1 OLD GROWTH RETENTION. 2 Planning for Old Growth Retention Goals –Spatially locate and map OGMAs based on – maximizing biological effectiveness within.
Post on 18-Dec-2015
215 Views
Preview:
Transcript
2
Planning for Old Growth Retention
Goals
–Spatially locate and map OGMAs based on
– maximizing biological effectiveness within the constraints
–Legally establish objectives for OGMAs
3
AcronymsCFLB = Crown forested land base
THLB = timber harvesting land base
NC = non-contributing land base
OGMA = old growth management area
BEC variant = biogeoclimatic variant
TSR = timber supply review
SDM = statutory decision maker
WTR = wildlife tree retention
4
Planning for Old Growth Retention
Data Preparation
Delineate OGMAs
Develop WTR Targets
Write LU Objectives
Legally establish LU Objectives
Develop OGMA Targets
5
Data Preparation
Classify the landscape unit data set to:
– prepare old growth retention report (table 2.8)
– produce colour themed maps
8
Data Preparation - old growth retention report (table 2.8)
• provides an overview of all LUs in a planning area by BEC variant
– % old growth in NC to meet old growth target
– % old in THLB available to meet targets, if required
– % almost old in NC and THLB to meet targets, if required
– % old an almost old in the constrained THLB
– % of THLB that meets minimum harvest age
• allows for monitoring
9
Old Growth Retention Report (Table 2.8)
LandscapeUnit
(gross area)
(BiodiversityEmphasis)
BECvariant
(CFLB ha)
Oldgrowth
age
%Old
growthtarget
%OldNC
%almost
oldinNC
(120-140)
% oldTHLB
%almostold inTHLB(120 to
140)
%Old in
ConstrainedTHLB
%almost oldforest (120to 140) in
constrained
THLB
%Harvestable
(ha>minimumharvest
age fromTSR)
A(130 000)
(H)
SBSwk1(50
000)
SBSwk3(50
000)
>140
>140
16
16
20
20
8
10
8
10
15
15
1
0
4
3
40
35
10
Planning for Old Growth Retention
Data Preparation
Delineate and AssessOGMAs
Develop WTR Targets
Write LU Objectives
Legally Establish LU Objectives
Develop OGMA Targets
11
Planning for Old Growth Retention
STEPS
Step 1: Prepare OGMA targets report (accounting)
Step 2: delineate draft OGMAs (design)
Step 3: assess draft OGMAs
12
Planning for Old Growth Retention -Step 1: OGMA targets Report
Biodiversity emphasisOld growth targetExisting OG in NC Based on Table 2.8Existing OG in THLB-----------------------------------NC OGMA TargetTHLB OGMA Target Recruitment OGMAs
determined based on rules
13
a b c d e f g h i j
LU(grossarea)(ha)
BECvariant(CFLB)
(ha)
Oldgrowthtarget(ha)
Oldgrowthin NC*
(ha)
Oldgrowth
inTHLB(ha)
OGMANC*
target(ha)
OGMATHLBtarget(ha)
OGMArecruit-menttarget(ha)
HarvestOpportunity(ha forest >minimum
harvest agefrom TSR)
OGMAdelineation
considerations
A(130 000)highBiod.Emphasis
SBSwk1(50000)
8000 10 000(4000inPAs)
4500 6000(2000inPAs)
0 0 20 000 Entire target metin the N-C
OGMAs should bedesigned andestablished in theNC land base to6000 ha.
At least 2000 ha.from PAs areasmust be used toachieve OGMAtarget. If necessary,up to 4000 ha. couldbe used.
SBSwk3(50000)
8000 6000 5000 6000 2000 0 17 500 Entire target metin NC.
There are no parksor PAS, therefore,8000 ha. delineatedas OGMAs.
