DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents LV and HV status of the RPC system RPC detector and trigger group.

Slide 1 LV and HV status of the RPC system RPC detector and trigger group Equipment type   Total installed spare % of spare SY1527 SY1527 5 4 1 25,0% A3485 A3485 5 3 2…

Documents HF UPGRADE PROJECT

HF UPGRADE PROJECT Y. Onel For HF Upgrade Project Collaboration Nov 7, 2011 * HF PROJECT REVIEW I Upgrade HF Internal Pre-PRR, October 5, 2011 HF Project News Yasar Onel…

Documents 8:309:00Executive SessionNSF/consultants 9:009:30Overview of SB groupGrannis

8:30 9:00 Executive Session NSF/consultants 9:00 9:30 Overview of SB group Grannis 9:30 10:00 Atlas overview, HV system, outreach McCarthy 10:00 10:30 Atlas calibrations,…

Documents Status of the Front Tracker GEM and INFN Electronics

12/Dec/2012 SBS-Meeting * of 24 Status of the Front Tracker GEM and INFN Electronics 2013 â Feb â 20 SBS Weekly Meeting GEM Assembling SRS â INFN Electronics comparison…

Documents Test on installed RPCs with the gas mixture. Preliminary results.

Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova, Zagreb) OPERA collaboration…

Documents HV Report

HV Report F.Cavallari (INFN Roma) High Voltage set-up in M0â 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1 blue cable from Crate…

Documents Modeling of Squirrel Cage Turbine for Voltage Dips Studies

Modeling of Squirrel Cage Turbine for Voltage Dips Studies M.P. Comech, S. Martín, J. Mur, I. Franco, M. García-Gracia The number of wind energy installations is rapidly…

Documents IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004

IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1st module assembled Princeton workshop Strips…

Documents Update on LS1 Activities

LS1 Muon Meeting Update on LS1 Activities W.Baldini, N. Bondar, O.Maev,B. Schmidt LS1 Muon Meeting June-26th 2014 Ongoing Activities Fixing problematic chambers in M2-5 (broken…