Transcript
8/17/2019 3 Pile Installation
1/10
1
Pile Installation
Pile installation is as important as design. In this
section, two types of methods:a)Installation by Driving
b)Installation by Boring
Are presented in the s bse! ent slides
8/17/2019 3 Pile Installation
2/10
"
Pile InstallationBefore going through pile installation methodsunderstand the following terminology.Driven pre-cast pile: The pile is castedin a yardbrought to the site and driven by some mechanism
into the soilDriven Cast-in-situ pile: A casing plugged at bottom isdriven into the ground and then the pile is casted byremoving or retaining the casing
Bored Pre-cast pile: A bore is made and the soil insideis removed and then a pile castedin some yard is putinto the boreBored Cast -in-situ pile: A bore is made the soil isremoved and the pile is castedat site in the bore .
8/17/2019 3 Pile Installation
3/10
#
nstallation by Driving
$han% &o
'If the driving has to be carried o t by hammer, thefollowing factors sho ld be ta%e into consideration.'$he si(e and weight of the pile'$he driving resistance which has to be overcome to
achieve the desired penetration'$he available space and head room in the site
beca se the hammer has to be dropped from certainheight and also the initial height is appro*imatelyheight of the pile + height of fall of the hammer)'$he availability of cranes'$he noise restrictions which may be in force in thelocality
8/17/2019 3 Pile Installation
4/10
nstallation by Driving
8/17/2019 3 Pile Installation
5/10
-
nstallation by Driving!ethods of pile driving' Dropping weight' "#plosion' $ibration
' %ac&ing ' only for micro piles(' %etting
8/17/2019 3 Pile Installation
6/10
nstallation by Boring
8/17/2019 3 Pile Installation
7/10
/
nstallation by Boring
8/17/2019 3 Pile Installation
8/10
0
Advantages and Disadvantages
8/17/2019 3 Pile Installation
9/10
Advantages and Disadvantages
8/17/2019 3 Pile Installation
10/10
12
Advantages and Disadvantages
top related