1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions - Criteria Imput from: Cipta Karya (Province): Pak Angiat BWSK: Pak Sapri Pak Masryatno (former technical director) PDAM Kota Pontianak
11
Embed
1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1Salinisation of the Kapuas Delta
Solutions for raw water intake during the dry season
- Introduction- Current situation- Long term & Short term Solutions- Criteria
Imput from:Cipta Karya (Province): Pak Angiat BWSK: Pak SapriPak Masryatno (former technical director)PDAM Kota Pontianak
2Salinisation of the Kapuas Delta
Introduction: characteristics of the treatment facility in Pontianak
2010 2017- Drinking water demand: 1,068 m3/s 1,769 m3/s - Production capacity 1,21 m3/s 1,51 m3/s- Production capacity in the dry season: 300 l/s 1300 l/s- Costumers coverage: 60% 90%- Population growth: 2,74 %/year 2,74 %/year
3Salinisation of the Kapuas Delta
(Technical) Problems during the dry season
- During the extreme events of 1997 and 2002 (resp. 110 and 80 days) the pipe to Penepat (24 km upstream) was only 20-30% of the time operational due to:
- Lack of fuel
- Mechanical failure of the pumps
- Leakage of the transport pipe
- Beside these problems there is a capacity deficit of approx.
900 l/s
4Salinisation of the Kapuas Delta
New transport pipe to Penepat- New transport pipe to Penepat (under construction)
Capacity: - Current Pipe (d=600 mm) = 300 l/s (v = 1 m/s)
- New Pipe (d=800) = 500 l/s (v = 1 m/s) - In Holland the transport velocity of 1 m/s is normal)
5Salinisation of the Kapuas Delta
A sustainable solution for the future?
6Salinisation of the Kapuas Delta
Short term / Long term
7Salinisation of the Kapuas Delta
Scope of solutionsShort term-Intake further upstream-Optimise capacity WTPs and decrease leakage-Update Penepat intake, including reservoir or extend pipeline to Biyung
Long term-Blocking salt water from the sea-Create fresh water reservoir for the dry period-Flushing KK by constructing canal Sukalanting
8Salinisation of the Kapuas Delta
Stop sea water from entering the river system
Construct a dam, must be able toRegulate river dischargePass the ships
It depends on the functional requirements
Location: River mouth (Jungkat) or Ambawang (idea of Prof. Arwin)
9Salinisation of the Kapuas Delta
A fresh water reservoir1.26 m3/s = 150,000 m3/day (in combination with Penepat)Dry season = 110 days
Reservoir: 12,000,000 m3
When you fill it up to two meters you need an area of approx. 600 ha.
10Salinisation of the Kapuas Delta
Flushing the Kapuas Kecil in the dry season
- Construct a bypass in the river near Sukalanting (not as simple as it looks like)