Part 6 Synthesis of Heat Exchanger Networks 6.1 Sequential Synthesis Minimum Utility Cost Example 1 Steam: 500 C Cooling water: 20 â 30 C Minimum recovery approach temperature…
Part 6 Synthesis of Heat Exchanger Networks 6.1 Sequential Synthesis Minimum Utility Cost Example 1 Steam: 500 C Cooling water: 20 â 30 C Minimum recovery approach temperature…