VAB4423: Design of Offshore Structures Chapter 1: General Introduction GLOSSARY OF TERMS AIR GAP: Clearance between the top of maximum wave and underside of the topside CAISSONS…
1. 1 Climbing Everest to change the world. 2. 2 3. 3 ZERO is possible. Child mortality rate has been reduced by 41% since 1990. 4. 4 Expedition “Climbing for the Children”…
1. Local Content Strategy on Implementing Construction Plans THOMAS DOUGLAS NIGERIA LIMITED A R C H I T E C T U R E • E N G I N E E R I N G ▪ C O N S T RU C T I O N LAGOS…
1. LightCap 300Solar Powered Lantern,BPA free Water Bottle and a Waterproof Container All under one lid..... 2. LightCap 300 Brighter, Lighter Stronger and MoreEfficient…
OFFSHORE CONSTRUCTION OFFSHORE CONSTRUCTION INTRODUCTION Offshore construction is the installation of structures and pipelines in a marine environment for the production…
Slide 1 Basic Port Assumptions She will be 16’ draft, 164’ sparred length If at a T dock, we need at least 80’ dockage with overhangs either side Need 50’ for a slip…
EVLA Feeds CDR Feed Radomes Radome Windows All of the feeds will require a radome (or weather window) to provide environmental protection. These radomes must: be low loss…
A 1977 album by jazz group Weather Report? A 1933 novel by P.G. Wodehouse? Stormy Conditions, rough seas, high winds? Song on Jarvis Cockerâs debut solo album? All of the…
Lessons Learned From Template Installation in Harsh Environments T.Jacobsen, T.Næss Subsea 7 1. ABSTRACT Subsea templates are traditionally transported to the relevant…
black flag a short story by Ferret c a v e p u b l i c a t i o n s 2 0 1 0 black flag a short story by Ferret c a v e p u b l i c a t i o n s 2 0 1 0 S teve is on autopilot,…