1Salinisation of the Kapuas Delta

Solutions for raw water intake during the dry season

- Introduction- Current situation- Long term & Short term Solutions- Criteria

Imput from:Cipta Karya (Province): Pak Angiat BWSK: Pak SapriPak Masryatno (former technical director)PDAM Kota Pontianak

2Salinisation of the Kapuas Delta

Introduction: characteristics of the treatment facility in Pontianak

2010 2017- Drinking water demand: 1,068 m3/s 1,769 m3/s - Production capacity 1,21 m3/s 1,51 m3/s- Production capacity in the dry season: 300 l/s 1300 l/s- Costumers coverage: 60% 90%- Population growth: 2,74 %/year 2,74 %/year

3Salinisation of the Kapuas Delta

(Technical) Problems during the dry season

- During the extreme events of 1997 and 2002 (resp. 110 and 80 days) the pipe to Penepat (24 km upstream) was only 20-30% of the time operational due to:

- Lack of fuel

- Mechanical failure of the pumps

- Leakage of the transport pipe

- Beside these problems there is a capacity deficit of approx.

900 l/s

4Salinisation of the Kapuas Delta

New transport pipe to Penepat- New transport pipe to Penepat (under construction)

Capacity: - Current Pipe (d=600 mm) = 300 l/s (v = 1 m/s)

- New Pipe (d=800) = 500 l/s (v = 1 m/s) - In Holland the transport velocity of 1 m/s is normal)

5Salinisation of the Kapuas Delta

A sustainable solution for the future?

6Salinisation of the Kapuas Delta

Short term / Long term

7Salinisation of the Kapuas Delta

Scope of solutionsShort term-Intake further upstream-Optimise capacity WTPs and decrease leakage-Update Penepat intake, including reservoir or extend pipeline to Biyung

Long term-Blocking salt water from the sea-Create fresh water reservoir for the dry period-Flushing KK by constructing canal Sukalanting

8Salinisation of the Kapuas Delta

Stop sea water from entering the river system

Construct a dam, must be able toRegulate river dischargePass the ships

It depends on the functional requirements

Location: River mouth (Jungkat) or Ambawang (idea of Prof. Arwin)

9Salinisation of the Kapuas Delta

A fresh water reservoir1.26 m3/s = 150,000 m3/day (in combination with Penepat)Dry season = 110 days

Reservoir: 12,000,000 m3

When you fill it up to two meters you need an area of approx. 600 ha.

10Salinisation of the Kapuas Delta

Flushing the Kapuas Kecil in the dry season

- Construct a bypass in the river near Sukalanting (not as simple as it looks like)

11Salinisation of the Kapuas Delta

Criteria Feasibility