related