DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Brief recap

Status of the LLTT(TPU) project G.Punzi (Pisa) on behalf of the LLTT group Meeting with INFN referees 20/3/2014 Brief recap - Feb. 2013: LHCb Trigger workshop: First LHCb…

Documents BABAR Risks and Mitigations

BABAR Risks and Mitigations David B. MacFarlane B Factory Operations Review April 26, 2006 Sources of risk Installation and schedule risk associated with replacing barrel…

Documents Future Dataflow Bottlenecks

Future Dataflow Bottlenecks Christopher OâGrady with A. Perazzo and M. Weaver Babar Dataflow Group View of the DAQ System A series of parallel assembly lines System runs…

Documents AmmoLand Gun News April 30th 2011

30 April 2011 Todayâs Tabbloid PERSONAL NEWS FOR [email protected] 1 AMMOLAND.COM SHOOTING SPORTS NEWS Alpine Archeryâs Bear Claw Quivers â Made For The Treestand Hunter…

Documents Hongyu Fu, Trigger group 01-6-26

Hongyu Fu, Trigger group 01-6-26 The Monte Carlo for Trigger Design of BES3 Scintillating Fibre BEMC Outline: Introduction to BES3 Scin-fibre BEMC Trigger Monte Carlo Procedures…

Documents GLAST LAT ProjectOnline Peer Review – July 20, 2004 4.1.9 - Integration and Test R. Claus 1 GLAST....

Slide 1 GLAST LAT ProjectOnline Peer Review – July 20, 2004 4.1.9 - Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review Online…

Documents 15 April 2008 24th ALICE RRB J. Schukraft 24 th ALICE RRB Collaboration News Project Status ...

24th ALICE RRB Collaboration News Project Status Production (TOF, TRD, PHOS, PMD) Installation Commissioning CERN-RRB-2008-20 Collaboration News New Institutes Purdue (USA)…