Slide 1Superconductor Stability CERN Accelerator School Superconductivity for Accelerators Erice, April 25 th – May 4 th, 2013 [email protected] Slide 2 Plan of the…
Slide 1 1 Letter of Rossi to Peggs (agred with Schmickler and Devred) April 2005 We strongly believe that the major steps in the near term are: 1)Construction of a quadrupole…
Slide 1 1 Open Science Grid in Adolescence: 2012-2016 Ruth Pordes Fermilab Slide 2 Ruth PordesOSG@CHEP, New York, 2012 The OSG Eco-System The Open Science Grid (OSG) advances…
Slide 1 R&D STUDIES FOR CMS HE AT THE SUPER LHC CONDITIONS & INCLUSIVE SEARCH FOR NEW PHYSICS AT CMS WITH JETS AND MISSING MOMENTUM SIGNATURE Elif Aslı Albayrak…
Coupler, LOM and HOM Damping of Crab/Deflecting Cavity Derun Li Center for Beam Physics LHC-CC08 Workshop Brookhaven National Laboratory February 25 ~ 26, 2008 LOM and HOM…
Geant4 10.0-beta Geant4 Towards major release 10 Gabriele Cosmo, CERN PH/SFT On behalf of the Geant4 Collaboration Outline Introduction of multi-threading for event-level…
Current understanding and status of our dipole magnet development for HL-LHC Progress Report on Magnet R&D and Further Plans for CERN-KEK Collaboration T. Nakamoto KEK…
Lepton Nucleon Scattering at TeV cms Energies - the Large Hadron Electron Collider Project - LHeC - Max Klein IoP meeting on the LHC upgrade, Liverpool, 27/6/2007 New Physics…
Radiation Facilities at CERN - IRRAD CERN PS East Hall - Irradiation Facilities 24 GeV/c protons T7 & T8 beam lines in East Area Proton irradiations Direct exposure to…
Title Long-range and head-on beam-beam compensation studies at RHIC with lessons for the LHC W. Fischer, N. Abreu, R. Calaga, Y. Luo, C. Montag, G. Robert-Demolaize and collaborators…