Table 3.1.OGMA Targets (ha) Report
14
Step 1: OGMA targets
Biodiversity emphasis affects OGMA targets:
Intermediate and high biodiversity emphasis
– establish objectives to meet entire OGMA target immediately
– develop and establish recruitment OGMAs
15
Step 1: OGMA targets
Low biodiversity emphasis
– draw down to 1/3 of the OGMA target, unless target met completely in NC or timber supply analysis indicates no impact or an established HLP directs otherwise
– develop recruitment strategy that meets entire OGMA target by the end of three rotations
16
Table 3.1.OGMA Targets (ha) Report
Old Growth TargetExisting OG in NCExisting OG in THLB
OGMA Target NCOGMA Target THLBRecruitment OGMAs
1000500500
20001000500
20001000500
10000
1000
Biodiversity Emphasis I L
------------------------------------------------------------------
17
Planning for Old Growth RetentionSTEP 2: Delineate OGMAs
Information required :
– OGMA Targets Report (Table 3.1)
– colour themed maps (from Data Preparation process)
– relevant higher level plan direction (e.g. RMZ objectives)
– strategic land use plans (LRMPs, KBLUP, CCLUP)
– RLUPS priorities
– approved operational plans
– air photos, ortho-photos, satellite images
19
Biological considerations - 1
Review “old” or the oldest available stands first
No single “correct” way of addressing biological considerations to be included in OGMAs
Primary biological considerations (core values):
– size (interior/no interior habitat)
– connectivity
– species composition
– representation/rare ecosystems
20
Biological considerations - 2
Don’t do the same thing everywhere
Consider 3 spatial scales:
– stand
– single LU
– larger landscape
Consider likely longevity of the patch in context of the landscape over time
21
Biological considerations - 3
Larger patches have interior habitat
Smaller habitats dominated by edge effects
Interior habitat & edge effects also influenced by shape of the OGMA
Consider what is needed -- several small OGMAs OR fewer large OGMAs (up to target)
22
Biological Consideration - 4
Representation is a core concept in conservation biology -- “keeping all the pieces”
Representation within policy constraints -- but note significant gaps
– generally restricted to variant due to timber impacts
Try to capture the range of old forest ecosystems within OGMAs
23
Biological consideration - 5
Rare by there very nature means they are not common, however contain unique biodiversity values.
Where rare old forest site series are known and mapped include them in OGMAs
If rare is not known, reserve some of old growth budget to deal with them
– use forest cover maps, local knowledge and CDC information to locate potentially rare ecosystems
24
Biological considerations - 5
Connectivity:
Try to accommodate -- but no extra budget.
Considerations:
– Consider regional connectivity
– Maintain linkages for movement, e.g., low passes in otherwise mountainous/steep terrain
– Distance between older patches (relates to probability of moving between patches)
– Stand structure can increase “connectivity”
26
Step 2: Operational Considerations
Minimize impacts to forest licencees by:
– where suitable, use most constrained THLB first
– avoid locating OGMAs over approved category A cutblocks (exception - known rare ecosystem)
– avoid locating OGMAs where they will impact main access routes or isolate harvestable timber
27
Operational Considerations - 2
Operational activities permitted in OGMAs which should proceed in a manners sensitive to old growth values:
– mineral or gas exploration and development activities
– range use
– haul road construction (only if no other reasonable and cost effective options exist)
28
Operational Considerations -3
OGMAs are intended to be areas where commercial harvesting is normally prohibited
If operational activities are required, proceed sensitive to old growth values
If operational activities significantly impact old growth attributes, OGMA location should be reassessed.
30
Delineate OGMAs Summary of Steps
Determine old growth targets by variant for THLB and NC
Assess all potential patches (considering all BECs together)
Determine primary biological considerations
– Ideally, ground-truth “old” attributes of potential OGMAs
– Record presence of features/attributes (for each patch for ranking and future reference)
31
Delineate OGMAsSummary of Steps - 2
Rank potential OGMAs
Design to balance OGMA biological values with operational considerations
32
Step 2: Delineate OGMAsRecruitment
Recruitment occurs where not enough existing old forest available to meet targets
- applies to both NC and THLB
- use the biologically best NC or THLB when recruiting.
33
Step 2: Delineate OGMAs Recruitment
Developing recruitment strategies
Immediate recruitment
– below old growth target in intermediate or high emphasis
– below 1/3 old growth target in low emphasis
Recruitment over 3 rotations
– applies to low biodiversity emphasis LUs
34
Step 2: Delineate OGMAsRecruitment
Locating recruitment OGMAs:
– follow biodiversity and operational considerations
– consider suitable (I.e biologically equivalent) younger forest in the NC prior to impacting the THLB
– high and intermediate emphasis LUs
– choose forested areas that will maximize biodiversity conservation values in the shortest possible time frame
35
Planning for Old Growth RetentionStep 3: Assess OGMAs
Prepare tabular summary of OGMAs by Landscape Unit: (Table 3.2)
– document actual OGMA placed in NC and the THLB
– document recruitment OGMAs
– documents priorities for OGMA establishment
Develop a data base to track individual OGMA and their attributes
– documentation of biodiversity attributes captured in each OGMA
37
OGMA exercise
Group Exercise
– 4- 5 people/group
Materials
– a set of various colour-themed maps
– LUPG chapter 3
– Workbook/handout
38
OGMA exercise
Time
– 1 hour basic exercise, 30 - 45 minutes to report out/discuss
– 30 minutes to assess wildcards, 30 minutes to report out
39
OGMA exercise Purpose
To carry out the ‘accounting step’ - calculate the old growth targets for the NC and THLB
To think about the ecological and operational considerations (included in the LUPG), when locating OGMAs
To promote group discussion and group solutions regarding options for OGMA locations
To delineate OGMAs up to the target level