RIG MAINTENANCE REPORT #1 of 12 Rig#: Make/Model: Serial #: Drilling Crew: Service Technician: Inspection Date: Location: Component: OK Needs repair Get maintenance and safety…
1 LHD Pump Type: Pump Serial Number: Date: Purchaser: Purchaser’s Order Number: GIW Work Order Number: Shipped To: Maintenance Manual 2369.8000/A1-90 G2 (09/01/05) A KSB…
Air Conditioning Air Conditioning Planning Requirements Refg Cycle Refrigerants R134a, which is a substance of the ethane group with the formula CH2FCF3 and has a normal…
Slide 1 Emulsion Coolant Recovery System-InstaPure for Recovery and Reuse of water soluble coolants. Pure Tech India, A-5, Trec step, Thuvakudi, Trichy -620 015 Telephone:00…
Hyundai PumP Vertical Mixed / Axial Flow Circulating Water Pump for Yonghung Thermal Power Plant, Units 1 & 2, KOREA (1100m3/min X 20m X 4600kW, Model 3000VKANM, Variable…
TYPICAL BOP CONTROL UNIT SCHEMATIC 1. RIG AIR SUPPLY: Normal air supply is at 125 psi (9 bar). Higher air pressure may require an air regulator for No. 88660 air pumps. 2.…
Programme and technical specifications Purifying Moving Designing Vitalising Lighting Laying 2 Moving water 2 3 Every water project depends on circulation, without a pump…
KIRLOSKAR PUMPS AND SYSTEMS FOR FIRE FIGHTING 1. 216 Suction strainer M.S. (Galvanised) 2. 211 Bell mouth C.I. IS 210 Gr FG 200 3. 120 Pump bowl C.I. IS 210Gr. FG 200 4.…
Rapid Freeze ICE FLAKERS INSTALLATION & SERVICE MANUAL and parts catalog General Purpose Flake Ice Machines 1000, 2000, & 3000 • Remote Low side Series (RLE) •…